Follow
Mehdi Karimi-Nasab
Title
Cited by
Cited by
Year
Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach
M Karimi-Nasab, SM Seyedhoseini
European Journal of Operational Research 231 (3), 598-616, 2013
582013
A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times
M Karimi-Nasab, M Modarres, SM Seyedhoseini
Applied Soft Computing 27, 137-147, 2015
532015
An inventory control model with stochastic review interval and special sale offer
M Karimi-Nasab, I Konstantaras
European Journal of Operational Research 227 (1), 81-87, 2013
392013
Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection
M Karimi-Nasab, K Sabri-Laghaie
International Journal of Production Research 52 (8), 2388-2421, 2014
362014
A random search heuristic for a multi-objective production planning
M Karimi-Nasab, I Konstantaras
Computers & Industrial Engineering 62 (2), 479-490, 2012
332012
Lot sizing and job shop scheduling with compressible process times: A cut and branch approach
M Karimi-Nasab, M Modarres
Computers & Industrial Engineering 85, 196-205, 2015
302015
Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items
M Karimi-Nasab, SMT Fatemi Ghomi
International Journal of Production Research 50 (24), 7378-7400, 2012
302012
An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations
O Kheirandish, R Tavakkoli-Moghaddam, M Karimi-Nasab
International Journal of Computer Integrated Manufacturing 28 (5), 437-450, 2015
292015
A multi-objective production smoothing model with compressible operating times
M Karimi-Nasab, MB Aryanezhad
Applied Mathematical Modelling 35 (7), 3596-3610, 2011
292011
A group decision-making approach for supplier selection in configuration design: A case study
S Dowlatshahi, M Karimi-Nasab, H Bahrololum
The International Journal of Advanced Manufacturing Technology 81 (5), 1139–1154, 2015
222015
Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures
M Karimi-Nasab, SM Seyedhoseini, M Modarres, M Heidari
International Journal of Production Research 51 (20), 6229-6246, 2013
162013
An inventory model with truncated exponential replenishment intervals and special sale offer
M Karimi-Nasab, HM Wee
Journal of Manufacturing Systems 35, 246-250, 2015
152015
Multi-objective optimisation for pricing and distribution in a supply chain with stochastic demands
M Karimi-Nasab, D Shishebori, SGR Jalali-Naini
International Journal of Industrial and Systems Engineering 13 (1), 56-72, 2013
152013
An economic production quantity model with random yield subject to process compressibility
E Noorollahi, M Karimi-Nasab, MB Aryanezhad
Mathematical and Computer Modelling 56 (3-4), 80-96, 2012
152012
A Multiobjective Distribution-Pricing Model for Multiperiod Price-Sensitive Demands
M Karimi-Nasab, S Dowlatshahi, H Heidari
IEEE Transactions on Engineering Management 60 (3), 640-654, 2013
132013
A two-phase heuristic algorithm for designing reliable capacitated logistics networks under disruptions
D Shishebori, M Karimi-Nasab, LV Snyder
European Journal of Industrial Engineering 11 (4), 425-468, 2017
122017
Random search algorithms for redundancy allocation problem of a queuing system with maintenance considerations
K Sabri-Laghaie, M Karimi-Nasab
Reliability Engineering & System Safety 185, 144-162, 2019
112019
A fuzzy random multi-objective approach for portfolio selection
MB Aryanezhad, H Malekly, M Karimi-Nasab
JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL 7 (13), 12-21, 2011
92011
Multiple batch sizing through batch size smoothing
MB Aryanezhad, M Karimi-Nasab, S Bakhshi
JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL …, 2009
52009
A multi-objective approach for production smoothing problem
MB Aryanezhad, M Karimi-Nasab
PROCEEDINGS OF INTERNATIONAL CONFERENCE OF IRANIAN OPERATIONS RESEARCH SOCIETY, 2009
42009
The system can't perform the operation now. Try again later.
Articles 1–20