Follow
Andi
Andi
Verified email at petra.ac.id
Title
Cited by
Cited by
Year
Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process
T Minato
International Journal of Project Management 21 (7), 537-546, 2003
1672003
Representing causal mechanism of defective designs: A system approach considering human errors
T Minato
Construction Management and Economics 21 (3), 297-305, 2003
872003
The importance and allocation of risks in Indonesian construction projects
Andi
Construction Management and Economics 24 (1), 69-80, 2006
632006
Model persamaan struktural pengaruh budaya keselamatan kerja pada perilaku pekerja di proyek konstruksi
A Andi, RS Alifen, A Chandra
Jurnal Teknik Sipil ITB 12 (3), 127-136, 2005
482005
Faktor-faktor penyebab rework pada pekerjaan konstruksi
A Andi, S Winata, Y Handarlim
Civil Engineering Dimension 7 (1), 22-29, 2005
372005
On representing factors influencing time performance of shop-house constructions in Surabaya
A Andi, S Susandi, H Wijaya
Civil Engineering Dimension 5 (1), 7-13, 2003
372003
Construction workers perceptions toward safety culture
A Andi
Civil Engineering Dimension 10 (1), 1-6, 2008
312008
Representing causal mechanism of defective designs: Exploration through case studies
Andi, T Minato
Construction Management and Economics 22 (2), 183-192, 2004
262004
Basic actual and effectiveness of leadership styles of construction project managers in Surabaya
A Andi, WK Santoso, RC Tali
Civil Engineering Dimension 6 (1), 32-39, 2004
172004
Owner and contractor perceptions toward factors causing delays in structural and finishing works
A Andi, D Lalitan, VR Loanata
Civil Engineering Dimension 12 (1), 8-17, 2010
122010
Analisa Produktifitas Pekerja dengan Metode Work Sampling Studi Kasus pada Proyek X dan Y
A Andi, A Prasetya
Civil Engineering Dimension 6 (2), 72-79, 2004
122004
Navigational measures for managing defective designs
Andi
Journal of Management in Engineering 21 (1), 10-16, 2005
62005
Appropriate allocation of contingency using risk analysis methodology
A Andi
Civil Engineering Dimension 6 (1), 40-48, 2004
62004
Evaluasi Penerapan 5S di Area Penyimpanan Alat pada Beberapa Proyek Konstruksi
F Soekresno, J Rahardjo
Jurnal Media Teknik Sipil 14 (2), 147-157, 2016
42016
Motivasi Pekerja Pada Beberapa Proyek Konstruksi Di Surabaya
A Andi, D Djendoko
Civil Engineering Dimension 6 (2), 80-87, 2004
42004
Modeling the influence of project manager trustworthy leadership behavior upon construction team trust
A Andi, H Santoso, J Simanjuntak
Civil Engineering Dimension 10 (2), 109-117, 2008
32008
Potential Influence of project manager's leadership behaviors on construction team trust
Andi
10th EASEC, Bangkok, 2006
22006
Pengembangan indeks biaya konstruksi rumah sejahtera murah di beberapa daerah di Indonesia
TT Libianto, L Arijanto
Jurnal Media Teknik Sipil 14 (2), 215-226, 2016
12016
safety defenSes in construction projects
A Andi, A Cahyono, R Hartawan
EACEF-International Conference of Civil Engineering 1, 154-154, 2011
2011
A proactive approach for predicting recurrent defective designs
T Minato
Building and environment 42 (9), 3186-3193, 2007
2007
The system can't perform the operation now. Try again later.
Articles 1–20