Follow
Nuh Bilgin
Nuh Bilgin
Verified email at itu.edu.tr - Homepage
Title
Cited by
Cited by
Year
Dominant rock properties affecting the performance of conical picks and the comparison of some experimental and theoretical results
N Bilgin, MA Demircin, H Copur, C Balci, H Tuncdemir, N Akcin
International Journal of Rock Mechanics and Mining Sciences 43 (1), 139-156, 2006
4202006
Dominant rock properties affecting the penetration rate of percussive drills
S Kahraman, N Bilgin, C Feridunoglu
International Journal of Rock Mechanics and Mining Sciences 40 (5), 711-723, 2003
3652003
Use of waste marble powder in brick industry
N Bilgin, HA Yeprem, S Arslan, A Bilgin, E Günay, M Marşoglu
Construction and Building Materials 29, 449-457, 2012
3052012
Mechanical excavation in mining and civil industries
N Bilgin, H Copur, C Balci
CRC press, 2013
2862013
A set of indices based on indentation tests for assessment of rock cutting performance and rock properties
C Copur, H., Bilgin, N., Tuncdemir, H. & Balci
Journal of the Southern African Institute of Mining and Metallurgy 103 (9 …, 2003
2102003
Correlative study of linear small and full-scale rock cutting tests to select mechanized excavation machines
C Balci, N Bilgin
International Journal of Rock Mechanics and Mining Sciences 44 (3), 468-476, 2007
2032007
Prediction of the penetration rate of rotary blast hole drills using a new drillability index
S Kahraman, C Balcı, S Yazıcı, N Bilgin
International Journal of Rock Mechanics and Mining Sciences 37 (5), 729-743, 2000
1962000
Control of rock cutting efficiency by muck size
H Tuncdemir, N Bilgin, H Copur, C Balci
International Journal of Rock Mechanics and Mining Sciences 45 (2), 278-288, 2008
1632008
Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects
U Ates, N Bilgin, H Copur
Tunnelling and Underground Space Technology 40, 46-63, 2014
1302014
Specific energy as a criterion for the use of rapid excavation systems in Turkish mines
H Çopur, H Tunçdemir, N Bilgin, T Dincer
Mining Technology 110 (3), 149-157, 2001
1292001
A model to predict the performance of roadheaders and impact hammers in tunnel drivages
N Bilgin, S Yazici, S Eskikaya
ISRM EUROCK, ISRM-EUROCK-1996-089, 1996
1181996
Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions
N Bilgin, H Copur, C Balci
Tunnelling and underground space technology 27 (1), 41-51, 2012
1082012
Comparative studies on the performance of a roadheader, impact hammer and drilling and blasting method in the excavation of metro station tunnels in Istanbul
I Ocak, N Bilgin
Tunnelling and Underground Space Technology 25 (2), 181-187, 2010
1032010
Estimation of rock cuttability from shore hardness and compressive strength properties
D Tumac, N Bilgin, C Feridunoglu, H Ergin
Rock Mechanics and Rock Engineering 40, 477-490, 2007
962007
The performance prediction of impact hammers from Schmidt hammer rebound values in Istanbul metro tunnel drivages
N Bilgin, T Dincer, H Copur
Tunnelling and Underground Space Technology 17 (3), 237-247, 2002
962002
Some geological and geotechnical factors affecting the performance of a roadheader in an inclined tunnel
N Bilgin, T Dincer, H Copur, M Erdogan
Tunnelling and Underground Space Technology 19 (6), 629-636, 2004
952004
Predicting performance of EPB TBMs by using a stochastic model implemented into a deterministic model
H Copur, H Aydin, N Bilgin, C Balci, D Tumac, C Dayanc
Tunnelling and Underground Space Technology 42, 1-14, 2014
922014
Investigations into the mechanical cutting characteristics of some medium and high strength rocks
N Bilgin
Newcastle University, 1977
891977
Roadheaders glean valuable tips for Istanbul Metro
N Bilgin, T Seyrek, E Erding, K Shahriar
Tunnels & Tunnelling International 22 (10), 1990
841990
Effects of different cutting patterns and experimental conditions on the performance of a conical drag tool
H Copur, N Bilgin, C Balci, D Tumac, E Avunduk
Rock Mechanics and Rock Engineering 50, 1585-1609, 2017
772017
The system can't perform the operation now. Try again later.
Articles 1–20