A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs H Haddad, P Ghanbari, A Moghaddam International Journal of Industrial Engineering Computations 3 (2), 253-264, 2012 | 12 | 2012 |
Solving a single machine stochastic scheduling problem using a branch and bound algorithm and simulated annealing MM Mazdeh, H Haddadm, P Ghanbari International Journal of Management Science and Engineering Management 7 (2 …, 2012 | 5 | 2012 |
A simulated annealing for the single machine batch scheduling with deterioration and precedence constraints M Karimi-Nasab, H Haddad, P Ghanbari Asian Journal of Industrial Engineering 4, 1-16, 2012 | 2 | 2012 |
Two hybrid algorithms for single-machine total weighted tardiness scheduling problem with sequence-dependent setup H Feili, H Haddad, P Ghanbari American Journal of Scientific Research, 22-29, 2012 | 2 | 2012 |
Two Hybrid Algorithms for Solving the Multi Objective Batch Scheduling Problem on a Single Machine Based on Simulated Annealing and Clustering Methods H Haddad, P Ghanbari International Journal 1 (1), 2012 | | 2012 |
A Simulated Annealing for the Single Machine Batch Scheduling with M Karimi-Nasab, H Haddad, P Ghanbari | | |
A simulated annealing for the Single machine batch scheduling with deterioration and precedence constraints H Haddad, P Ghanbari | | |