Adverse effects of coal mine waste dumps on the environment and their management N Adibee, M Osanloo, M Rahmanpour Environmental earth sciences 70, 1581-1592, 2013 | 100 | 2013 |
Integration of sustainable development concepts in open pit mine design N Adibi, M Ataee-pour, M Rahmanpour Journal of Cleaner Production 108, 1037-1049, 2015 | 79 | 2015 |
An approach to determine the location of an in pit crusher in open pit mines M Rahmanpour, M Osanloo, N Adibee 23rd proceeding of International Mining Congress and Expo of Turkey, 2013 | 60* | 2013 |
A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining M Paricheh, M Osanloo, M Rahmanpour International Journal of Mining, Reclamation and Environment 32 (1), 35-55, 2018 | 34 | 2018 |
A decision support system for determination of a sustainable pit limit M Rahmanpour, M Osanloo Journal of cleaner production 141, 1249-1258, 2017 | 34 | 2017 |
In-pit crusher location as a dynamic location problem M Paricheh, M Osanloo, M Rahmanpour Journal of the Southern African Institute of Mining and Metallurgy 117 (6 …, 2017 | 30 | 2017 |
Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty M Rahmanpour, M Osanloo Journal of the Southern African Institute of Mining and Metallurgy 116 (3 …, 2016 | 27 | 2016 |
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty M Rahmanpour, M Osanloo IJE TRANSACTIONS A: Basics 29 (7), 1022-1028, 2016 | 22 | 2016 |
Mine Design Selection Considering Sustainable Development M Osanloo, M Rahmanpour Mine Planning and Equipment Selection, 151-163, 2013 | 16* | 2013 |
Optimizing short-term production plan using a portfolio optimization model M Osanloo, M Rahmanpour REM-International Engineering Journal 70, 109-116, 2017 | 13 | 2017 |
Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying M Shamsi, Y Pourrahimian, M Rahmanpour International Journal of Mining, Reclamation and Environment 36 (2), 142-158, 2022 | 12 | 2022 |
Determining the Most Effective Factors on Open Pit Mine Plans and Their Interactions M Rahmanpour, M Osanloo Mine Planning and Equipment Selection, 197-207, 2014 | 11* | 2014 |
Production Scheduling in Sublevel Caving Method with the Objective of NPV Maximization M Shenavar, M Ataee-Pour, M Rahmanpour Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | 7 | 2019 |
A New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method M Shenavar, M Ataee-pour, M Rahmanpour Journal of Mining and Environment 11 (3), 765-778, 2020 | 6 | 2020 |
Application of fuzzy linear programming for short-term planning and quality control in mine complexes M Rahmanpour, M Osanloo Journal of the Southern African Institute of Mining and Metallurgy 117 (7 …, 2017 | 6 | 2017 |
Sustainable Open Pit Mine Design: Ultimate Pit Limit and Cut-off Grade Determination M Osanloo, M Rahmanpour LAP LAMBERT Academic Publishing, 2017 | 5 | 2017 |
An Approach to Locate an in Pit Crusher in Open Pit Mines R Mehdi, O Morteza, A N, AS M International Journal of Engineering-Transactions C: Aspects 27 (9), 1475-1484, 2014 | 5* | 2014 |
Pit limit determination considering blending requirements M Rahmanpour, M Osanloo Mine Planning and Equipment Selection – MPES 2012, 2012 | 5 | 2012 |
Risk analysis of mine closure considering sustainable planning M Rahmanpour, M Osanloo 13th Int. Symposium On Environmental Issues and Waste Management in Energy …, 2012 | 4 | 2012 |
Determining a resilient stope boundary for underground mass mining projects M Shami-Qalandari, M Rahmanpour, SM Mirabedi Rudarsko-geološko-naftni zbornik 37 (5), 103-116, 2022 | 2 | 2022 |