Follow
Zhihui Zhu
Zhihui Zhu
Other namesZhu Zhihui, Zhi-hui Zhu
Verified email at csu.edu.cn
Title
Cited by
Cited by
Year
Aerodynamic loads and traffic safety of high-speed trains when passing through two windproof facilities under crosswind: A comparative study
E Deng, W Yang, M Lei, Z Zhu, P Zhang
Engineering Structures 188, 320-339, 2019
732019
An efficient multi-time-step method for train-track-bridge interaction
Z Zhu, W Gong, L Wang, Q Li, Y Bai, Z Yu, IE Harik
Computers & Structures 196, 36-48, 2018
642018
Efficient assessment of 3D train-track-bridge interaction combining multi-time-step method and moving track technique
Z Zhu, W Gong, L Wang, Y Bai, Z Yu, L Zhang
Engineering Structures 183, 290-302, 2019
632019
Aerodynamic response of high-speed trains under crosswind in a bridge-tunnel section with or without a wind barrier
E Deng, W Yang, X He, Z Zhu, H Wang, Y Wang, A Wang, L Zhou
Journal of Wind Engineering and Industrial Aerodynamics 210, 104502, 2021
592021
An efficient approach for prediction of subway train-induced ground vibrations considering random track unevenness
Z Zhu, L Wang, PA Costa, Y Bai, Z Yu
Journal of Sound and Vibration 455, 359-379, 2019
582019
Transient aerodynamic performance of high-speed trains when passing through an infrastructure consisting of tunnel–bridge–tunnel under crosswind
E Deng, W Yang, X He, Y Ye, Z Zhu, A Wang
Tunnelling and Underground Space Technology 102, 103440, 2020
472020
A hybrid solution for studying vibrations of coupled train–track–bridge system
Z Zhu, W Gong, L Wang, IE Harik, Y Bai
Advances in Structural Engineering 20 (11), 1699-1711, 2017
462017
Running safety assessment of a train traversing a three-tower cable-stayed bridge under spatially varying ground motion
W Gong, Z Zhu, Y Liu, R Liu, Y Tang, L Jiang
Railway engineering science 28, 184-198, 2020
452020
Time-resolved aerodynamic loads on high-speed trains during running on a tunnel–bridge–tunnel infrastructure under crosswind
E Deng, W Yang, L Deng, Z Zhu, X He, A Wang
Engineering Applications of Computational Fluid Mechanics 14 (1), 202-221, 2020
442020
Transient aerodynamic performance of high-speed trains when passing through two windproof facilities under crosswinds: A comparative study
W Yang, E Deng, M Lei, Z Zhu, P Zhang
Engineering Structures 188, 729-744, 2019
392019
Properties of rubber under-ballast mat used as ballastless track isolation layer in high-speed railway
XW Sheng, WQ Zheng, ZH Zhu, TJ Luo, YH Zheng
Construction and Building Materials 240, 117822, 2020
382020
A hybrid DIC–EFG method for strain field characterization and stress intensity factor evaluation of a fatigue crack
Z Zhu, S Luo, Q Feng, Y Chen, F Wang, L Jiang
Measurement 154, 107498, 2020
342020
Non-stationary random vibration analysis of railway bridges under moving heavy-haul trains
Z Zhu, L Wang, Z Yu, W Gong, Y Bai
International Journal of Structural Stability and Dynamics 18 (03), 1850035, 2018
342018
Deterioration of dynamic response during high-speed train travelling in tunnel–bridge–tunnel scenario under crosswinds
W Yang, E Deng, Z Zhu, X He, Y Wang
Tunnelling and Underground Space Technology 106, 103627, 2020
312020
A fast random method for three-dimensional analysis of train-track-soil dynamic interaction
L Wang, Z Zhu, Y Bai, Q Li, PA Costa, Z Yu
Soil Dynamics and Earthquake Engineering 115, 252-262, 2018
282018
A real-time co-simulation solution for train–track–bridge interaction
W Gong, Z Zhu, K Wang, W Yang, Y Bai, J Ren
Journal of Vibration and Control 27 (13-14), 1606-1616, 2021
232021
Improved indirect measurement of the dynamic stiffness of a rail fastener and its dependence on load and frequency
Q Li, B Dai, Z Zhu, DJ Thompson
Construction and Building Materials 304, 124588, 2021
212021
Ganjiang Bridge: A high-speed railway long-span cable-stayed bridge laying ballastless tracks
X Sheng, W Zheng, Z Zhu, A Yan, Y Qin
Structural Engineering International 31 (1), 40-44, 2021
212021
Full-scale fatigue test of unit-plate ballastless track laid on long-span cable-stayed bridge
XW Sheng, WQ Zheng, ZH Zhu, YP Qin, JG Guo
Construction and Building Materials 247, 118601, 2020
192020
Construction of a dynamic model for the interaction between the versatile tracks and a vehicle
L Xu, L Xin, Z Yu, Z Zhu
Engineering Structures 206, 110067, 2020
182020
The system can't perform the operation now. Try again later.
Articles 1–20