Follow
Najat Almasarwah
Najat Almasarwah
Assistant Professor of Industrial Systems Engineering, Mutah University
Verified email at mutah.edu.jo - Homepage
Title
Cited by
Cited by
Year
Cellular manufacturing design 1996–2021: A review and introduction to applications of Industry 4.0
R YounesSinaki, A Sadeghi, H Mosadegh, N Almasarwah, G Suer
International Journal of Production Research 61 (16), 5585-5636, 2023
162023
A two-phase algorithm to solve a 3-dimensional pallet loading problem
M Singh, N Almasarwah, G Süer
Procedia Manufacturing 39, 1474-1481, 2019
122019
Minimizing the number of tardy jobs on identical parallel machines subject to periodic maintenance
A Najat, C Yuan, S Gursel, Y Tao
Procedia Manufacturing 38, 1409-1416, 2019
122019
Flexible flowshop design in cellular manufacturing systems
N Almasarwah, G Süer
Procedia Manufacturing 39, 991-1001, 2019
102019
Application of Machine Learning Methods for Pallet Loading Problem
BL Aylak, M İnce, O Oral, G Süer, N Almasarwah, M Singh, B Salah
Applied Sciences 11 (18), 8304, 2021
92021
Consideration of processing time dissimilarity in batch-cyclic scheduling of flowshop cells
N Almasarwah, GA Süer
International Journal of Production Research 59 (21), 6544-6563, 2021
82021
Assembly System 4.0: Human-Robot Collaboration in Assembly Operations
GA Suer, N Almasarwah, J Pagan, Y You
IFIP International Conference on Advances in Production Management Systems …, 2021
72021
Collaborative robots’ assembly system in the manufacturing area, assembly system 4.0
N Almasarwah, E Abdelall, GA Suer, J Pagan, Y You
The International Journal of Advanced Manufacturing Technology 122 (2), 1069 …, 2022
62022
Product Scheduling in a Flowshop Cell
N Almasarwah, G Süer
Procedia Manufacturing 17, 206-213, 2018
62018
Multi-objective scheduling in labor-intensive manufacturing systems
G Süer, N Almasarwah, O Alhawari, C Davis
Journal of Manufacturing Systems 57, 469-483, 2020
22020
Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems
N Almasarwah, G Suer
Computers and Industrial Engineering Conference, 2017
22017
Multi-Stage Cellular Manufacturing System Design under Certain and Uncertain Conditions
NE Almasarwah
Ohio University, 2020
12020
Minimizing Average Flow Time subject to Minimum Number of Cells and No Tardy Jobs
G Suer, N Al-masarwah, O Alhawari, C Davis
ACMSA Conference, 2017
12017
Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems
NE Almasarwah
Ohio University, 2017
12017
Pallet loading optimization considering storage time and relative humidity
N Almasarwah, E Abdelall, G Suer, G Egilmez, M Singh, S Ramadan
Journal of Industrial Engineering and Management 16 (2), 453-471, 2023
2023
An Accurate and Robust Genetic Algorithm to Minimize the Total Tardiness in Parallel Machine Scheduling Problems
SZ Ramadan, N Almasarwah, ES Abdelall, GA Suer, NT Albashabsheh
Management and Production Engineering Review 14, 2023
2023
Multi-Stage Cellular Manufacturing System Design Under a Deterministic
N Almasarwah, G Suer
Procedia Manufacturing, 1-6, 2022
2022
Human-Cyber-Physical Disassembly Workstation 5.0 for Sustainable Manufacturing
N Almasarwah, E Abdelall, M Saraireh, S Ramadan
2022 International Conference on Emerging Trends in Computing and …, 2022
2022
Collaborative Robots’ Assembly System in the Manufacturing Area Considering the Safety Issue, Assembly System 4.0
N Almasarwah, G Suer, E Abdelall, J Pagan, Y You
2022
Detecting Community Structures Within Complex Networks Using a Discrete Unconscious Search Algorithm
E Ardjmand, WA Young II, NE Almasarwah
International Journal of Operations Research and Information Systems (IJORIS …, 2021
2021
The system can't perform the operation now. Try again later.
Articles 1–20