Follow
Mohammad Mirabi
Mohammad Mirabi
department of Industrila Engineering, Meybod University, Meybod
Verified email at meybod.ac.ir
Title
Cited by
Cited by
Year
Efficient stochastic hybrid heuristics for the multi-depot vehicle routing problem
M Mirabi, SMTF Ghomi, F Jolai
Robotics and Computer-Integrated Manufacturing 26 (6), 564-569, 2010
1252010
A two-stage hybrid flowshop scheduling problem in machine breakdown condition
M Mirabi, SMTF Ghomi, F Jolai
Journal of Intelligent Manufacturing 24, 193-199, 2013
502013
Ant colony optimization technique for the sequence-dependent flowshop scheduling problem
M Mirabi
The International Journal of Advanced Manufacturing Technology 55, 317-326, 2011
482011
A novel hybrid genetic algorithm to solve the sequence-dependent permutation flow-shop scheduling problem
M Mirabi
The International Journal of Advanced Manufacturing Technology 71 (1), 429-437, 2014
332014
Modeling and solving the multi-depot vehicle routing problem with time window by considering the flexible end depot in each route
M Mirabi, N Shokri, A Sadeghieh
International Journal of Supply and Operations Management 3 (3), 1373-1390, 2016
262016
A hybrid electromagnetism algorithm for multi-depot periodic vehicle routing problem
M Mirabi
The International Journal of Advanced Manufacturing Technology 71 (1), 509-518, 2014
232014
A novel hybrid genetic algorithm for the multidepot periodic vehicle routing problem
M Mirabi
AI EDAM 29 (1), 45-54, 2015
192015
A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs
M Mirabi
The International Journal of Advanced Manufacturing Technology 54, 1109-1119, 2011
172011
A hybrid simulated annealing for the single-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times and costs and dynamic release of jobs
M Mirabi
The International Journal of Advanced Manufacturing Technology 54, 1109-1119, 2011
172011
A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
M Mirabi, SMT Fatemi Ghomi, F Jolai
Journal of Industrial Engineering International 10, 1-9, 2014
142014
A hybrid electromagnetism-like algorithm for supplier selection in make-to-order planning
M Mirabi, GSMT FATEMI, F JOULAI
SCIENTIA IRANICA 17 (1), 1-11, 2010
122010
Hybrid electromagnetism-like algorithm for the flowshop scheduling with sequence-dependent setup times
M Zandieh, F Jolai, SMT Fatemi Gho, M Mirabi
Journal of Applied Sciences 8 (20), 3621-3629, 2008
122008
Hybrid ant colony optimization for capacitated multiple-allocation cluster hub location problem
M Mirabi, P Seddighi
AI EDAM 32 (1), 44-58, 2018
102018
Ranking of leagility factors based on job satisfaction through a combinatory model of fuzzy TOPSIS and AHP (case study: MRI Hospital, Shiraz, Iran)
HD Denavi, M Mirabi, A Rezaei
Open Journal of Business and Management 6 (1), 21-38, 2017
82017
Ranking and evaluating the factors affecting the success of management team in construction projects
MB Zare, A Mirjalili, M Mirabi
Journal of Fundamental and Applied Sciences 8 (3), 614-630, 2016
72016
Impact of supply chain management and agile supply chain on customer satisfaction and competitive advantage
M Mirabi, AS Hatami, S Karamad
International Journal of Engineering and Technology 10 (4), 995-1004, 2018
42018
Analysing acceptance sampling plans by Markov chains
M Mirabi, MS Fallahnezhad
South African Journal of Industrial Engineering 23 (1), 151-161, 2012
42012
A hybrid genetic algorithm for the sequence dependent flow-shop scheduling problem
M Mirabi
International Journal of Industrial and Manufacturing Engineering 5 (7 …, 2011
42011
Optimization Portfolio Selection in Risk Situations with Combined Meta-Heuristic Algorithm of Genetic Algorithm (GA) and Lion Optimization Algorithm (LOA)
M Mirabi, M Zarei Mahmoudabadi
Financial Management Perspective 10 (32), 33-56, 2020
32020
Mathematical modeling and solving a hub location-allocation problem in Iranian airports
M Mirabi, H Ghiyasvand-Mohammadkhani, R Tavakkoli-Moghaddam
Quarterly Journal of Transportation Engineering, 2019
22019
The system can't perform the operation now. Try again later.
Articles 1–20