Studying the stress redistribution around the longwall mining panel using passive seismic velocity tomography and geostatistical estimation N Hosseini, K Oraee, K Shahriar, K Goshtasbi Arabian Journal of Geosciences 6, 1407-1416, 2013 | 83 | 2013 |
Evaluation of the rockburst potential in longwall coal mining using passive seismic velocity tomography and image subtraction technique N Hosseini Journal of Seismology 21 (5), 1101-1110, 2017 | 48 | 2017 |
Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconstructive technique (SIRT) N Hosseini, K Oraee, K Shahriar, K Goshtasbi Journal of Central South University 19, 2297-2306, 2012 | 44 | 2012 |
Load-deflection and surface properties of coated and conventional superelastic orthodontic archwires in conventional and metal-insert ceramic brackets S Alavi, N Hosseini Dental research journal 9 (2), 133, 2012 | 39 | 2012 |
Calculation of periodic roof weighting interval in longwall mining using finite element method N Hosseini, K Goshtasbi, B Oraee-Mirzamani, M Gholinejad Arabian Journal of Geosciences 7, 1951-1956, 2014 | 37 | 2014 |
Prediction of the penetration rate of TBM using adaptive neuro fuzzy inference system (ANFIS) K Oraee, MT Khorami, N Hosseini Proceeding of SME annual meeting and exhibit, 297-302, 2012 | 28 | 2012 |
Passive seismic velocity tomography and geostatistical simulation on longwall mining panel N Hosseini, K Oraee, K Shahriar, K Goshtasbi Archives of mining sciences 57 (1), 139--155, 2012 | 25 | 2012 |
Seismic analysis of horseshoe tunnels under dynamic loads due to earthquakes K Oraee, N Hosseini, M Gholinejad 10th Underground Coal Operators' Conference 2010, 140-145, 2010 | 19* | 2010 |
Modeling fluid flow in fractured porous media with the interfacial conditions between porous medium and fracture N Hosseini, AR Khoei Transport in Porous Media 139, 109-129, 2021 | 14 | 2021 |
A new approach for determination of tunnel supporting system using analytical hierarchy process (AHP) K Oraee, N Hosseini, M Gholinejad 9th Underground Coal Operators' Conference (Coal 2009: Coal Operators …, 2009 | 14 | 2009 |
Estimation of coal pillar strength by finite difference model K Oraee, N Hosseini, M Gholinejad | 12 | 2009 |
Investigating the slope stability based on uncertainty by using fuzzy possibility theory N Hosseini, M Gholinejad Archives of Mining Sciences 59 (1), 179-188, 2014 | 11 | 2014 |
Coal pillar strength based on the ground reaction curve–a new approach K Oraee, N Hosseini, M Gholinejad 28th International Conference on Ground Control in Mining (ICGCM), 2009 | 11 | 2009 |
Fuzzy evaluation method for the identification of subsidence susceptibility in an underground mine (case study in Tabas coal mine of Iran) N Hosseini Alaee, A Mozafari, M Mirzaee, A Faghihi, K Tolouei Natural Hazards 99, 797-806, 2019 | 10 | 2019 |
Modelling of pillars in longwall method using advanced numerical techniques N Hosseini M. Sc. Thesis, Islamic Azad University, South of Tehran branch, 2007 | 9 | 2007 |
3D strain softening modelling of coal pillars in a deep longwall mine K Oraee, N Hosseini, M Gholinejad Seventeenth international symposium on mine planning and equipment section …, 2008 | 7 | 2008 |
A field investigation of application of digital terrestrial photogrammetry to characterize geometric properties of discontinuities in open-pit slopes MM Samieinejad, N Hosseini, K Ahangari Journal of Mining and Environment 8 (3), 455-465, 2017 | 6 | 2017 |
Selection of tunnel support system by using multi criteria decision-making tools N Hosseini, K Oraee, M Gholinejad 29th International Conference on Ground Control in Mining, 1-9, 2010 | 6 | 2010 |
An approach based on Fuzzy Best-Worst method for sustainable evaluation of mining industries M PEzESHkAN, N Hosseini gospodarka surowcami mineralnymi 36 (2), 41-70, 2020 | 3 | 2020 |
Logical design of yield pillar base in longwall mining K Oraee, N Hosseini, M Gholinejad Seventeenth international symposium on mine planning and equipment selection …, 2008 | 2 | 2008 |