An Expert System Dataset for Checking the Potential for Administering a Covid-19 Vaccine in Indonesia: Forward-Chaining Inference Machine Approach RR Al Hakim, GE Setyowisnu, A Pangestu Journal of Global Engineering Research and Science 1 (1), 1-4, 2022 | 8 | 2022 |
Aerodynamic Simulation on Roof for 3,000 Watt Electric Car With Ansys R1 2022 Modeling CH Hamidi, A Sunardi, R Ariansyah Journal of Global Engineering Research and Science 1 (1), 29-35, 2022 | 2 | 2022 |
Design of Arduino Uno-Based Automatic Object Sorter Belt Conveyor System Using Ultrasonic Sensors S Restuasih, A Gamayel, R Agustino Journal of Global Engineering Research and Science 1 (1), 36-44, 2022 | 1 | 2022 |
Work Analysis of Wire Handling Process Using Work Sampling Method and Standard Time Determination AN Haryudiniarti, W Putri Journal of Global Engineering Research and Science 1 (1), 17-23, 2022 | 1 | 2022 |
Electric Car Frame Body Design Fullset Dynamo Capacity 3.000 Watt With Solidworks Modeling 2020 H Hardianto, A Sunardi, R Ariansyah Journal of Global Engineering Research and Science 1 (1), 24-28, 2022 | 1 | 2022 |
Design and Manufacture of Electric Car Chasis Frame for Two Passengers With Solidworks Modeling 2020 A Zaenuri, A Sunardi, K Kasum Journal of Global Engineering Research and Science 1 (1), 12-16, 2022 | 1 | 2022 |
Determination of better insulating oil for power transformer oil application using Analytical Hierarchy Process (AHP) YZ Arief, N Abd Hamid, MHI Saad, RR Al Hakim Journal of Global Engineering Research and Science 1 (1), 45-58, 2022 | 1 | 2022 |
Pengaruh Fraksi Massa dan Bentuk serat Pisang Abaka Terhadap Kekuatan Tarik Pada Proses Pembuatan Komposit M Halim, RH Hendaryati, MI Mamungkas Journal Technology Urgency Breaktrugh in Engineering 1 (1), 59-66, 2022 | 1 | 2022 |
IoT-based pesticide distribution control system with photometric sensor framework RR Al Hakim, I Islam, R Ropiudin, A Pangestu, A Jaenul, Y Arief, ... Journal of Global Engineering Research and Science 1 (2), 35-41, 2022 | | 2022 |
PLANNING EARTHQUAKE RESISTANT UPPER BUILDING STRUCTURES WITH MOMENT GRABBING FRAME SYSTEM IN THE MARDHIKA PARK APARTMENT BUILDING 20 FLOORS TAMBUN–BEKASI H Muhlisin, RN Sari, S Sukatja Journal of Global Engineering Research and Science 1 (2), 8-18, 2022 | | 2022 |
Superstructure Planning of 21 Floor Swasana Building Anami Tower B Klapa Village Project AY Sirie Journal of Global Engineering Research and Science 1 (2), 1-7, 2022 | | 2022 |
The structural planning of the girder pci girder spanning 25.90 m Pier 20-21 on the Cimanggis-Cibitung Cctw 2 Toll Road Project SS Islami Journal of Global Engineering Research and Science 1 (2), 27-34, 2022 | | 2022 |
Planning of Development Upper Structure of the Rorotan Labor Intensive Flats North Jakarta W Winanto Journal of Global Engineering Research and Science 1 (2), 19-26, 2022 | | 2022 |