Follow
Ehsan Molaee
Ehsan Molaee
Industrial Engineering, SPM Company
Verified email at spm.co.ir
Title
Cited by
Cited by
Year
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
E Molaee, G Moslehi, M Reisi
Computers & Mathematics with Applications 60 (11), 2909-2919, 2010
282010
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraint
E Molaee, G Moslehi, M Reisi
Computers & Mathematics with Applications 62 (9), 3622-3641, 2011
132011
Minimizing maximum tardiness on a single machine with family setup times and machine disruption
E Molaee, R Sadeghian, P Fattahi
Computers & Operations Research 129, 105231, 2021
72021
Minimizing the number of tardy jobs on a single machine with an availability constraint
E Molaee, G Moslehi
Journal of Industrial Engineering 2014, 2014
62014
Modeling a single machine scheduling problem with batch production and the random breakdown and solving it by branch and bound method
E Molaee, R Sadeghian, P Fattahi
Research in Production and Operations Management 13 (2), 121-136, 2022
2022
The system can't perform the operation now. Try again later.
Articles 1–5