Follow
Dr. Abbas M. Burhan
Dr. Abbas M. Burhan
University of Baghdad/ College of Engineering/ Department of Civil Engineering
Verified email at coeng.uobaghdad.edu.iq
Title
Cited by
Cited by
Year
Developing a system for assessing the sustainability in school building projects
HK Alhilli, AM Burhan
Environment, Development and Sustainability 23 (12), 17483-17502, 2021
122021
Fault tree analysis as a modern technique for investigating causes of some construction project problems
AM Burhan
Journal of Engineering 16 (02), 5214-5224, 2010
122010
Investigating the causes of poor cost control in Iraqi construction projects
NN Abbas, AM Burhan
Engineering, Technology & Applied Science Research 12 (1), 8075-8079, 2022
102022
Developing Crisis Management System for Construction Projects in Iraq.
GA Fadhil, AM Burhan
Journal of Engineering (17264073) 28 (1), 2022
102022
Investigating the effects of economic crisis on construction projects in Iraq
GA Fadhil, AM Burhan
E3S Web of Conferences 318, 02005, 2021
102021
Time-Cost-Quality Trade-off Model for Optimal Pile Type Selection Using Discrete Particle Swarm Optimization Algorithm
AMB Hanaa H. Lateef
civil engineering journal 5 (11), 2461-2471, 2019
92019
Developing an integrative data intelligence model for construction cost estimation
ZH Ali, AM Burhan, M Kassim, Z Al-Khafaji
Complexity 2022, 2022
82022
Developing a Model to Estimate the Productivity of Ready Mixed Concrete Batch Plant
AMB Hussein T. Almusawi
Journal of Engineering 26 (10), 2020
82020
Hybrid machine learning approach for construction cost estimation: An evaluation of extreme gradient boosting model
ZH Ali, AM Burhan
Asian Journal of Civil Engineering 24 (7), 2427-2442, 2023
72023
Risk Assessment in BOT Contracts using AHP Technique
SFR AL-Aga, AM Burhan
Journal of Engineering 29 (1), 61-75, 2023
72023
Using Neural Network Model to Estimate the Optimum Time for Repetitive Construction Projects in Iraq
MRA Abbas M. Burhan
Association of Arab Universities Journal of Engineering Sciences (PISSN …, 2020
6*2020
Cost Estimation Process for Construction Residential Projects by Using Multifactor Linear Regression Technique
HSHA Abbas Mohammed Burhan Alshemosi
International Journal of Science and Research (IJSR) 6 (6), 2017
6*2017
Evaluation of the current status of the cost control processes in Iraqi construction projects
NN Abbas, AM Burhan
Journal of Engineering 29 (1), 128-144, 2023
52023
Determining the causes of punching shear in reinforced slabs using fishbone diagram
AM Burhan, MR Altaie, OK Al-Kubaisi
Civil Engineering Journal 4 (11), 2642-2651, 2018
52018
Non-Profit Organization Project Selection Process Using the Hygiene Method of Multi-Criteria Decision Making
AR Radhi, AM Burhan
Engineering, Technology & Applied Science Research 12 (5), 9097-9101, 2022
42022
Calculating the Transport Density Index from Some of the Productivity Indicators for Railway Lines by Using Neural Networks
SR Mohamed, AMM Burhan, AMA Hadi
Journal of Engineering 22 (9), 1-19, 2016
42016
Identification of the main causes of risks in engineering procurement construction projects
NH Khairullah, MA Hilal, A Mohammed
Journal of the Mechanical Behavior of Materials 31 (1), 282-289, 2022
32022
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms
KR Erzaij, AM Burhan, WA Hatem, RH Ali
Civil and Environmental Engineering 17 (2), 673-680, 2021
32021
Developing a mathematical model for planning repetitive construction projects by using support vector machine technique
AM Burhan, KR Erzaij, WA Hatem
Civil and Environmental Engineering 17 (2), 371-379, 2021
32021
Analyzing the Obstacles of Investment Process in Iraq Using (5 Whys) and Focus Group Discussion (FQD) Techniques
AM Jaber, AM Burhan
IOP Conference Series: Materials Science and Engineering 901 (1), 012030, 2020
32020
The system can't perform the operation now. Try again later.
Articles 1–20