| Prediction of site overhead costs with the use of artificial neural network based model A Leśniak, M Juszczyk Archives of Civil and Mechanical Engineering 18 (3), 973-982, 2018 | 48 | 2018 |
| ANN based approach for estimation of construction costs of sports fields M Juszczyk, A Leśniak, K Zima Complexity 2018, 2018 | 43 | 2018 |
| Prospects for the use of BIM in Poland and the Czech Republic–Preliminary research results M Juszczyk, M Výskala, K Zima Procedia Engineering 123, 250-259, 2015 | 39 | 2015 |
| Errors in the preparation of design documentation in public procurement in Poland M Juszczyk, R Kozik, A Leśniak, E Plebankiewicz, K Zima Procedia Engineering 85, 283-292, 2014 | 39 | 2014 |
| The challenges of nonparametric cost estimation of construction works with the use of artificial intelligence tools M Juszczyk Procedia engineering 196, 415-422, 2017 | 35 | 2017 |
| Modelling construction site cost index based on neural network ensembles M Juszczyk, A Leśniak Symmetry 11 (3), 411, 2019 | 29 | 2019 |
| The use of artificial neural networks for residential buildings conceptual cost estimation M Juszczyk AIP Conference Proceedings 1558 (1), 1302-1306, 2013 | 27 | 2013 |
| Application of committees of neural networks for conceptual cost estimation of residential buildings M Juszczyk AIP Conference Proceedings 1648 (1), 600008, 2015 | 24 | 2015 |
| Current issues of BIM-based design change management, analysis and visualization M Juszczyk, A Tomana, M Bartoszek Procedia engineering 164, 518-525, 2016 | 16 | 2016 |
| Trends, costs, and benefits of green certification of office buildings: a Polish perspective E Plebankiewicz, M Juszczyk, R Kozik Sustainability 11 (8), 2359, 2019 | 13 | 2019 |
| Estimation of task completion times with the use of the PERT method on the example of a real construction project E Plebankiewicz, M Juszczyk, J Malara Archives of Civil Engineering 61 (3), 2015 | 13 | 2015 |
| Identyfikacja i ocena czynników wpływających na wydajność pracy robotników budowlanych E Plebankiewicz, M Juszczyk, J Malara Przegląd Naukowy. Inżynieria i Kształtowanie Środowiska 23 (3 [65]), 2014 | 12 | 2014 |
| Site overhead cost index prediction using RBF Neural Networks M Juszczyk, A Leśniak DEStech Transactions on Economics, Business and Management, 2016 | 11 | 2016 |
| Analiza strategiczna przedsiębiorstwa budowlanego i jego otoczenia: wybrane problemy i metody: podręcznik dla studentów wyższych szkół technicznych E Starzyk, M Juszczyk, R Kozik | 9* | 2007 |
| Forecasting of sports fields construction costs aided by ensembles of neural networks M Juszczyk, K Zima, W Lelek Journal of Civil Engineering and Management 25 (7), 715-729, 2019 | 8 | 2019 |
| Application of PCA-based data compression in the ANN-supported conceptual cost estimation of residential buildings M Juszczyk AIP Conference Proceedings 1738 (1), 200007, 2016 | 8 | 2016 |
| Modelowanie kosztów realizacji budynków mieszkalnych z zastosowaniem zespołów sztucznych sieci neuronowych M Juszczyk Technical Transactions, series Civil Engineering 107 (2), 167-175, 2010 | 8 | 2010 |
| On the Search of Models for Early Cost Estimates of Bridges: An SVM-Based Approach M Juszczyk Buildings 2020 (10(1), 2), 2019 | 7 | 2019 |
| Formula for Determining the Construction Workers Productivity Including Environmental Factors J Malara, E Plebankiewicz, M Juszczyk Buildings 2019 (9(12)), 240, 2019 | 6 | 2019 |
| Implementation of the ANNs ensembles in macro-BIM cost estimates of buildings’ floor structural frames M Juszczyk AIP Conference Proceedings 1946 (1), 020014, 2018 | 6 | 2018 |