Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs
H Saberi-Aliabad, M Reisi-Nafchi, G Moslehi
Journal of Cleaner Production 249, 119393, 2020
502020
A hybrid genetic and linear programming algorithm for two-agent order acceptance and scheduling problem
M Reisi-Nafchi, G Moslehi
Applied Soft Computing 33, 37-47, 2015
412015
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling
B Akbarzadeh, G Moslehi, M Reisi-Nafchi, B Maenhout
European Journal of Operational Research 278 (2), 596-614, 2019
292019
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
E Molaee, G Moslehi, M Reisi
Computers & Mathematics with Applications 60 (11), 2909-2919, 2010
282010
A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering
B Akbarzadeh, G Moslehi, M Reisi-Nafchi, B Maenhout
Journal of scheduling 23, 265-288, 2020
242020
The split heterogeneous vehicle routing problem with three-dimensional loading constraints on a large scale
M Rajaei, G Moslehi, M Reisi-Nafchi
European Journal of Operational Research 299 (2), 706-721, 2022
202022
Minimizing the number of tardy jobs and maximum earliness in the single machine scheduling using an artificial immune system
M Reisi, G Moslehi
The International Journal of Advanced Manufacturing Technology 54, 749-756, 2011
162011
A two-agent scheduling problem in a two-machine flowshop
M Ahmadi-Darani, G Moslehi, M Reisi-Nafchi
International Journal of Industrial Engineering Computations 9 (3), 289-306, 2018
142018
Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraint
E Molaee, G Moslehi, M Reisi
Computers & Mathematics with Applications 62 (9), 3622-3641, 2011
132011
A comprehensive approach for railway crew scheduling problem (case study: Iranian railway network)
AK Khosravi, MT Tamannaei, M Reisi-Nafchi
International Journal of Transportation Engineering 4 (3), 197-210, 2017
122017
Maximizing the profit in customer’s order acceptance and scheduling problem with weighted tardiness penalty
S Geramipour, G Moslehi, M Reisi-Nafchi
Journal of the Operational Research Society 68, 89-101, 2017
102017
Integrating two–agent scheduling and order acceptance problems to maximise total revenue by bounding each agent penalty function
M Reisi–Nafchi, G Moslehi
International Journal of Services and Operations Management 20 (3), 358-384, 2015
92015
Dynamic production planning model: a dynamic programming approach
H Khaledi, M Reisi-Nafchi
The International Journal of Advanced Manufacturing Technology 67, 1675-1681, 2013
82013
Cockpit crew pairing problem in airline scheduling: Shortest path with resources constraints approach
NM REISI, G Moslehi
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH …, 2013
62013
Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem
V Nasrollahi, G Moslehi, M Reisi-Nafchi
Operational Research 22 (2), 1403-1442, 2022
52022
Two-agent order acceptance and scheduling to maximise total revenue
M Reisi-Nafchi, G Moslehi
European Journal of Industrial Engineering 9 (5), 664-691, 2015
52015
Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs
H Sanati, G Moslehi, M Reisi-Nafchi
EURO Journal on Computational Optimization 11, 100052, 2023
42023
New integer programming models for slab stack shuffling problems
P Rajabi, G Moslehi, M Reisi-Nafchi
Applied Mathematical Modelling 109, 775-796, 2022
32022
Operating Room Scheduling Considering Patient Priorities and Operating Room Preferences: A Case Study
S Boosaiedi, M Reisi-Nafchi, G Moslehi
Int. J. Ind. Eng. Prod. Res 33, 1-21, 2022
22022
Customer's order acceptance and scheduling to maximise total profit
M Fazeli-Kebria, G Moslehi, N Mollaverdi, M Reisi-Nafchi
International Journal of Operational Research 34 (2), 301-320, 2019
22019