Follow
Yasser ELSHAYEB
Yasser ELSHAYEB
Professor of Engineering
Verified email at aucegypt.edu - Homepage
Title
Cited by
Cited by
Year
Discovery of a big void in Khufu’s Pyramid by observation of cosmic-ray muons
K Morishima, M Kuno, A Nishio, N Kitagawa, Y Manabe, M Moto, ...
Nature 552 (7685), 386-390, 2017
4522017
Fuzzy Reasoning for the analysis of risks in geotechnical engineering Application to a French Case
Y El-Shayeb, T Verdel, C Didier
5. European Congress on Intelligent Techniques & Soft Computing, 1997
141997
Towards the determination of surface collapse type over abandoned mines in the Lorraine iron basin
Y El-Shayeb, S Kouniali, JP Josien, Y Gueniffey
International symposium of the international society for rock mechanics …, 2001
132001
Precise characterization of a corridor-shaped structure in Khufu’s Pyramid by observation of cosmic-ray muons
S Procureur, K Morishima, M Kuno, Y Manabe, N Kitagawa, A Nishio, ...
Nature Communications 14 (1), 1144, 2023
122023
Paramètres d'affaissement pour la hiérarchisation des zones à risque dans le bassin ferrifère lorrain
M Al Heib, JP Josien, Y El Shayeb
Colloque International Après-mine 2003, NC, 2003
102003
Apport à la logique floue à l’évaluation de l’aléa “Mouvement de Terrain des sites géotechniques”: propositions pour une méthodologie générale
Y El-Shayeb
Institut National Polytechnique de Lorraine. École des mines de Nancy, 1999
71999
Geotechnical Landslide Risk Analysis on Historical Monuments: Methodological Approach
Y ElShayeb, T Verdel
Landslides: Risk Analysis and Sustainable Disaster Management, 225-230, 2005
42005
Overcoming uncertainties in geotechnical risk analysis: the discrete, simulation and fuzzy logic approaches
Y EL-SHAYEB, T VERDEL
ERES 99: earthquake resistant engineering structures II (Catania, 1999), 747-756, 2001
42001
Overcoming uncertainties in risk analysis: trade-offs among methods of uncertainty analysis
Y Elshayeb
Comparative Risk Assessment and Environmental Decision Making, 287-295, 2005
32005
Computer simulation and risk analysis around abandoned underground excavations application to a French case
Y El-Shayeb, T Verdel, C Didier
International Conference on Safety and Reliability (ESREL 1997), 1171-1179, 1997
31997
New Technique-“One Three-One Two (13-12)”-In Ultimate Pit Limit Heuristic Algorithms
M El-Karmouty, M El-Wageeh, AA El-Aziz, Y El-Shayeb
The 45th International October Conference on Mining and Metallurgy Bor Lake …, 2013
22013
A Proposed Framework for Multinational Comparative Risk Analysis: Pesticide Use, Impacts and Management: Report of the Comparative Risk Assessment Methods Workgroup
JA Shatkin, I Andreas, DS Apul, A Attia, M Brambilla, F Carini, Y Elshayeb, ...
Comparative Risk Assessment and Environmental Decision Making, 149-168, 2005
22005
Geotechnical risk analysis in historical sites: Application at the valley of the kings, Egypt
Y EL-SHAYEB, T VERDEL
Engineering Geology: A global view from the Pacific Rim, 865-870, 1998
21998
Back analysis for predicting type and size of subsidence hazard over abandoned Lorraine iron mines
Y El Shayeb, M Al Heib, JP Josien
32. International geological Congress, 2004
12004
Or, quand on travaille pour demain, et pour l’incertain, on agit avec raison: Car on doit travailler pour l’incertain par la règle des partis qui est démontrée.
T my lovely Mahinaz, ELS Yasser
1999
Overcoming Uncertainties In Geotechnical Risk Analysis: The Discrete, Simulation And Fuzzy Logic Approaches
ELS Yasser, T VERDEL
WIT Transactions on The Built Environment 41, 1970
1970
OVERCOMING UNCERTAINTIES IN RISK ANALYSIS: TRADE OFF BETWEEN CLASSICAL METHODS OF UNCERTAINTY ANALYSIS
Y ELSHAYEB
The system can't perform the operation now. Try again later.
Articles 1–17