Follow
Marcin Gajzler
Title
Cited by
Cited by
Year
Reliability, risk management, and contingency of construction processes and projects
Z Turskis, M Gajzler, A Dziadosz
Journal of Civil Engineering and Management 18 (2), 290-298, 2012
822012
Text and data mining techniques in aspect of knowledge acquisition for decision support system in construction industry
M Gajzler
Technological and Economic Development of Economy, 219-232, 2010
732010
Evaluation of planned construction projects using fuzzy logic
M Gajzler, K Zima
International Journal of Civil Engineering 15, 641-652, 2017
392017
The support of building management in the aspect of technical maintenance
M Gajzler
Procedia Engineering 54, 615-624, 2013
262013
The idea of knowledge supplementation and explanation using neural networks to support decisions in construction engineering
M Gajzler
Procedia Engineering 57, 302-309, 2013
252013
Usefulness of mining methods in knowledge source analysis in the construction industry
M Gajzler
Archives of Civil Engineering 62 (1), 127-142, 2016
182016
Hybrid advisory systems and the possibilities of it usage in the process of industrial flooring repairs
M Gajzler
Proceedings of the 25th International Symposium on Automation and Robotics …, 2008
182008
Neural networks in the advisory system for repairs of industrial concrete floors
M Gajzler
Computer Assisted Methods in Engineering and Science 18 (4), 255-263, 2017
132017
Problematyka wyboru metody wspomagającej podejmowanie decyzji w budownictwie
M Gajzler, A Dziadosz, P Szymański
Czasopismo Techniczne 1, 69-84, 2010
122010
Knowledge modeling in construction of technical management system for large warehousing facilities
M Gajzler
Procedia Engineering 122, 181-190, 2015
92015
Hybrydowy system doradczy dla napraw betonowych posadzek przemysłowych
M Gajzler
rozprawa doktorska, Politechnika Poznańska, 2008
72008
Protocols from periodic inspection of buildings in text mining analysis-advantages and problems of analysis
M Gajzler
MATEC Web of Conferences 222, 01004, 2018
62018
Supporting of repairs processes of concrete industrial floors
M Gajzler
Engineering Structures and Technologies 8 (1), 8-14, 2016
62016
Hybrid advisory system for the process of industrial flooring repairs
M Gajzler
Advances and Trends in Structural Engineering, Mechanics and Computation. A …, 2010
62010
The use of fuzzy logic in decision-making systems
M Gajzler
Foundations of Civil and Environmental Engineering 5, 7-20, 2004
62004
The possibility of using neural networks in data analysis connected with observation in the construction process simulation
M Gajzler, A Konczak
Procedia Engineering 122, 228-234, 2015
52015
Supporting the technical management of residential buildings in the process of their exploitation
M Gajzler
Archives of Civil Engineering 67 (2), 2021
42021
Analysis of knowledge sources and processing in the construction area
M Gajzler
Czasopismo Techniczne 2014 (Budownictwo Zeszyt 1-B (5) 2014), 137-144, 2014
42014
Wpływ rozwiązań projektowych na wielkość kosztów w cyklu życia inwestycji budowlanej
M Gajzler, N Puklińska, A Dziadosz
Archiwum Instytutu Inżynierii Lądowej, 131-136, 2012
42012
Zagadnienie wyboru lokalizacji z wykorzystaniem metodyk data mining
M Gajzler
Budownictwo i Inżynieria Środowiska 2 (3), 253-261, 2011
42011
The system can't perform the operation now. Try again later.
Articles 1–20