The art and science of rail grinding AM Zarembski Simmons-Boardman Books, 2005 | 68 | 2005 |
On the measurement and calculation of vertical track modulus AM Zarembski, J Choros Association of American Railroads, 1979 | 54 | 1979 |
Some examples of big data in railroad engineering AM Zarembski 2014 IEEE international conference on big data (big data), 96-102, 2014 | 50 | 2014 |
Automated turnout inspection AM Zarembski, TL Euston, JW Palese US Patent 8,345,948, 2013 | 50 | 2013 |
Using multiple adaptive regression to address the impact of track geometry on development of rail defects AM Zarembski, D Einbinder, N Attoh-Okine Construction and Building Materials 127, 546-555, 2016 | 44 | 2016 |
Grinding motor energy saving method based on material removal model in rail grinding processes S Zhi, J Li, AM Zarembski International Journal of Precision Engineering and Manufacturing-Green …, 2015 | 30 | 2015 |
Forecasting of track component lives and its use in track maintenance planning AM Zarembski International Heavy Haul Railway ConferenceCanadian Association of Railway …, 1991 | 29 | 1991 |
Predictive modeling of the rail grinding process using a distributed cutting grain approach S Zhi, J Li, AM Zarembski Proceedings of the Institution of Mechanical Engineers, Part F: Journal of …, 2016 | 27 | 2016 |
Transitions eliminate impact at crossings AM Zarembski, J Palese Railway track and structures 99 (8), 2003 | 26 | 2003 |
Estimating maintenance costs for mixed higher speed passenger and freight rail corridors AM Zarembski, P Patel Joint Rail Conference 49071, 383-393, 2010 | 24 | 2010 |
Estimating maintenance costs for mixed higher speed passenger and freight rail corridors AM Zarembski, P Patel Joint Rail Conference 49071, 383-393, 2010 | 24 | 2010 |
Characterization of broken rail risk for freight and passenger railway operations AM Zarembski, JW Palese 2005 AREMA Annual Conference, Chicago, IL, 2005 | 24 | 2005 |
Towards a better understanding of the rail grinding mechanism S Zhi, AM Zarembski, J Li Rail Transportation Division Conference 56116, V001T01A003, 2013 | 22 | 2013 |
Managing risk on the railway infrastructure AM Zarembski, JW Palese Proceedings of the 7th World Congress on Railway Research, Montreal, QC …, 2006 | 22 | 2006 |
The response equations for a cross-tie track AD Kerr, AM Zarembski Acta Mechanica 40 (3), 253-276, 1981 | 22 | 1981 |
Technical Monograph: Estimating Maintenance Costs for Mixed High Speed Passenger and Freight Rail Corridors AM Zarembski, RR Resor, JF Cikota, RU Cogswell, D Plotkin | 20 | 2004 |
Intelligent system for real-time prediction of railway vehicle response to the interaction with track geometry CS Bonaventura, JW Palese, AM Zarembki Proceedings of the 2000 ASME/IEEE Joint Railroad Conference (Cat. No …, 2000 | 20 | 2000 |
Concrete vs. wood ties: Making the economic choice AM Zarembski Conference on maintaining railway track: determining cost and allocating …, 1993 | 20 | 1993 |
On the use of ballast inspection technology for the management of track substructure AM Zarembski, GT Grissom, TL Euston Transportation Infrastructure Geotechnology 1, 83-109, 2014 | 19 | 2014 |
Dynamic effects of track surface condition on vertical wheel/rail forces and energy consumption AM Zarembski, CS Bonaventura Joint Rail Conference 49071, 1-6, 2010 | 19 | 2010 |