Follow
Ganiyu Olabode Ajisegiri (PhD)
Ganiyu Olabode Ajisegiri (PhD)
Lecturer in Industrial and Production Engineering, University of Ibadan
Verified email at mail1.ui.edu.ng
Title
Cited by
Cited by
Year
Anthropometric variability study of two Nigerian ethnic groups
A Kolawole, OE Charles-Owaba, GO Ajisegiri
Ergonomics SA: Journal of the Ergonomics Society of South Africa 21 (1), 39-50, 2009
72009
Single machine multi-criteria scheduling problem: total completion time, maximum lateness, and maximum earliness performance measures
S Akande, GO Ajisegiri
International Journal of Planning and Scheduling 3 (2), 140-159, 2021
42021
Genetic algorithm: a veritable tool for solving agricultural extension agents travelling problem
IO Adewumi, FI Oluwatoyinbo, AO Omoyajowo, GO Ajisegiri, AE Akinsete
Agrotechnol 4 (138), 2, 2015
42015
Three classes of Earliness-Tardiness (E/T) scheduling problems
S Akande, G Ajisegiri
Fuel Communications 10, 100047, 2022
32022
Application of an Agent Based Model to Study the Resource Exchanges within Eco-industrial Parks
GO Ajisegiri
University of Leeds, 2019
22019
Effect of Price Dynamics in the Design of Eco-Industrial Parks: An Agent-based Modelling Approach
GO Ajisegiri, FL Muller
In Proceedings of 8th International Conference on Simulation and Modeling …, 2018
22018
Dispatching Rules for Minimizing Deviation from JIT Schedule Using the Earliness-Tardiness Scheduling Problem with Due Windows Approach.
S Akande, GO Ajisegiri, AA Adegoke, OM Ikumapayi, ET Akinlabi
Journal Européen des Systèmes Automatisés 55 (3), 2022
12022
Multiple Input Multiple Output (MIMO) Model of an Industrial Ecosystem: An Agent-Based Modeling Approach
GO Ajisegiri, FL Muller
Engineering, Technology & Applied Science Research 10 (4), 6092-6101, 2020
12020
Identifying Industrial Symbiosis Options for Energy Reuse
GO AJISEGIRI, S AKANDE
2020
Artificial neural networks model: reliable forecasting tool in cocoa postharvest losses reduction.
IO Adewumi, K Orisaremi, GO Ajisegiri, OO Oladipo, BS Kosemani, ...
2016
Comparative Analysis of Deterministic and Stochastic Scheduling Model: A Review Article
S Akande, GO Ajisegiri
Performance Measure of Multipurpose Machine From Single Machine Units
SA Akande, GO Ajisegiri
The system can't perform the operation now. Try again later.
Articles 1–12