Kunshan Wu
Title
Cited by
Cited by
Year
The association among project manager's leadership style, teamwork and project success
LR Yang, CF Huang, KS Wu
International journal of project management 29 (3), 258-267, 2011
5932011
An optimal replenishment policy for non-instantaneous deteriorating items with stock-dependent demand and partial backlogging
KS Wu, LY Ouyang, CT Yang
International Journal of Production Economics 101 (2), 369-384, 2006
4802006
Mixture inventory model with backorders and lost sales for variable lead time
LY Ouyang, NC Yeh, KS Wu
Journal of the Operational Research Society 47 (6), 829-832, 1996
4671996
A study on an inventory model for non-instantaneous deteriorating items with permissible delay in payments
LY Ouyang, KS Wu, CT Yang
Computers & Industrial Engineering 51 (4), 637-651, 2006
2802006
Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time
LY Ouyang, KS Wu, CH Ho
International Journal of Production Economics 92 (3), 255-266, 2004
2802004
A business strategy selection of green supply chain management via an analytic network process
CC Chen, HS Shih, HJ Shyur, KS Wu
Computers & Mathematics with Applications 64 (8), 2544-2557, 2012
2192012
Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction
HC Chang, LY Ouyang, KS Wu, CH Ho
European Journal of Operational Research 170 (2), 481-495, 2006
2172006
Integrating altruism and the theory of planned behavior to predict patronage intention of a green hotel
YM Teng, KS Wu, HH Liu
Journal of Hospitality & Tourism Research 39 (3), 299-315, 2015
2112015
Mixture inventory model involving variable lead time with a service level constraint
LY Ouyang, KS Wu
Computers & Operations Research 24 (9), 875-882, 1997
2041997
An EOQ inventory model for items with Weibull distribution deterioration, ramp type demand rate and partial backlogging
KS Wu
Production Planning & Control 12 (8), 787-793, 2001
1932001
An integrated vendor–buyer inventory model with quality improvement and lead time reduction
LY Ouyang, KS Wu, CH Ho
International Journal of Production Economics 108 (1-2), 349-358, 2007
1912007
A replenishment policy for deteriorating items with ramp type demand rate
KS Wu, LY Ouyang
Proceedings-National Science Council Republic of China Part a Physical …, 2000
1332000
A minimax distribution free procedure for mixed inventory model with variable lead time
LY Ouyang, KS Wu
International Journal of Production Economics 56, 511-516, 1998
1311998
Rough set theory in analyzing the attributes of combination values for the insurance market
JY Shyng, FK Wang, GH Tzeng, KS Wu
Expert Systems with Applications 32 (1), 56-64, 2007
1302007
An inventory model for deteriorating items with exponential declining demand and partial backlogging
LY Ouyang, KS Wu, MC Cheng
Yugoslav Journal of Operations Research 15 (2), 277-288, 2005
1142005
An integrated single-vendor single-buyer inventory system with shortage derived algebraically
KS Wu, LY Ouyang
Production Planning & Control 14 (6), 555-561, 2003
782003
Analysis of optimal vendor-buyer integrated inventory policy involving defective items
LY Ouyang, KS Wu, CH Ho
The International Journal of Advanced Manufacturing Technology 29 (11), 1232 …, 2006
772006
Coordinating replenishment and pricing policies for non-instantaneous deteriorating items with price-sensitive demand
KS Wu, LY Ouyang, CT Yang
International Journal of Systems Science 40 (12), 1273-1281, 2009
692009
Relationships among project manager’s leadership style, team interaction and project performance in the Taiwanese server industry
LR Yang, KS Wu, FK Wang, PC Chin
Quality & Quantity 46 (1), 207-219, 2012
532012
Retailer's ordering policy for non-instantaneous deteriorating items with quantity discount, stock-dependent demand and stochastic backorder rate
LY Ouyang, KS Wu, CT Yang
Journal of the Chinese Institute of Industrial Engineers 25 (1), 62-72, 2008
532008
The system can't perform the operation now. Try again later.
Articles 1–20