Follow
Prof assistant Abbas M Abd, AM abd, Abbas M. Abd Najim, Abbas M. Abd
Prof assistant Abbas M Abd, AM abd, Abbas M. Abd Najim, Abbas M. Abd
Department of Highway and Airport Engineering, College of Engineering / University of Diyala, Iraq
Verified email at uodiyala.edu.iq - Homepage
Title
Cited by
Cited by
Year
Predicting compressive strength of lightweight foamed concrete using extreme learning machine model
ZM Yaseen, RC Deo, A Hilal, AM Abd, LC Bueno, S Salcedo-Sanz, ...
Advances in Engineering Software 115, 112-125, 2018
3752018
Modelling the strength of lightweight foamed concrete using support vector machine (SVM)
AM Abd, SM Abd
Case studies in construction materials 6, 8-15, 2017
1732017
Barriers of Adoption Building Information Modeling (BIM) in Construction Projects of Iraq
WA Hatem, AM Abd, NN Abbas
Engineering Journal , https://doi.org/10.4186/ej.2018.22.2.59 22 (2), 59-81, 2018
712018
Documentation of construction project using integration of BIM and GIS technique
AM Abd, AH Hameed, BM Nsaif
Asian Journal of Civil Engineering 21, 2020
322020
As built case studies for BIM as conflicts detection and documentation tool
AM Abd, AS Khamees
Cogent Engineering 4 (1), 1411865, 2017
282017
Motivation Factors for Adopting Building Information Modeling (BIM) in Iraq.
WA Hatem, AM Abd, NN Abbas
Engineering, Technology & Applied Science Research 8 (2), 2018
272018
Approach to analyze risk factors for construction projects utilizing fuzzy logic
A Ismail, A M Abd, ZB Chik
Journal of Applied Sciences 8 (20), 3738-3742, 2008
252008
Performance assessment modelling for the integrated management system in construction projects
A Ismail, AM Abd, Z Chik, MFM Zain
European Journal for Scientific Research 29 (2), 269-280, 2009
172009
Producing Lightweight Foam Concrete Building Units Using Local Resources
AM Abd, DS Jarullah
Civil And Environmental Research 8 (10), 54-63, 2016
152016
Utilization of value engineering to optimize concreting productivity
AM Abd, SM Abd, A Ismail, MFM Zain
Journal of Applied Sciences 8 (19), 3479-3484, 2008
142008
Development of productivity assessment methodology for concreting process
SM Abd, AM Abd, MFM Zain, A Ismail
ARPN Journal of Engineering and Applied Sciences 3 (5), 1-7, 2008
142008
Modeling of risk assessment for integrated project management system in construction
A Ismail, AM Abd, ZB Chik
Journal of Engineering and Applied Sciences 2 (6), 37-47, 2007
92007
Integrity of Revit with structural analysis softwares
AS Hadi, AM Abd, M Mahmood
IOP Conference Series: Materials Science and Engineering 1076 (1), 012119, 2021
82021
Predicting the Final Cost of Iraqi Construction Project Using Artificial Neural Network (ANN)
AM Abd, FS Naseef
Indian Journal of Science and Technology 12 (28), 1-7, 2019
82019
Resources sustainability planning model using hierarchical approach for construction project
AM Abd, SM Abd
Diyala Journal of Engineering Sciences 5 (2), 1-19, 2012
82012
Modelling the strength of lightweight foamed concrete using support vector machine (SVM), Case Stud. Constr. Mater., 6 (2017) 8–15
AM Abd, SM Abd
8
Testing a Measurement Model of BIM Potential Benefits in Iraqi Construction Projects
WA Hatem, AM Abd, NN Abbas
CIVIL ENGINEERING JOURNAL, ISSN: 2476-3055 3 (12), 1349-1365, 2018
72018
BIM as Evaluation Tool for Existing Building Energy and Quantities Takeoff
AM Abd, A Sameer
Civil Engineering Journal, ISSN: 2476-3055 3 (12), 1247-1253, 2018
62018
Artificial neural network model for managing and forecasting water reservoir discharge (Hemren Reservoir as a case study)
AM ABD, SSH SAMMEN
Diyala Journal of Engineering Sciences, 132-143, 2014
62014
Neuro-fuzzy model to evaluate ready-mix concrete properties
AM Abd, SM Abd
Int. J. Engg. Res. & Sci. & Tech (IJERST) 3 (1), 24-33, 2014
52014
The system can't perform the operation now. Try again later.
Articles 1–20