Suivre
M.-Lounes Bentaha
M.-Lounes Bentaha
Adresse e-mail validée de univ-lyon2.fr
Titre
Citée par
Citée par
Année
An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
ML Bentaha, O Battaïa, A Dolgui
International Journal of Production Research 53 (6), 1807-1818, 2015
1662015
A sample average approximation method for disassembly line balancing problem under uncertainty
ML Bentaha, O Battaïa, A Dolgui
Computers & Operations Research 51, 111-122, 2014
1532014
Second order conic approximation for disassembly line design with joint probabilistic constraints
ML Bentaha, O Battaïa, A Dolgui, SJ Hu
European Journal of Operational Research 247 (3), 957-967, 2015
902015
Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty
ML Bentaha, A Dolgui, O Battaïa, RJ Riggs, J Hu
International Journal of Production Research 56 (24), 7220-7242, 2018
832018
Disassembly line balancing and sequencing under uncertainty
ML Bentaha, O Battaïa, A Dolgui
Procedia Cirp 15, 239-244, 2014
832014
Dealing with uncertainty in disassembly line design
ML Bentaha, O Battaïa, A Dolgui, SJ Hu
CIRP Annals 63 (1), 21-24, 2014
812014
Lagrangian relaxation for stochastic disassembly line balancing problem
ML Bentaha, O Battaïa, A Dolgui
Procedia Cirp 17, 56-60, 2014
592014
Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts
ML Bentaha, O Battaïa, A Dolgui
Advances in Production Management Systems. Sustainable Production and …, 2013
492013
A bibliographic review of production line design and balancing under uncertainty
ML Bentaha, A Dolgui, O Battaïa
IFAC-PapersOnLine 48 (3), 70-75, 2015
482015
A stochastic formulation of the disassembly line balancing problem
ML Bentaha, O Battaïa, A Dolgui
Advances in Production Management Systems. Competitive Manufacturing for …, 2012
442012
A decision tool for disassembly process planning under end-of-life product quality
ML Bentaha, A Voisin, P Marangé
International Journal of Production Economics 219, 386-401, 2019
412019
Disassembly line balancing problem with fixed number of workstations under uncertainty
ML Bentaha, O Battaïa, A Dolgui
IFAC Proceedings Volumes 47 (3), 3522-3526, 2014
252014
A decomposition method for stochastic partial disassembly line balancing with profit maximization
ML Bentaha, O Battala, A Dolgui
2013 IEEE International Conference on Automation Science and Engineering …, 2013
192013
L-shaped algorithm for stochastic disassembly line balancing problem
ML Bentaha, O Battaïa, A Dolgui
IFAC Proceedings Volumes 46 (9), 407-411, 2013
192013
Iterated Local Search for dynamic assembly line rebalancing problem
A Manceaux, HB El-Haouzi, WR Cherif-Khettaf, ML Bentaha
8th IFAC Conference on Manufacturing Modelling, Management and Control, 2016
17*2016
End-of-Life product quality management for efficient design of disassembly lines under uncertainty
ML Bentaha, P Marangé, A Voisin, N Moalla
International Journal of Production Research 61 (4), 1146-1167, 2023
122023
Improvement of the Containerized Logistics Performance Using the Unitary Traceability of Smart Logistics Units
S Wattanakul, S Henry, ML Bentaha, N Reeveerakul, Y Ouzrout
Product Lifecycle Management to Support Industry 4.0 540, 410-419, 2018
92018
Emergent technologies for inter-enterprises collaboration and business evaluation
I Benali, B Dafflon, L Bentaha, N Moalla
2017 11th International Conference on Software, Knowledge, Information …, 2017
72017
Improving risk management by using smart containers for real-time traceability
S Wattanakul, S Henry, ML Bentaha, N Reeveerakul, Y Ouzrout
arXiv preprint arXiv:1810.13332, 2018
62018
Prise en compte de l'état des produits pour la planification de leur désassemblage
ML Bentaha, A Voisin, P Marangé, O Battaïa, A Dolgui
Journal Européen des Systèmes Automatisés (JESA) 49 (4-5), 579-605, 2016
62016
Le système ne peut pas réaliser cette opération maintenant. Veuillez réessayer plus tard.
Articles 1–20