Follow
Professor Datin Sr.Dr. Hamimah Adnan
Professor Datin Sr.Dr. Hamimah Adnan
Quantity Surveying Department, FSPU, UiTM Malaysia
Verified email at uitm.edu.my
Title
Cited by
Cited by
Year
Analysis of effectiveness measures of construction project success in Malaysia
R Takim, H Adnan
Asian Social Science 4 (7), 74-91, 2008
2182008
Ethical issues in the construction industry: Contractor's perspective
H Adnan, N Hashim, N Mohd, N Ahmad
Procedia-social and behavioral sciences 35, 719-727, 2012
1282012
A study of construction claim management problems in Malaysia
NA Bakhary, H Adnan, A Ibrahim
Procedia economics and finance 23, 63-70, 2015
1222015
Obstacles in implementing green building projects in Malaysia
MR Bin Esa, MA Marhani, R Yaman, A Noor, HA Rashid
Australian Journal of Basic and Applied Sciences 5 (12), 1806-1812, 2011
1132011
Clients' perspectives of risk management practice in Malaysian construction industry
NM Yusuwan, H Adnan, AF Omar, J Kamaruzaman
J. Pol. & L. 1, 121, 2008
872008
Facility management challenges and opportunities in the Malaysian property sector
SAH bin Syed Mustapa, H Adnan, K Jusoff
Journal of Sustainable Development 1 (2), P79, 2008
812008
Application of Delphi method on critical success factors in joint venture projects in the Malaysian construction industry
H Adnan, R Morledge
1st Scottish Conference for Postgraduate Researchers of the Built and …, 2003
652003
Management of safety for quality construction
HN Husin, H Adnan, K Jusoff
Journal of Sustainable Development 1 (3), 41-47, 2008
602008
An assessment of risk management in joint venture projects (JV) in Malaysia
H Adnan
Asian Social Science 4 (6), 99-106, 2008
572008
Dependency of foreign workers in Malaysian construction industry
MA Marhani, H Adnan, HE Baharuddin, MR Esa, AA Hassan
Built Environment Journal (BEJ) 9 (1), 39-50, 2012
542012
Issues associated with extension of time (EoT) claim in Malaysian construction industry
NM Yusuwan, H Adnan
Procedia Technology 9, 740-749, 2013
532013
Conflict prevention in partnering projects
H Adnan, SM Shamsuddin, A Supardi, N Ahmad
Procedia-Social and Behavioral Sciences 35, 772-781, 2012
512012
Joint venture projects in Malaysian construction industry: factors critical to success
H Adnan
PQDT-Global, 2004
472004
The Malaysian construction industry’s risk management in design and build
H Adnan, K Jusoff, MK Salim
Modern Applied Science 2 (5), 27-33, 2008
432008
Maintenance management for public infrastructure for Malaysian local authorities
H Adnan, ZFM Fauzi, I Rahmat, A Supardi
ARPN Journal of Engineering and Applied Sciences 7 (11), 1514-1522, 2012
312012
Factors affecting housing prices in Malaysia: Analysis of the supply side
AL Olanrewaju, XY Lim, SY Tan, JE Lee, H Adnan
Planning Malaysia 16, 2018
272018
Critical success factors for contractors
H Adnan, NM Yusuwan, F Yusuf, F Bachik
International Journal of Engineering and Technical Research 2 (2), 107-113, 2014
272014
OHSAS 18001: A pilot study of towards sustainable construction in Malaysia
MA Marhani, H Adnan, F Ismail
Procedia-Social and Behavioral Sciences 85, 51-60, 2013
272013
Success factors of design and build projects in public universities
H Adnan, F Bachik, A Supardi, MA Marhani
Procedia-Social and Behavioral Sciences 35, 170-179, 2012
272012
Conflict, complexity, and uncertainty in building refurbishment projects
A Noori, M Saruwono, H Adnan, I Rahmat
InCIEC 2015: Proceedings of the International Civil and Infrastructure …, 2016
252016
The system can't perform the operation now. Try again later.
Articles 1–20