关注
Yue Wang
Yue Wang
College of Information and Electrical Engineering, China Agricultural University
在 cau.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
A cross-entropy-based three-stage sequential importance sampling for composite power system short-term reliability evaluation
Y Wang, C Guo, QH Wu
IEEE Transactions on Power Systems 28 (4), 4254-4263, 2013
702013
Adaptive sequential importance sampling technique for short‐term composite power system adequacy evaluation
Y Wang, C Guo, Q Wu, S Dong
IET Generation, Transmission & Distribution 8 (4), 730-741, 2014
352014
An adaptive importance sampling method for spinning reserve risk evaluation of generating systems incorporating virtual power plants
Y Wang
IEEE Transactions on Power Systems 33 (5), 5082-5091, 2018
342018
Risk Assessment of Stochastic Spinning Reserve of a Wind-Integrated Multi-State Generating System Based on a Cross-Entropy Method
Y Wang
IET Generation, Transmission & Distribution, 2016
232016
山火条件下的架空输电线路停运概率模型
宋嘉婧, 郭创新, 张金江, 王越, 盛鹍
电网技术 37 (1), 100-105, 2013
232013
面向调度运行的电网安全风险管理控制系统 (二) 风险指标体系, 评估方法与应用策略
崔建磊, 文云峰, 郭创新, 王越, 盛鹍, 黄良刚
电力系统自动化 37 (10), 92-97, 2013
182013
Reliability assessment of a multi‐state distribution system with microgrids based on an accelerated Monte‐Carlo method
T Yan, W Tang, Y Wang, X Zhang
IET Generation, Transmission & Distribution 12 (13), 3221-3229, 2018
172018
序贯蒙特卡洛方法在电力系统可靠性评估中的应用差异分析
暴英凯, 王越, 唐俊熙, 郭创新, 王惺, 施会
电网技术 38 (5), 1189-1195, 2014
172014
考虑信息系统作用的电力系统可靠性研究
俞斌, 郭创新, 王越, 张理
电力系统保护与控制 41 (7), 7-13, 2013
172013
表征内部潜伏性故障的变压器时变停运模型研究
郭创新, 王越, 王媚, 尹玉娟, 文云峰, 张金江
中国电机工程学报 33 (1), 63-69, 2013
142013
基于区间线性规划的区域综合能源系统日前优化调度
白牧可, 王越, 唐巍, 吴聪, 张博
电网技术 41 (12), 3963-3970, 2017
132017
Probabilistic spinning reserve adequacy evaluation for generating systems using an Markov chain Monte Carlo-integrated cross-entropy method
Y Wang
IET Generation, Transmission & Distribution, 2015
132015
Risk-oriented preventive control of transmission lines overload
YF Wen, Y Wang, CX Guo, QH Wu, BJ Wen, LG Huang
2012 IEEE Power and Energy Society General Meeting, 1-7, 2012
122012
Evaluating weather influences on transmission line failure rate based on scarce fault records via a bi‐layer clustering technique
Y Wang, L Chen, M Yao, X Li
IET Generation, Transmission & Distribution 13 (23), 5305-5312, 2019
112019
Analytical complex distribution system reliability evaluation considering stochastic interruption durations and network reconfigurations
Y Wang
Electric Power Components and Systems 45 (19), 2151-2163, 2017
92017
多阶段协调的风险调度模型及算法研究
文云峰, 江宇飞, 沈策, 廖俊宏, 郭创新, 王越, 吴青华
中国电机工程学报 34 (1), 153-160, 2014
92014
Islanding Strategy for Restoring Electric Power Supply by Means of Electric Vehicle Idle Power against Cold Load Pickup
Y Wang, M Yao, L Chen, X Li
IET Generation, Transmission & Distribution, 2018
82018
An enhanced Markov chain Monte Carlo-integrated cross-entropy method with a partially collapsed Gibbs sampler for probabilistic spinning reserve adequacy evaluation of …
Y Wang
Electric Power Components and Systems 45 (15), 1617-1628, 2017
72017
Monte Carlo based operating reserve adequacy evaluation of a stand-alone microgrid considering high penetrations of correlated wind energy
Y Wang, L Wang, L Xu, J Sun
2016 3rd International Conference on Information Science and Control …, 2016
72016
Collaborative configuration for distributed energy storages and cyber systems in low‐voltage distribution networks with high penetration of PV systems
Y Cai, W Tang, B Zhang, Y Wang
IET Cyber‐Physical Systems: Theory & Applications 4 (1), 3-12, 2019
62019
系统目前无法执行此操作,请稍后再试。
文章 1–20