A branch-and-bound approach to minimise the value-at-risk of the makespan in a stochastic two-machine flow shop L Liu, M Urgo International Journal of Production Research 62 (6), 2107-2123, 2024 | 4 | 2024 |
A robust scheduling framework for re-manufacturing activities of turbine blades L Liu, M Urgo Applied Sciences 12 (6), 3034, 2022 | 4 | 2022 |
Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity … L Liu, M Urgo Annals of Operations Research, 1-24, 2023 | 1 | 2023 |
A branch and bound approach for stochastic 2-machine flow shop scheduling with rework L Liu, M Urgo 18th International Workshop on Project Management and Scheduling (PMS2022), 2022 | 1 | 2022 |
Scheduling remanufacturing activities for the repair of turbine blades: an approximate branch and bound approach to minimize a risk measure L Liu, M Urgo Selected Topics in Manufacturing, 2021 | 1 | 2021 |
Robust scheduling of remanufacturing processes for the repair of turbine blades L Liu, M Urgo CIRP Annals 72 (1), 425-428, 2023 | | 2023 |
A branch-and-bound approach for the two-machine flow shop stochastic scheduling problem to minimize the value-at-risk L Liu, M Urgo 31st European conference on operational research, 157-157, 2021 | | 2021 |