EVALUASI PROYEK MENGGUNAKAN METODE EARNED VALUE ANALYSIS STUDI KASUIS PADA PROYEK PEMBANGUNAN TAMBAH RUANG KELAS SMPN 17 TANGERANG SELATAN R Rosyati, J Sudarmanta Structure (Jurnal Sipil) 2 (2), 49-57, 2020 | 2 | 2020 |
Analisa optimalisasi waktu proyek dengan metode Crash Program pada proyek Rumah Sakit di kota Tangerang S Abadiyah, P Dimastoro Structure 1 (1), 1-6, 2019 | 2 | 2019 |
ANALISIS KONDISI PERMUKAAN JALAN DAN ESTIMASI BIAYA PEKERJAAN PADA RUAS JALAN PASAR KEMIS–RAJEG STA 0+ 000 s/d 4+ 900 DENGAN METODE BINA MARGA S Haq, S Purwanto, MS Afriansyah Structure (Jurnal Sipil) 2 (2), 65-71, 2020 | 1 | 2020 |
PERENCANAAN RESERVOIR PENGENDALI BANJIR KOMPLEK SEKNEG KOTA TANGERANG B Alfandi, MA Mu’min, WB Prasetya Structure (Jurnal Sipil) 2 (1), 31-38, 2020 | 1 | 2020 |
ANALISIS TINGKAT PELAYANAN JALAN TERHADAP KEMACETAN (STUDI KASUS AKSES JALAN MAULANA HASANUDIN–AMPERA, MENUJU JALAN BENTENG BETAWI, KOTA TANGERANG) B Alvandi, S Abadiyah, AR Surahma Structure (Jurnal Sipil) 2 (1), 8-14, 2020 | 1 | 2020 |
EVALUASI PENJADWALAN WAKTU DAN BIAYA PROYEK JALAN TOL KUNCIRAN-SERPONG PT. WASKITA KARYA (persero) Tbk. DENGAN METODE PERT DAN CPM S Abadiyah, MA Mu'min, TI Rinaldi Structure (Jurnal Sipil) 1 (2), 39-48, 2019 | 1 | 2019 |
PERBANDINGAN BEKISTING SISTEM SCAFFOLDING DENGAN BEKISTING SISTEM PERI UP UNTUK PEKERJAAN BALOK DAN PELAT DI TINJAU DARI SEGI BIAYA DAN WAKTU PELAKSANAAN PADA MPP PROJECT … S Purwanto, B Basirun, S Suyatno Structure (Jurnal Sipil) 1 (2), 31-38, 2019 | 1 | 2019 |
PERENCANAAN HIGH RISE BUILDING ATAU BANGUNAN BERTINGKAT DENGAN PERMODELAN KOLOM DAN BALOK TRANSFER B Alfandi, RA Safitri, D Purwanto Structure (Jurnal Sipil) 1 (2), 1-9, 2019 | 1 | 2019 |
ANALISA PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE) S Abadiyah, MA Mu’min, TD Julianto Structure (Jurnal Sipil) 2 (2), 72-79, 2020 | | 2020 |
PENGARUH PENAMBAHAN ADMIXTURE DAN ABU BATU TERHADAP ANALISA BETON PERCEPATAN 24 JAM PADA KOLOM AREA BASEMENT DENGAN MENGGUNAKAN SEMEN PCC A Almufid, RA Safitri, M Arisanta Structure (Jurnal Sipil) 2 (2), 58-64, 2020 | | 2020 |
PERENCANAAN STRUKTUR BAWAH DENGAN KOMBINASI PONDASI RAKIT DENGAN PILE CAP MENGGUNAKAN PONDASI TIANG BORED PILE PADA GEDUNG UMK 10 LANTAI WILAYAH KLATEN J Murdiaman, B Basirun, GA Pangestu Structure (Jurnal Sipil) 2 (2), 39-48, 2020 | | 2020 |
KAJIAN TERHADAP HUBUNGAN ANTARA PENGELOLAAN SISA MATERIAL DENGAN BIAYA DAN WAKTU PENYELESAIAN PROYEK KONSTRUKSI S Purwanto, R Rosyati, S Sudrajat Structure (Jurnal Sipil) 2 (1), 21-30, 2020 | | 2020 |
ANALISA OPTIMALISASI WAKTU PROYEK DENGAN CARA CRASH PROGRAM PADA PROYEK RS HERMINA KUTABUMI, KOTA TANGERANG S Haq, RA Safitri, P Prandiko Structure (Jurnal Sipil) 2 (1), 15-20, 2020 | | 2020 |
ANALISIS STABILITAS DINDING PENAHAN TANAH APARTMENT TOWER C TRANSPARK J Murdiaman, B Basirun, AR Salm Structure (Jurnal Sipil) 2 (1), 1-7, 2020 | | 2020 |
EFEKTIVITAS JARINGAN IRIGASI DI DESA GUNUNG SARI KABUPATEN TANGERANG S Abadiyah, M MURTADO Structure (Jurnal Sipil) 1 (2), 22-30, 2019 | | 2019 |
ANALISA PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PEKERJAAN PEMBANGUNAN PROYEK MASJID AL-ISTIGHFAR DI SINDANG PANON, KAB. TANGERANG S Purwanto, JM Guci, ES Tiana Structure (Jurnal Sipil) 1 (2), 10-21, 2019 | | 2019 |
ANALISA DAYA DUKUNG TIANG PONDASI DENGAN MENGGUNAKAN METODE DINAMIK RA Safitri, A Almufid, FI Rusdiyanto Structure 1 (1), 24-30, 2019 | | 2019 |