Follow
Apaolaza, U (ORCID 0000-0003-3257-9291)
Apaolaza, U (ORCID 0000-0003-3257-9291)
Mondragon Unibertsitatea, Faculty of Engineering, Mechanics and Industrial Production
Verified email at mondragon.edu - Homepage
Title
Cited by
Cited by
Year
Material management without forecasting: From MRP to demand driven MRP
A Kortabarria, U Apaolaza, A Lizarralde, I Amorrortu
Journal of Industrial Engineering and Management 11 (4), 632-650, 2018
1012018
Close coupling value chain functions to improve subcontractor manufacturing performance
A Errasti, R Beach, C Oduoza, U Apaolaza
International journal of project management 27 (3), 261-269, 2009
472009
A strategic approach for bottleneck identification in make-to-order environments: A drum-buffer-rope action research based case study
A Lizarralde-Aiastui, U Apaolaza-Perez de Eulate, ...
Journal of Industrial Engineering and Management (JIEM) 13 (1), 18-37, 2020
302020
Theory of constraints case study in the make to order environment
A Orue, A Lizarralde, I Amorrortu, U Apaolaza
Journal of Industrial Engineering and Management 14 (1), 72-85, 2021
122021
Managing multiple projects in uncertain contexts: A case study on the application of a new approach based on the critical chain method
U Apaolaza, A Lizarralde
Sustainability 12 (15), 5999, 2020
102020
Demand Driven MRP-Nuevo método para la gestión de la Cadena de Suministro: un estudio de caso
A Kortabarria, U Apaolaza, A Lizarralde
Dirección y Organización, 22-29, 2019
102019
Modern project management approaches in uncertainty environments: A comparative study based on action research
U Apaolaza, A Lizarralde, A Oyarbide-Zubillaga
Sustainability 12 (24), 10542, 2020
62020
Perspectivas prácticas desde la industria para la identificación del cuello de botella en fábricas" make-to-order":¿ Una decisión estratégica u operativa?
AL Aiastui, UAP de Eulate, M Mediavilla
DYNA 94 (5), 507-511, 2019
52019
Competitive Improvement through Integrated Management of Sales and Operations
U Apaolaza, A Orue, A Lizarralde, A Oyarbide-Zubillaga
Sustainability 14 (5), 2722, 2022
42022
Investigación en el método de gestión de entornos multiproyecto" Cadena crítica"
U Apaolaza
Mondragon Unibertsitatea. Goi Eskola Politeknikoa, 2009
42009
Enfoque estratégico para la identificación de cuellos de botella en entornos de fabricación contra pedido y plantas tipo V: estudio de caso de DBR
A Lizarralde, U Apaolaza, M Mediavilla
Dirección y Organización, 46-51, 2019
32019
Comprehensive reorganization of project management: A case study
U Apaolaza, A Lizarralde
Project Management and Engineering Research: AEIPRO 2016, 3-17, 2017
32017
Designing the process of implementing step three of the theory of constraints in a make-to-order environment: Integrating sales and operation planning
A Orue, A Lizarralde, U Apaolaza, I Amorrortu
Journal of Industrial Engineering and Management 16 (2), 205-214, 2023
12023
Capacity buffer management in implementing drum-buffer-rope methodology in make-to-order environments
A Orue, A Lizarralde, U Apaolaza
Federación de Asociaciones de Ingenieros Industriales de España, 2022
12022
Aprendiendo Scrum: Una experiencia basada en POPBL
U Apaolaza, A Lizarralde, M Soto-Gordoa, A Kortabarria
AEIPRO, 2021
12021
The relationship between protective capacity and protective inventory in the implementation of the third step of the theory of constraints in make-to-stock environments: An …
A Orue, A Lizarralde, U Apaolaza, Á García
XXV Congreso de Ingeniería de Organización, 119, 2021
12021
The impact of protective capacity in implementing drum-buffer-rope methodology in make-to-order environments: an assessment by simulation
A ORUE, A Lizarralde, U Apaolaza
Publicaciones DYNA, 2022
2022
Competitive Improvement through Integrated Management of Sales and Operations. Sustainability 2022, 14, 2722
U Apaolaza, A Orue, A Lizarralde, A Oyarbide-Zubillaga
s Note: MDPI stays neutral with regard to jurisdictional claims in published …, 2022
2022
Aprendizaje de Scrum mediante PBL
U Apaolaza, M Soto-Gordoa, L Gorroño-Albizu
AEIPRO, 2022
2022
How to identify and exploit the bottleneck in make-to-order industries. A cross case study
A Lizarralde Aiastui, U Apaolaza, M Mediavilla
13th International Conference on Industrial Engineering and Industrial …, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–20