Selecting transfer station locations for large solid waste systems Ö Kirca, N Erkip European journal of operational research 35 (3), 339-349, 1988 | 163 | 1988 |
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem A Tozkapan, Ö Kırca, CS Chung Computers & Operations Research 30 (2), 309-320, 2003 | 158 | 2003 |
Tardiness minimization on parallel machines M Azizoglu, O Kirca International Journal of Production Economics 55 (2), 163-168, 1998 | 158 | 1998 |
A branch‐and‐bound‐based heuristic for solving the quadratic assignment problem MS Bazaraa, O Kirca Naval research logistics quarterly 30 (2), 287-304, 1983 | 131 | 1983 |
A heuristic for obtaining and initial solution for the transportation problem Ö Kirca, A Şatir Journal of the Operational Research Society 41 (9), 865-871, 1990 | 112 | 1990 |
On the minimization of total weighted flow time with identical and uniform parallel machines M Azizoglu, O Kirca European Journal of Operational Research 113 (1), 91-100, 1999 | 86 | 1999 |
A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems CS Chung, J Flynn, O Kirca International Journal of Production Economics 79 (3), 185-196, 2002 | 85 | 2002 |
A new heuristic approach for the multi-item dynamic lot sizing problem Ö Kirca, M Kökten European Journal of Operational Research 75 (2), 332-341, 1994 | 81 | 1994 |
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions M Azizoglu, O Kirca IIE transactions 31 (2), 153-159, 1999 | 76 | 1999 |
A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems CS Chung, J Flynn, Ö Kirca European Journal of Operational Research 174 (1), 1-10, 2006 | 67 | 2006 |
Bicriteria scheduling problem involving total tardiness and total earliness penalties M Azizoǧlu, S Kondakci, Ö Kirca International Journal of Production Economics 23 (1-3), 17-24, 1991 | 62 | 1991 |
An integrated production and financial planning model and an application Ö Kirca, MM Köksalan IIE transactions 28 (8), 677-686, 1996 | 51 | 1996 |
A multi-item newsvendor problem with preseason production and capacitated reactive production CS Chung, J Flynn, Ö Kirca European Journal of Operational Research 188 (3), 775-792, 2008 | 48 | 2008 |
An efficient algorithm for the capacitated single item dynamic lot size problem Ö Kirca European Journal of Operational Research 45 (1), 15-24, 1990 | 47 | 1990 |
The coordinated replenishment dynamic lot-sizing problem with quantity discounts CS Chung, SH Hum, O Kirca European Journal of Operational Research 94 (1), 122-133, 1996 | 43 | 1996 |
A location-distribution application for a beer company M Köksalan, H Süral, Ö Kirca European Journal of Operational Research 80 (1), 16-24, 1995 | 41 | 1995 |
Flow shop-sequencing problem with synchronous transfers and makespan minimization B Soylu, Ö Kirca, M Azizoğlu International Journal of Production Research 45 (15), 3311-3331, 2007 | 36 | 2007 |
A primal‐dual algorithm for the dynamic lotsizing problem with joint set‐up costs Ö Kirca Naval Research Logistics (NRL) 42 (5), 791-806, 1995 | 34 | 1995 |
An efficient algorithm for the single machine tardiness problem S Kondakci, Ö Kirca, M Azizoǧlu International journal of production economics 36 (2), 213-219, 1994 | 29 | 1994 |
An optimal procedure for the coordinated replenishment dynamic lot‐sizing problem with quantity discounts CS Chung, SH Hum, O Kirca Naval Research Logistics (NRL) 47 (8), 686-695, 2000 | 24 | 2000 |