Follow
Fernando Arranz
Fernando Arranz
Verified email at ciemat.es
Title
Cited by
Cited by
Year
The accomplishment of the engineering design activities of IFMIF/EVEDA: the European–Japanese project towards a Li (d, xn) fusion relevant neutron source
J Knaster, A Ibarra, J Abal, A Abou-Sena, F Arbeiter, F Arranz, JM Arroyo, ...
Nuclear Fusion 55 (8), 086003, 2015
872015
The IFMIF-DONES fusion oriented neutron source: evolution of the design
Nuclear Fusion 63, 14, 2021
52*2021
Design of a beam dump for the IFMIF-EVEDA accelerator
B Brañas, D Iglesias, F Arranz, G Barrera, N Casal, M García, J Gómez, ...
Fusion Engineering and Design 84 (2-6), 509-513, 2009
342009
Caracterización mecánica del material óseo.
ER Rincón, FA Merino, AR Felip, RC Alonso
Tecnología y desarrollo 2, 24, 2004
282004
The IFMIF-DONES project: design status and main achievements within the EUROfusion FP8 work programme
D Bernardi, A Ibarra, F Arbeiter, F Arranz, M Cappelli, P Cara, ...
Journal of Fusion Energy 41 (2), 24, 2022
272022
The IFMIF-EVEDA accelerator beam dump design
D Iglesias, F Arranz, JM Arroyo, G Barrera, B Brañas, N Casal, M García, ...
Journal of Nuclear Materials 417 (1-3), 1275-1279, 2011
272011
Validation of the linear IFMIF prototype accelerator (LIPAc) in Rokkasho
K Kondo, T Akagi, F Arranz, N Bazin, L Bellan, B Bolzon, B Branas, ...
Fusion Engineering and Design 153, 111503, 2020
262020
The LIPAc beam dump
B Brañas, F Arranz, O Nomen, D Iglesias, F Ogando, M Parro, ...
Fusion Engineering and Design 127, 127-138, 2018
242018
Preliminary design of the HEBT of IFMIF DONES
O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ...
Fusion Engineering and Design 153, 111515, 2020
212020
Design and analysis of the IFMIF–EVEDA beam dump cooling system
M Parro, N Casal, D Iglesias, F Arranz, B Branas
Fusion Engineering and Design 87 (4), 332-335, 2012
172012
Detailed mechanical design of the LIPAc beam dump radiological shielding
O Nomen, JI Martínez, F Arranz, D Iglesias, G Barrera, B Brañas, ...
Fusion Engineering and Design 88 (9-10), 2723-2727, 2013
142013
Lead shutter for the IFMIF LIPAc accelerator
O Nomen, B Brañas, F Ogando, F Arranz, P Sauvan, J Castellanos
Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2018
122018
Evaluation of the electroforming technique for IFMIF-EVEDA beam dump manufacturing
F Arranz, B Brañas, M Busch, M González, A Muñoz, B Szcepaniak, ...
Fusion Science and Technology 60 (2), 538-543, 2011
112011
Design of the HEBT components inside TIR room of the IFMIF DONES facility
D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela
Fusion Engineering and Design 168, 112636, 2021
82021
Remote disconnection system for the beam dump of the LIPAc accelerator
F Arranz, O Nomen, B Brañas, J Castellanos, J Molla, D Gutierrez
Fusion Engineering and Design 125, 123-126, 2017
82017
Manufacturing prototypes for LIPAC beam dump
F Arranz, B Brañas, D Iglesias, O Nomen, D Rapisarda, J Lapeña, ...
Fusion Engineering and Design 89 (9-10), 2199-2203, 2014
82014
IFMIF-EVEDA accelerator: Beam dump design
B Brañas, D Iglesias, F Arranz, J Gómez, C Oliver, G Barrera, A Ibarra
Proceeding EPAC, 2008
82008
Logistics and maintenance research activities for DONES facility
F Arranz, T Lehmann, F Rauscher, G Fischer, S Koehler, J Garrido, ...
Fusion Engineering and Design 192, 113630, 2023
72023
Design, manufacturing and tests of the LIPAc high energy beam transport line
B Brañas, J Castellanos, O Nomen, C Oliver, F Aragón, F Arranz, ...
Nuclear Fusion 61 (1), 015001, 2020
72020
Remote handling in the accelerator systems of DONES
F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ...
IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020
72020
The system can't perform the operation now. Try again later.
Articles 1–20