Follow
Renato de Matta
Renato de Matta
Verified email at uiowa.edu
Title
Cited by
Cited by
Year
Scheduling patients in an ambulatory surgical center
VN Hsu, R De Matta, CY Lee
Naval Research Logistics (NRL) 50 (3), 218-238, 2003
1522003
Strategies to reduce delays in admission into a postanesthesia care unit from operating rooms
F Dexter, RH Epstein, E Marcon, R De Matta
Journal of PeriAnesthesia Nursing 20 (2), 92-102, 2005
1122005
A Global Supply Chain Profit Maximization and Transfer Pricing Model
T Miller, R de Matta
Journal of Business Logistics 29, 175-200, 2008
902008
Production and inter-facility transportation scheduling for a process industry
R de Matta, T Miller
European Journal of Operational Research 158 (1), 72-88, 2004
902004
Dynamic production scheduling for a process industry
R de Matta, M Guignard
Operations Research 42 (3), 492-503, 1994
541994
Channel coordination in a consignment contract
D Zhang, R de Matta, TJ Lowe
European Journal of Operational Research 207 (2), 897-905, 2010
522010
The Performance of Rolling Production Schedules in a Process Industry
R de Matta, M Guignard
IIE Transactions 27, 564-573, 1995
501995
Updating a modular product: How to set time to market and component quality
L Wu, R de Matta, TJ Lowe
IEEE Transactions on Engineering Management 56 (2), 298-311, 2009
492009
Integrating Production and Transportation Scheduling Decisions Between Two Geographically Separated Plants
R de Matta, T Miller
Journal of Business Logistics 24, 111-146, 2003
352003
Formation of a Strategic Manufacturing and Distribution Network with Transfer Prices
R de Matta, T Miller
European Journal of Operational Research 241 (2), 435-448, 2015
342015
Competition in the multi-sided platform market channel
R de Matta, TJ Lowe, D Zhang
International Journal of Production Economics 189, 40-51, 2017
322017
Developing work schedules for an inter-city transit system with multiple driver types and fleet types
R de Matta, E Peters
European Journal of Operational Research 192 (3), 852-865, 2009
292009
Consignment or wholesale: Retailer and supplier preferences and incentives for compromise
R de Matta, TJ Lowe, D Zhang
Omega 49, 93-106, 2014
272014
The effects of changeover and production loss on capacity-oriented production scheduling
R de Matta, M Guignard
European Journal of Operational Research 72 (1), 62-73, 1994
25*1994
Production scheduling with sequence-independent changeover cost
R de Matta, M Guignard
Working PaperThe Wharton School, University of Pennsylvania, 1989
221989
Short-term work scheduling with job assignment flexibility for a multi-fleet transport system
E Peters, R de Matta, W Boe
European journal of operational research 180 (1), 82-98, 2007
192007
An efficient heuristic approach to recognize the infeasibility of a loading problem
VN Hsu, R de Matta
International journal of flexible manufacturing systems 9 (1), 31-50, 1997
171997
A Lagrangean decomposition solution to a single line multiproduct scheduling problem
R de Matta
European Journal of Operational Research 79 (1), 25-37, 1994
171994
Contingency planning during the formation of a supply chain
R De Matta
Annals of operations research 257, 45-75, 2017
162017
Managing Product Variety in a Supply Chain
R de Matta, T Lowe, L Wu
IEEE Transactions on Engineering Management 62 (1), 4-17, 2015
162015
The system can't perform the operation now. Try again later.
Articles 1–20