Anthropometric variability study of two Nigerian ethnic groups A Kolawole, OE Charles-Owaba, GO Ajisegiri Ergonomics SA: Journal of the Ergonomics Society of South Africa 21 (1), 39-50, 2009 | 7 | 2009 |
Single machine multi-criteria scheduling problem: total completion time, maximum lateness, and maximum earliness performance measures S Akande, GO Ajisegiri International Journal of Planning and Scheduling 3 (2), 140-159, 2021 | 4 | 2021 |
Genetic algorithm: a veritable tool for solving agricultural extension agents travelling problem IO Adewumi, FI Oluwatoyinbo, AO Omoyajowo, GO Ajisegiri, AE Akinsete Agrotechnol 4 (138), 2, 2015 | 4 | 2015 |
Three classes of Earliness-Tardiness (E/T) scheduling problems S Akande, G Ajisegiri Fuel Communications 10, 100047, 2022 | 3 | 2022 |
Application of an Agent Based Model to Study the Resource Exchanges within Eco-industrial Parks GO Ajisegiri University of Leeds, 2019 | 2 | 2019 |
Effect of Price Dynamics in the Design of Eco-Industrial Parks: An Agent-based Modelling Approach GO Ajisegiri, FL Muller In Proceedings of 8th International Conference on Simulation and Modeling …, 2018 | 2 | 2018 |
Dispatching Rules for Minimizing Deviation from JIT Schedule Using the Earliness-Tardiness Scheduling Problem with Due Windows Approach. S Akande, GO Ajisegiri, AA Adegoke, OM Ikumapayi, ET Akinlabi Journal Européen des Systèmes Automatisés 55 (3), 2022 | 1 | 2022 |
Multiple Input Multiple Output (MIMO) Model of an Industrial Ecosystem: An Agent-Based Modeling Approach GO Ajisegiri, FL Muller Engineering, Technology & Applied Science Research 10 (4), 6092-6101, 2020 | 1 | 2020 |
Identifying Industrial Symbiosis Options for Energy Reuse GO AJISEGIRI, S AKANDE | | 2020 |
Artificial neural networks model: reliable forecasting tool in cocoa postharvest losses reduction. IO Adewumi, K Orisaremi, GO Ajisegiri, OO Oladipo, BS Kosemani, ... | | 2016 |
Comparative Analysis of Deterministic and Stochastic Scheduling Model: A Review Article S Akande, GO Ajisegiri | | |
Performance Measure of Multipurpose Machine From Single Machine Units SA Akande, GO Ajisegiri | | |