Follow
Ng Lieu Thai
Ng Lieu Thai
Verified email at swinburne.edu.my
Title
Cited by
Cited by
Year
Preliminary evaluation of synergizing BIM and Malaysian carbon reduction and environmental sustainability tool
CC Ohueri, WI Enegbuma, KK Kuok, NM Wong, LT Ng, R Kenley
International Conference on Sustainability in Energy and Buildings, 218-227, 2018
152018
Real-time monitoring and assessment of groundwater responses due to dewatering of an abandoned 7m deep excavation pit in Kuching City
LT Ng, DEL Ong, WSH Wong, DA Gannilegedera, BF Jong, HS Chua
Computer Methods and Recent Advances in Geomechanics: Proceedings of the …, 2015
52015
Feasible Design Tensile Capacity of Post-installed Anchors Based on the New Eurocode 2: Part 4 (2018)
LT Ng, ESW Wong, DTW Looi
Proceedings of the 5th International Conference on Sustainable Civil …, 2022
12022
A simplified design solution for shear capacity of post-installed anchors encompassing all failure modes in EC2-4 (2018)
LT Ng, DTW Looi, J Lee, ALY Ng
Journal of Physics: Conference Series 2521 (1), 012014, 2023
2023
A proposed strut efficiency factor for strut-and-tie design of steel fibre-reinforced concrete
LT Ng, ACS Tang, DTW Looi
Materials Today: Proceedings, 2022
2022
Building responses due to dewatering of an abandoned 7 m deep excavation pit
LT Ng, DEL Ong, WSH Wong
Proceedings of the 19th Southeast Asian Geotechnical Conference & 2nd AGSSEA …, 2016
2016
Safe dewatering and re-construction of an abandoned 7m deep basement in the vicinity of existing buildings in Kuching city centre
LT Ng
Swinburne University of Technology, 2015
2015
The system can't perform the operation now. Try again later.
Articles 1–7