Follow
Milad Baghalzadeh Shishehgarkhaneh
Milad Baghalzadeh Shishehgarkhaneh
Verified email at monash.edu - Homepage
Title
Cited by
Cited by
Year
Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in construction industry: A review, bibliometric, and network analysis
M Baghalzadeh Shishehgarkhaneh, A Keivani, RC Moehler, N Jelodari, ...
Buildings 12 (10), 1503, 2022
872022
Energy valley optimizer: a novel metaheuristic algorithm for global and engineering optimization
M Azizi, U Aickelin, H A. Khorshidi, M Baghalzadeh Shishehgarkhaneh
Scientific Reports 13 (1), 226, 2023
462023
Shape and size optimization of truss structures by Chaos game optimization considering frequency constraints
M Azizi, U Aickelin, HA Khorshidi, MB Shishehgarkhaneh
Journal of Advanced Research 41, 89-100, 2022
302022
BIM-based resource tradeoff in project scheduling using fire hawk optimizer (FHO)
MB Shishehgarkhaneh, M Azizi, M Basiri, RC Moehler
Buildings 12 (9), 1472, 2022
282022
Optimal design of low-and high-rise building structures by Tribe-Harmony Search algorithm
M Azizi, S Talatahari, M Basiri, MB Shishehgarkhaneh
Decision Analytics Journal 3, 100067, 2022
202022
Optimum design of truss structures by Material Generation Algorithm with discrete variables
M Azizi, MB Shishehgarkhaneh, M Basiri
Decision Analytics Journal 3, 100043, 2022
202022
Optimization of large-scale frame structures using fuzzy adaptive quantum inspired charged system search
S Talatahari, M Azizi, M Toloo, M Baghalzadeh Shishehgarkhaneh
International journal of steel structures 22 (3), 686-707, 2022
192022
Blockchain in the Construction Industry between 2016 and 2022: A Review, Bibliometric, and Network Analysis
MB Shishehgarkhaneh, RC Moehler, SF Moradinia
Smart Cities 6 (2), 819-845, 2023
132023
Squid Game Optimizer (SGO): a novel metaheuristic algorithm
M Azizi, M Baghalzadeh Shishehgarkhaneh, M Basiri, RC Moehler
Scientific reports 13 (1), 5373, 2023
122023
Application of classic and novel metaheuristic algorithms in a BIM-based resource Tradeoff in dam projects
M Baghalzadeh Shishehgarkhaneh, SF Moradinia, A Keivani, M Azizi
Smart Cities 5 (4), 1441-1464, 2022
112022
Toward nearly zero energy building designs: a comparative study of various techniques
AH Daqiqnia, S Fard Moradinia, M Baghalzadeh Shishehgarkhaneh
AUT Journal of Civil Engineering 5 (2), 339-356, 2021
112021
Optimum design of truss structures with atomic orbital search considering discrete design variables
M Azizi, AW Mohamed, MB Shishehgarkhaneh
Handbook of Nature-Inspired Optimization Algorithms: The State of the Art …, 2022
92022
Time and Cost Management of Dam Construction Projects based on Building Information Modeling (BIM) (A Case Study in Kurdistan Province)
M Baghalzadeh Shishehgarkhaneh, S Fard Moradinia, A Keivani
7th International Congress on Civil Engineering, Architecture and Urban …, 2022
82022
Internet of Things (IoT)
MB Shishehgarkhaneh, A Keivani, RC Moehler, N Jelodari, SR Laleh
Building Information Modeling (BIM), and Digital Twin (DT) in Construction …, 2022
72022
The role of Building Information Modeling (BIM) in reducing the number of project dispute resolution sessions
M Baghalzadeh Shishehgarkhaneh, S Fard Moradinia
The 8th National Conference on Civil Engineering, Architecture and …, 2020
72020
Design Optimization of Truss Structures by Crystal Structure Algorithm
M Azizi, MB Shishehgarkhaneh, M Basiri
52022
Fire Hawk Optimizer for Resource Trade-off in Project Scheduling based on BIM
MB Shishehgarkhaneh, M Azizi, M Basiri, R Moehler
Preprints, 2022
32022
Hybrid Social Network Search and Material Generation Algorithm for Shape and Size Optimization of Truss Structures
M Saraee, A Jafari, D Yazdani, MB Shishehgarkhaneh, B Nouhi, ...
Hybrid Metaheuristics in Structural Engineering: Including Machine Learning …, 2023
22023
Exploring the Impact of Social Media Use on Team Feedback and Team Performance in Construction Projects: A Systematic Literature Review
R Karimi, M Baghalzadeh Shishehgarkhaneh, RC Moehler, Y Fang
Buildings 14 (2), 528, 2024
12024
Construction supply chain risk management
MB Shishehgarkhaneh, RC Moehler, Y Fang, H Aboutorab, AA Hijazi
Automation in Construction 162, 105396, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20