Follow
Gautam Choudhury
Gautam Choudhury
Associate Professor, Institute of Advanced Study in Science and Technology
No verified email
Title
Cited by
Cited by
Year
Optimal design and control of queues
L Tadj, G Choudhury
Top 13, 359-412, 2005
2002005
An MX/G/1 queueing system with a setup period and a vacation period
G Choudhury
Queueing systems 36 (1), 23-38, 2000
1492000
A batch arrival queue with a vacation time under single vacation policy
G Choudhury
Computers & Operations Research 29 (14), 1941-1955, 2002
1482002
A two-stage batch arrival queueing system with a modified Bernoulli schedule vacation under N-policy
G Choudhury, KC Madan
Mathematical and Computer Modelling 42 (1-2), 71-85, 2005
1342005
A batch arrival retrial queue with general retrial times under Bernoulli vacation schedule for unreliable server and delaying repair
G Choudhury, JC Ke
Applied Mathematical Modelling 36 (1), 255-269, 2012
1232012
An M/G/1 retrial queueing system with two phases of service subject to the server breakdown and repair
G Choudhury, K Deka
Performance Evaluation 65 (10), 714-724, 2008
1202008
An M/G/1 queue with two phases of service subject to the server breakdown and delayed repair
G Choudhury, L Tadj
Applied Mathematical Modelling 33 (6), 2699-2709, 2009
1192009
Steady state analysis of an M/G/1 queue with repeated attempts and two-phase service
JR Artalejo, G Choudhury
Quality Technology & Quantitative Management 1 (2), 189-199, 2004
1002004
An investigation on effect of bias on determination of sample size on the basis of data related to the students of schools of Guwahati
HK Sarmah, BB Hazarika, G Choudhury
International Journal of Applied Mathematics and Statistical Sciences 2 (1 …, 2013
892013
A single server queueing system with two phases of service subject to server breakdown and Bernoulli vacation
G Choudhury, M Deka
Applied mathematical modelling 36 (12), 6050-6060, 2012
752012
A two phase batch arrival queueing system with a vacation time under Bernoulli schedule
G Choudhury, KC Madan
Applied Mathematics and Computation 149 (2), 337-349, 2004
742004
A two phase queueing system with Bernoulli feedback
G Choudhury, M Paul
International journal of information and management sciences 16 (1), 35, 2005
732005
Steady state analysis of an Mx/G/1 queue with two phase service and Bernoulli vacation schedule under multiple vacation policy
G Choudhury, L Tadj, M Paul
Applied Mathematical Modelling 31 (6), 1079-1091, 2007
682007
Some aspects of anM/G/1 queueing system with optional second service
G Choudhury
Top 11 (1), 141-150, 2003
682003
A batch arrival retrial queueing system with two phases of service and service interruption
G Choudhury, L Tadj, K Deka
Computers & mathematics with applications 59 (1), 437-450, 2010
622010
A Batch Arrival Queue with a Second Optional Service Channel Under N-Policy
G Choudhury, M Paul
Stochastic Analysis and Applications 24 (1), 1-21, 2006
612006
An unreliable retrial queue with delaying repair and general retrial times under Bernoulli vacation schedule
G Choudhury, JC Ke
Applied Mathematics and Computation 230, 436-450, 2014
602014
Analysis of the Queueing System with Vacation Times
G Choudhury
Sankhyā: The Indian Journal of Statistics, Series B, 37-49, 2002
592002
A two phase batch arrival retrial queueing system with Bernoulli vacation schedule
G Choudhury
Applied Mathematics and Computation 188 (2), 1455-1466, 2007
572007
Steady state analysis of an M/G/1 queue with linear retrial policy and two phase service under Bernoulli vacation schedule
G Choudhury
Applied Mathematical Modelling 32 (12), 2480-2489, 2008
562008
The system can't perform the operation now. Try again later.
Articles 1–20