Ikuti
Asri Nurdiana
Asri Nurdiana
Civil Engineering, Diponegoro University
Email yang diverifikasi di live.undip.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Analisis biaya tidak langsung pada proyek pembangunan best western star hotel & star apartement semarang
A Nurdiana
Teknik 36 (2), 105-109, 2015
262015
Sensitivity analysis of risk from stakeholders’ perception Case study: Semarang-Solo highway project section I (Tembalang-Gedawang)
A Nurdiana, MA Wibowo, JUD Hatmoko
Procedia Engineering 125, 12-17, 2015
222015
Identification of potential uses of building information modeling (BIM) for construction supply chain management: preliminary studies
MN Sholeh, A Nurdiana, B Setiabudi
IOP Conference Series: Earth and Environmental Science 448 (1), 012064, 2020
17*2020
Aplikasi Manajemen Resiko Dari Persepsi Para Stakeholders (Studi Kasus Proyek Pembangunan Jalan Tol Semarang-Solo Seksi I Ruas Tembalang-Gedawang)
A Nurdiana, MA Wibowo, DH Utomo
magister teknik sipil, 2011
152011
Cost overrun in construction projects in Indonesia
R Susanti, A Nurdiana
IOP Conference Series: Earth and Environmental Science 506 (1), 012039, 2020
142020
The identification of waste construction at construction project life cycle
MA Wibowo, NU Handayani, A Nurdiana, MN Sholeh
Advanced Science Letters 23 (3), 2633-2635, 2017
142017
Implementation of construction supply chain flow based on SCOR 12.0 performance standards
MN Sholeh, A Nurdiana, B Dharmo
Journal of Physics: Conference Series 1833 (1), 012012, 2021
132021
Assessing risk on the engineering procurement construction (EPC) project from the perspective of the owner: a case study
A Nurdiana, R Susanti
IOP Conference Series: Earth and Environmental Science 506 (1), 012040, 2020
112020
Analisis Kelayakan Usaha Pengasapan Ikan di Desa Toolawawo Kecamatan Lalonggasumeeto Kabupaten Konawe
CM Hapsari, S Yusuf, A Nurdiana
Jurnal Sosial Ekonomi Perikanan 1 (2), 85-97, 2018
112018
Developing indicators of green initiation and green design of green supply chain management in construction industry
MA Wibowo, NU Handayani, N Farida, A Nurdiana
E3S Web of Conferences 115, 02006, 2019
102019
Determining factors for implementing green supply chain management in the construction industry: a literature review
MA Wibowo, NU Handayani, A Mustikasari, A Nurdiana, MN Soleh
MATEC Web of Conferences 159, 01022, 2018
92018
Pengantar Ekonomi Perikanan
RD Siang, A Nurdiana
Unhalu-Press. Kendari, 2010
82010
Risk management in Indonesia construction project: A case study of a toll road project
MA Wibowo, JUD Hatmoko, A Nurdiana
Risk Management Treatise for Engineering Practitioners, 2018
72018
Mapping of information and identification of construction waste at project life cycle
MA Wibowo, NU Handayani, A Nurdiana, MN Sholeh, GS Pamungkas
AIP Conference Proceedings 1941 (1), 2018
72018
An analysis of antioxidants, organoleptics and hedonics with variations of boiling time in Jasmine tea and Jasmine root tea a study on Kaliprau, Pemalang
F Arifan, S Winarni, G Handoyo, A Nurdiana, S Risdiyanti
Journal of Physics: Conference Series 1025 (1), 012066, 2018
62018
Hexalock Brick: Inovasi Batako Pendukung Konsep Pre-Febricate Building Yang Ringan, Ekonomis Dan Ramah Lingkungan
SA Nugroho, MD Fadilah, TB Ginting, A Nurdiana
Jurnal Proyek Teknik Sipil 2 (1), 25-30, 2019
52019
Analisis Faktor-Faktor Yang Mempengaruhi Keputusan Konsumen Dalam Pembelian Ikan Di Pangkalan Pendaratan Ikan Kota Kendari
MR Ulfat, S Yusuf, A Nurdiana
Jurnal Sosial Ekonomi Perikanan FPIK UHO ISSN, 18-26, 2017
52017
What causes cost overrun in highway strategic project in Indonesia?
R Susanti, A Nurdiana, YF Kurnianto
IOP Conference Series: Earth and Environmental Science 700 (1), 012050, 2021
42021
Pendampingan inventarisasi faktor penyebab banjir dan rob di DAS Kendal Kabupaten Kendal
A Nurdiana, S Fauziyah, S Sutanto
Jurnal Pengabdian Vokasi 1 (4), 290-293, 2020
42020
Risk study on supply chain management in construction (Case study: Building projects in Indonesia)
A Nurdiana, MN Sholeh
IOP Conference Series: Materials Science and Engineering 669 (1), 012042, 2019
42019
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20