Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia AH Memon, IA Rahman, AAA Azis International Journal of advances in applied sciences 1 (1), 45-52, 2012 | 238 | 2012 |
Factors contributing to physical and non-physical waste generation in construction industry S Nagapan, IA Rahman, A Asmi International Journal of Advances in Applied Sciences 1 (1), 1-10, 2012 | 189 | 2012 |
Identifying Causes of Construction Waste –Case of Central Region of Peninsula Malaysia S Nagapan, IA Rahman, A Asmi, AH Memon, RM Zin International Journal of Integrated Engineering 4 (2), 2012 | 154 | 2012 |
Issues on construction waste: The need for sustainable waste management S Nagapan, IA Rahman, A Asmi, AH Memon, I Latif 2012 IEEE colloquium on Humanities, Science and Engineering (CHUSER), 325-330, 2012 | 137 | 2012 |
Construction waste management: Malaysian perspective S Nagapan, IA Rahman, A Asmi International Conference on Civil and Environmental Engineering …, 2012 | 99 | 2012 |
A review of construction waste cause factors S Nagapan, IA Rahman, A Asmi Asian Conference on Real Estate: Sustainable Growth Managing Challenges …, 2011 | 90 | 2011 |
Study of site's construction waste in Batu Pahat, Johor S Nagapan, IA Rahman, A Asmi, NF Adnan Procedia Engineering 53, 99-103, 2013 | 87 | 2013 |
Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia IA Rahman, AH Memon, S Nagapan, QBAI Latif, AAA Azis 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 52-57, 2012 | 77 | 2012 |
Challenges faced by construction industry in accomplishing sustainablity goals AAA Azis, AH Memon, IA Rahman, S Nagapan, QBAI Latif 2012 IEEE Symposium on Business, Engineering and Industrial Applications …, 2012 | 65 | 2012 |
Classification and quantification of construction waste at housing project site LC Foo, IA Rahman, A Asmi, S Nagapan, KI Khalid International Journal of Zero Waste Generation 1 (1), 1-4, 2013 | 62 | 2013 |
The on-site waste minimization practices for construction waste MF Hasmori, AFM Zin, S Nagapan, R Deraman, N Abas, R Yunus, ... IOP conference series: materials science and engineering 713 (1), 012038, 2020 | 60 | 2020 |
Causative factors of cost overrun in highway projects of Sindh province of Pakistan S Sohu, A Halid, S Nagapan, A Fattah, I Latif, K Ullah IOP Conference Series: Materials Science and Engineering 271 (1), 012036, 2017 | 50 | 2017 |
Theoretical framework of the causes of construction time and cost overruns K Ullah, AH Abdullah, S Nagapan, S Suhoo, MS Khan IOP Conference Series: Materials Science and Engineering 271 (1), 012032, 2017 | 46 | 2017 |
Ranking of delay factors for Makkah’s construction industry N Al-Emad, IA Rahman, S Nagapan, Y Gamil MATEC Web of Conferences 103, 03001, 2017 | 41 | 2017 |
A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry MAM Amin, NH Abas, S Shahidan, MH Rahmat, NA Suhaini, S Nagapan, ... IOP conference series: materials science and engineering 271 (1), 012031, 2017 | 36 | 2017 |
Determining root cause of construction waste generation: A global context S Kaliannan, S Nagapan, S Sohu, AA Jhatial Civil Engineering Journal 4 (11), 2539-2547, 2018 | 33 | 2018 |
Mechanical Properties of Layered Laminated Woven Bamboo Gigantochloa Scortechinii/Epoxy Composites K Rassiah, MMH Megat Ahmad, A Ali, AH Abdullah, S Nagapan Journal of Polymers and the Environment 26, 1328-1342, 2018 | 33 | 2018 |
Initial PLS model of construction waste factors IA Rahman, S Nagapan, A Asmi Procedia-social and behavioral sciences 129, 469-474, 2014 | 33 | 2014 |
Significant factors of construction delays among contractors in Klang Valley and its mitigation MF Hasmori, I Said, R Deraman, NH Abas, S Nagapan, MH Ismail, ... International Journal of Integrated Engineering 10 (2), 2018 | 30 | 2018 |
Projects delay factors of Saudi Arabia construction industry using PLS-SEM path modelling approach IA Rahman, N Al-Emad, S Nagapan MATEC Web of Conferences 81, 07001, 2016 | 29 | 2016 |