Follow
Shokrollah Zare
Shokrollah Zare
Verified email at shahroodut.ac.ir
Title
Cited by
Cited by
Year
Comparison of tunnel blast design models
S Zare, A Bruland
Tunnelling and underground space technology 21 (5), 533-541, 2006
652006
Applications of NTNU/SINTEF drillability indices in hard rock tunneling
S Zare, A Bruland
Rock mechanics and rock engineering 46, 179-187, 2013
622013
Face stability evaluation of a TBM-driven tunnel in heterogeneous soil using a probabilistic approach
A Eshraghi, S Zare
International Journal of Geomechanics 15 (6), 04014095, 2015
582015
Probabilistic prediction of expected ground condition and construction time and costs in road tunnels
A Mahmoodzadeh, S Zare
Journal of Rock Mechanics and Geotechnical Engineering 8 (5), 734-745, 2016
492016
Evaluating D&B and TBM tunnelling using NTNU prediction models
S Zare, A Bruland, J Rostami
Tunnelling and Underground Space Technology 59, 55-64, 2016
332016
Slope stability in swelling soils using cement grout: a case study
A Daraei, BMA Herki, AFH Sherwani, S Zare
International Journal of Geosynthetics and Ground Engineering 4, 1-10, 2018
312018
Effect of water content variations on critical and failure strains of rock
A Daraei, S Zare
KSCE Journal of Civil Engineering 22, 3331-3339, 2018
272018
Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel
M Karami, S Zare, J Rostami
Bulletin of Engineering Geology and the Environment 80, 201-219, 2021
252021
Stabilization of problematic soil by utilizing cementitious materials
A Daraei, AFH Sherwani, RH Faraj, S Mohammad, S Kurdo, S Zare, ...
Innovative Infrastructure Solutions 4, 1-11, 2019
232019
Evaluation of structural analysis of tunnel segmental lining using beam-spring method and force-method (Case study: Chamshir water conveyance tunnel)
M Nikkhah, SS Mousavi, S Zare, O Khademhosseini
Journal of Mining and Environment 8 (1), 111-130, 2017
212017
Progress of drill and blast tunnelling efficiency with relation to excavation time and costs
S Zare, A Bruland
Proceedings of the 33rd ITAAITES World Tunnel Congress, Prague, Czech …, 2007
202007
Developing the rule of thumb for evaluating penetration rate of TBM, using binary classification
M Akbarzadeh, S Shaffiee Haghshenas, SME Jalali, S Zare, R Mikaeil
Geotechnical and Geological Engineering 40 (9), 4685-4703, 2022
192022
Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: case study, Kerman water conveyance tunnel
M Karami, S Zare, J Rostami
Bulletin of Engineering Geology and the Environment 80 (5), 3853-3870, 2021
172021
Prediction model and simulation tool for time and costs of drill and blast tunnelling
S Zare
NTNU, 2007
162007
A new multi-graph approach for selecting the sequential excavation method of civil tunnels
A Daraei, S Zare
Tunnelling and Underground Space Technology 91, 102999, 2019
152019
Study of common wear prediction models for hard rock TBM disc cutters and comparison with field observation in Kerman water conveyance tunnel
M Karami, S Zare, J Rostami
Bulletin of Engineering Geology and the Environment 80, 1467-1476, 2021
142021
Prediction of overbreak depth in Ghalaje road tunnel using strength factor
A Daraei, S Zare
International Journal of Mining Science and Technology 28 (4), 679-684, 2018
142018
A new strain-based criterion for evaluating tunnel stability
A Daraei, S Zare
Geomechanics & engineering 16 (2), 205-215, 2018
142018
Application of ANN-PSO algorithm based on FDM numerical modelling for back analysis of EPB TBM tunneling parameters
L Nikakhtar, S Zare, HM Nasirabad, B Ferdosi
European Journal of Environmental and Civil Engineering 26 (8), 3169-3186, 2022
132022
Numerical modelling of backfill grouting approaches in EPB tunneling
L Nikakhtar, S Zare, H Mirzaei Nasir Abad
Journal of mining and environment 11 (1), 301-314, 2020
132020
The system can't perform the operation now. Try again later.
Articles 1–20