Follow
Jennifer Scheib
Title
Cited by
Cited by
Year
A comparative study of DC and AC microgrids in commercial buildings across different climates and operating profiles
D Fregosi, S Ravula, D Brhlik, J Saussele, S Frank, E Bonnema, J Scheib, ...
2015 IEEE First International Conference on DC Microgrids (ICDCM), 159-164, 2015
1742015
Progress on enabling an interactive conversation between commercial building occupants and their building to improve comfort and energy efficiency
M Schott, J Scheib, N Long, K Fleming, K Benne, L Brackney
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2012
192012
Challenges to integrated daylighting and electric lighting simulation methods in a whole-building energy simulation context
R Guglielmetti, J Scheib
Proceedings of SimBuild 5 (1), 585-594, 2012
122012
Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets
J Scheib, S Pless, P Torcellini
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2014
112014
NASA Net Zero Energy Buildings Roadmap
S Pless, J Scheib, P Torcellini, B Hendron, M Slovensky
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2014
82014
Energy use intensity and its Influence on the integrated daylighting design of a large net zero energy building
R Guglielmetti, J Scheib, SD Pless, P Torcellini, R Petro
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2011
82011
Thinking like a whole building: a Whole Foods Market new construction case study
M Deru, E Bonnema, I Doebber, A Hirsch, M McIntyre, J Scheib
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2011
62011
Integration of Renewable Energy Systems
A Walker, J Scheib, CS Turchi, R Robicaud, G Tomberlin, K Burman, ...
ASME Press, 2016
52016
How-to Guide for Energy-performance-based Procurement: An Integrated Approach for Whole Building High Performance Specifications in Commercial Buildings
S Pless, P Torcellini, J Scheib, B Hendron, M Leach
US Department of Energy, Energy Efficiency & Renewable Energy, Building …, 2012
42012
Energy use intensity and its influence on the integrated daylighting design of a large net zero energy office building
RG IESNA, JS IESNA, I Rachel Petro
ASHRAE Transactions 117, 610, 2011
42011
Supervisory Control of Loads and Energy Storage in Next-Generation Zero Energy Buildings
F Kung, S Frank, J Scheib, W Bernal Heredia, S Pless
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2016
32016
Innovation Incubator: Whisker Labs Technical Evaluation
BF Sparn, SM Frank, L Earle, JG Scheib
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2017
22017
Results and Lessons Learned From the DOE Commercial Building Partnerships
A Hirsch, M Deru, R Langner, G Stark, I Doebber, J Scheib, M Sheppy, ...
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2014
22014
Using models to provide predicted ranges for building-human interfaces
N Long, J Scheib, S Pless, M Schott
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2013
22013
Realizing High-Performance Buildings
P Coleman, S Pless, J Scheib
Lawrence Berkeley National Lab.(LBNL), Berkeley, CA (United States), 2018
12018
Countdown to Zero
R Petro, J Scheib
LD+ A (Lighting Design and Application) 41 (NREL/JA-5500-49334), 2011
12011
Large-Scale Daylighting Analysis for Buildings, Products, and Policy
RP Guglielmetti, BL Ball, J Scheib, MS Roudsari
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2018
2018
Codes Don't Always Get Enforced, But Contracts Do: Changing the Procurement Paradigm to Drive Building Energy Performance
PA Torcellini, JG Scheib, S Pless, A McMillen
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2016
2016
Integration of Renewable Energy Systems
M Qu, B Kroposki, M Hillesheim, K Burman, R Robichaud, G Tomberlin, ...
American Society of Mechanical Engineers (ASME, 2016
2016
Realizing High-Performance Buildings
J Scheib
National Renewable Energy Lab.(NREL), Golden, CO (United States), 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–20