Delay and Cost Overrun in Infrastructure Projects in Jordan N Al-Hazim, ZA Salem, H Ahmad Procedia Engineering 182, 18-24, 2017 | 239 | 2017 |
Delay and Cost Overrun in Road Construction Projects in Jordan N Al-Hazim, ZA Salem International Journal of Engineering & Technology 4 (2), 288, 2015 | 79 | 2015 |
Determinations of critical gap and follow-up time at roundabouts in Jordan N Hazim, SM Bazlamit, ZA Salem, O Alghazawi, I Odeh Roads and Bridges-Drogi i Mosty 18 (3), 227-234, 2019 | 6 | 2019 |
Impact of Roadside Fixed Objects in Traffic Conditions N Hazim, L Shbeeb, ZA Salem Engineering, Technology & Applied Science Research 10 (2), 5428-5433, 2020 | 5 | 2020 |
Improving Traffic Incident Management Using Intelligent Transportation Systems, A Case of Amman City N Hazim, MR Hassan Turkish Journal of Computer and Mathematics Education 12 (12), 4343-4352, 2021 | 3 | 2021 |
Analysis of Air Pollutants’ Concentration in Terms of Traffic Conditions and Road Gradient in an Urban Area Z Abusalem, I Odeh, N Al-Hazim, SM Bazlamit, A Al-Saket Jordan Journal of Civil Engineering 13 (3), 2019 | 3 | 2019 |
Badania i symulacja ruchu drogowego na skrzyzowaniach typu rondo. NG Hazim | 3 | 1994 |
Modelling the Effects of Environmental Factors on Traffic Flow Parameters N Hazim, L Shbeeb International Journal of Engineering Research and Technology 12 (12), 2910-2924, 2019 | 1 | 2019 |
Rural Road Construction Productivity Growth in Jordan N Hazim, ZA Salem, N Louzi International Journal of Engineering Research and Technology 12 (12), 2627-2632, 2019 | 1 | 2019 |
Modelling of vehicular speed and headway on urban route in Amman City OK Alghazawi, Z Abu Salem, N Al-Hazim International journal of engineering research and technology (Gujarat) 14 (3 …, 2021 | | 2021 |
WYZNACZANIE BEZPIECZNYCH ODLEG£ OOECI POMIÉDZY POJAZDAMI I CZASÓW DOJAZDU NA RONDACH W JORDANII. N HAZIM, SM BAZLAMIT, ZABU SALEM, O ALGHAZAWI, I ODEH Roads & Bridges/Drogi i Mosty 18 (3), 2019 | | 2019 |