Follow
Dr. Zubair Ahmed Memon
Dr. Zubair Ahmed Memon
Department of Engineering Management, Prince Sultan University, Riyadh, Saudi Arabia
Verified email at psu.edu.sa
Title
Cited by
Cited by
Year
A systematic approach for monitoring and evaluating the construction project progress
ZA Memon, MZA Majid, M Mustaffar
Journal of the Institution of Engineers Malaysia 67 (3), 26-32, 2006
642006
An automatic project progress monitoring model by integrating auto CAD and digital photos
ZA Memon, MZA Majid, M Mustaffar
Computing in Civil Engineering (2005), 1-13, 2005
642005
Non Excusable Delays in Construction Industry: A Causal Study
Zubair Ahmed Memon, Shabir Hussain KHahro
Engineering, Technology & Applied Science Research 8 (6), 3561-3564, 2018
142018
A systematic procedure for developing the 3D model to evaluate the construction project progress
Z Ahmed Memon, M Zaimi Abd, M Mustaffar
Construction Innovation 7 (2), 187-199, 2007
132007
IMPROVING MATERIAL WASTE MANAGEMENT PERFORMANCE: AN ATTRIBUTE STUDY FOR PROVENTIAL PROJECTS
ZAM Shabir Hussain KHahro, Nafees Ahmed Memon, Tauha Hussain Ali
International Journal of Civil Engineering and Technology (IJCIET) 7 (6 …, 2016
12*2016
The use of inforamtion technology techniques in the construction industry of Pakistan
ZA Memon, NA Memon, AH Chohan
Mehran University Research Journal of Engineering & Technology 31 (2), 271-280, 2012
122012
Identifying the Critical Factors Affecting Safety Program Performance for Construction Project within Pakistan Constructino Industry
ZA MEMON
Mehran University Research Journal of Engineering and Technology 32 (2), 1-8, 2013
112013
Identifying the critical factors affecting safety program performance for construction projects within Pakistan construction industry
ZA Memon, KL Khatri, AB Memon
Mehran University Research Journal of Engineering and Technology 32 (2), 269-276, 2013
112013
Improving Labour Productivity: An Attribute Case Study of Building Sector Projects in Pakistan
ZAM Shabir Hussain KHahro, Nafees Ahmed Memon, Tauha Hussain Ali
International Journal of Applied Engineering Research 11 (23), 11121-11125, 2016
102016
Remedial measure for delays at construction stage
ZA Memon
Mehran University Research Journal of Engineering and Technology 23 (1), 9-20, 2004
102004
Conceptual digital monitoring model for evaluating the progress of work
MZ Abd Majid, ZA Memon, M Mustaffar
CONVR 2004: Conference on Construction Applications of Virtual Reality, 14-15, 2004
92004
GIS BASED LAND SUITABILITY ANALYSIS FOR PETROL STATIONS
ZAM Shabir Hussain KHahro
International Journal of Civil Engineering and Technology (IJCIET) 8 (10), 01-06, 2017
8*2017
ISO in the construction and manufacturing companies: A case study from the construction industry of Hyderabad and Karachi, Pakistan
NA Memon, QMM Abro, ZA Memon
Mehran University Research Journal of Engineering & Technology 30 (2), 339-348, 2011
82011
Digitalizing construction monitoring (DCM): An overview of Malaysian Construction industry and proposing prototype software’
ZA Memon, MZA Majid, M Mustaffar
Proceedings of the 6th Asia-Pacific Structural Engineering and Construction …, 2006
72006
The use of photogrammetry techniques to evaluate the construction project progress
ZA Memon, MZA Majid, M Mustaffar
Jurnal Teknologi, 1–15-1–15, 2006
72006
Systematic Approach for Developing As-built Schedule for Construction Project
ZA Memon, MZ Abd Majid, NIM Yusoff, M Mustaffar
Jurnal Kejuruteraan 18, 135-146, 2006
72006
Evaluation of user satisfaction towards construction faults in medium-cost housing of under-developing metropolis
AH Chohan, AR Che-Ani, Z Memon, MM Tahir, NKG Abdullah, NH Ishak
American Journal of Scientific Research 13 (1), 6-17, 2011
62011
Utilization of photogrammetry techniques to digitalize the construction site progress
ZA Memon, Muhd. Zaimi Abd. Majid, M Mustaffar
Universiti Teknologi Malaysia, 2004
62004
Investigating the issue of project progress performance and proposing a prototype software: A case study of the Malaysian construction industry
ZA Memon, MZ AbdMajid, M Mustaffar
Joint International conference on computing and decision making in civil and …, 2006
52006
Determination of deflection basin using pavement modelling computer programs and finite element method
SAP Rosyidi, A Hamim, AM Taib, NAA Jamaludin, ZA Memon, NIM Yusoff, ...
Jurnal Teknologi 82 (4), 2020
32020
The system can't perform the operation now. Try again later.
Articles 1–20