Follow
Moshe Kaspi
Moshe Kaspi
professor of Industrial Engineering, Ben Gurion University
Verified email at bgu.ac.il
Title
Cited by
Cited by
Year
A survey on offline scheduling with rejection
D Shabtay, N Gaspar, M Kaspi
Journal of scheduling 16, 3-28, 2013
2272013
Optimal flow path design of unidirectional AGV systems
M Kaspi, JMA Tanchoco
The International Journal of Production Research 28 (6), 1023-1030, 1990
2211990
Optimal flow path design of unidirectional AGV systems
M Kaspi, JMA Tanchoco
The International Journal of Production Research 28 (6), 1023-1030, 1990
2211990
On the economic ordering quantity for jointly replenished items
M Kaspi, MJ Rosenblatt
The International Journal of Production Research 29 (1), 107-114, 1991
1721991
An improvement of Silver's algorithm for the joint replenishment problem
M Kaspi, MJ Rosenblatt
AIIE Transactions 15 (3), 264-267, 1983
1521983
Minimizing the total weighted flow time in a single machine with controllable processing times
D Shabtay, M Kaspi
Computers & Operations Research 31 (13), 2279-2289, 2004
1022004
Parallel machine scheduling with a convex resource consumption function
D Shabtay, M Kaspi
European Journal of Operational Research 173 (1), 92-107, 2006
832006
Optimal solution for the flow path design problem of a balanced unidirectional AGV system
M Kaspi, U Kesselman, JMA Tanchoco
International Journal of Production Research 40 (2), 389-401, 2002
642002
The effectiveness of heuristic algorithms for multi-item inventory systems with joint replenishment costs
M Kaspi, MJ Rosenblatt
International Journal of Production Research 23 (1), 109-116, 1985
561985
Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity
Y Perlman, A Mehrez, M Kaspi
Journal of the Operational Research Society 52, 198-209, 2001
532001
Location and sequencing of imperfect inspection operations in serial multi-stage production systems
T Raz, M Kaspi
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 29 (8), 1645-1659, 1991
531991
Convex resource allocation for minimizing the makespan in a single machine with job release dates
M Kaspi, D Shabtay
Computers & Operations Research 31 (9), 1481-1489, 2004
442004
A bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release dates
M Kaspi, D Shabtay
Computers & Operations Research 33 (10), 3015-3033, 2006
422006
The no-wait two-machine flow shop scheduling problem with convex resource-dependent processing times
D Shabtay, M Kaspi, G Steiner
Iie Transactions 39 (5), 539-557, 2007
382007
Optimization of the machining economics problem for a multistage transfer machine under failure, opportunistic and integrated replacement strategies
M Kaspi, D Shabtay
International journal of production research 41 (10), 2229-2247, 2003
362003
A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system
D Shabtay, Y Bensoussan, M Kaspi
International Journal of Production Economics 136 (1), 67-74, 2012
312012
On the Scheduling of Identical Parallel Processes with Arbitrary Initial Precessor Available Times
M Kaspi, B Montreuil
School of Industrial Engineering, Purdue University, 1988
301988
Note—A Dynamic Programming Algorithm for Joint Replenishment Under General Order Cost Functions
MJ Rosenblatt, M Kaspi
Management Science 31 (3), 369-373, 1985
301985
Optimization of the machining economics problem under the failure replacement strategy
D Shabtay, M Kaspi
International Journal of Production Economics 80 (3), 213-230, 2002
282002
A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine
L Yedidsion, D Shabtay, M Kaspi
Journal of Scheduling 10, 341-352, 2007
262007
The system can't perform the operation now. Try again later.
Articles 1–20