Follow
mehdi rahmanpour
mehdi rahmanpour
School of Mining, College of Engineering, University of Tehran
Verified email at ut.ac.ir
Title
Cited by
Cited by
Year
Adverse effects of coal mine waste dumps on the environment and their management
N Adibee, M Osanloo, M Rahmanpour
Environmental earth sciences 70, 1581-1592, 2013
1002013
Integration of sustainable development concepts in open pit mine design
N Adibi, M Ataee-pour, M Rahmanpour
Journal of Cleaner Production 108, 1037-1049, 2015
792015
An approach to determine the location of an in pit crusher in open pit mines
M Rahmanpour, M Osanloo, N Adibee
23rd proceeding of International Mining Congress and Expo of Turkey, 2013
60*2013
A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining
M Paricheh, M Osanloo, M Rahmanpour
International Journal of Mining, Reclamation and Environment 32 (1), 35-55, 2018
342018
A decision support system for determination of a sustainable pit limit
M Rahmanpour, M Osanloo
Journal of cleaner production 141, 1249-1258, 2017
342017
In-pit crusher location as a dynamic location problem
M Paricheh, M Osanloo, M Rahmanpour
Journal of the Southern African Institute of Mining and Metallurgy 117 (6 …, 2017
302017
Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty
M Rahmanpour, M Osanloo
Journal of the Southern African Institute of Mining and Metallurgy 116 (3 …, 2016
272016
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
M Rahmanpour, M Osanloo
IJE TRANSACTIONS A: Basics 29 (7), 1022-1028, 2016
222016
Mine Design Selection Considering Sustainable Development
M Osanloo, M Rahmanpour
Mine Planning and Equipment Selection, 151-163, 2013
16*2013
Optimizing short-term production plan using a portfolio optimization model
M Osanloo, M Rahmanpour
REM-International Engineering Journal 70, 109-116, 2017
132017
Optimisation of open-pit mine production scheduling considering optimum transportation system between truck haulage and semi-mobile in-pit crushing and conveying
M Shamsi, Y Pourrahimian, M Rahmanpour
International Journal of Mining, Reclamation and Environment 36 (2), 142-158, 2022
122022
Determining the Most Effective Factors on Open Pit Mine Plans and Their Interactions
M Rahmanpour, M Osanloo
Mine Planning and Equipment Selection, 197-207, 2014
11*2014
Production Scheduling in Sublevel Caving Method with the Objective of NPV Maximization
M Shenavar, M Ataee-Pour, M Rahmanpour
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
72019
A New Mathematical Model for Production Scheduling in Sub-level Caving Mining Method
M Shenavar, M Ataee-pour, M Rahmanpour
Journal of Mining and Environment 11 (3), 765-778, 2020
62020
Application of fuzzy linear programming for short-term planning and quality control in mine complexes
M Rahmanpour, M Osanloo
Journal of the Southern African Institute of Mining and Metallurgy 117 (7 …, 2017
62017
Sustainable Open Pit Mine Design: Ultimate Pit Limit and Cut-off Grade Determination
M Osanloo, M Rahmanpour
LAP LAMBERT Academic Publishing, 2017
52017
An Approach to Locate an in Pit Crusher in Open Pit Mines
R Mehdi, O Morteza, A N, AS M
International Journal of Engineering-Transactions C: Aspects 27 (9), 1475-1484, 2014
5*2014
Pit limit determination considering blending requirements
M Rahmanpour, M Osanloo
Mine Planning and Equipment Selection – MPES 2012, 2012
52012
Risk analysis of mine closure considering sustainable planning
M Rahmanpour, M Osanloo
13th Int. Symposium On Environmental Issues and Waste Management in Energy …, 2012
42012
Determining a resilient stope boundary for underground mass mining projects
M Shami-Qalandari, M Rahmanpour, SM Mirabedi
Rudarsko-geološko-naftni zbornik 37 (5), 103-116, 2022
22022
The system can't perform the operation now. Try again later.
Articles 1–20