دنبال کردن
Navid Hosseini
Navid Hosseini
IAU, South Tehran Branch, Rock Mechanics Department
ایمیل تأیید شده در azad.ac.ir - صفحهٔ اصلی
عنوان
نقل شده توسط
نقل شده توسط
سال
Studying the stress redistribution around the longwall mining panel using passive seismic velocity tomography and geostatistical estimation
N Hosseini, K Oraee, K Shahriar, K Goshtasbi
Arabian Journal of Geosciences 6, 1407-1416, 2013
832013
Evaluation of the rockburst potential in longwall coal mining using passive seismic velocity tomography and image subtraction technique
N Hosseini
Journal of Seismology 21 (5), 1101-1110, 2017
482017
Passive seismic velocity tomography on longwall mining panel based on simultaneous iterative reconstructive technique (SIRT)
N Hosseini, K Oraee, K Shahriar, K Goshtasbi
Journal of Central South University 19, 2297-2306, 2012
442012
Load-deflection and surface properties of coated and conventional superelastic orthodontic archwires in conventional and metal-insert ceramic brackets
S Alavi, N Hosseini
Dental research journal 9 (2), 133, 2012
392012
Calculation of periodic roof weighting interval in longwall mining using finite element method
N Hosseini, K Goshtasbi, B Oraee-Mirzamani, M Gholinejad
Arabian Journal of Geosciences 7, 1951-1956, 2014
372014
Prediction of the penetration rate of TBM using adaptive neuro fuzzy inference system (ANFIS)
K Oraee, MT Khorami, N Hosseini
Proceeding of SME annual meeting and exhibit, 297-302, 2012
282012
Passive seismic velocity tomography and geostatistical simulation on longwall mining panel
N Hosseini, K Oraee, K Shahriar, K Goshtasbi
Archives of mining sciences 57 (1), 139--155, 2012
252012
Seismic analysis of horseshoe tunnels under dynamic loads due to earthquakes
K Oraee, N Hosseini, M Gholinejad
10th Underground Coal Operators' Conference 2010, 140-145, 2010
19*2010
Modeling fluid flow in fractured porous media with the interfacial conditions between porous medium and fracture
N Hosseini, AR Khoei
Transport in Porous Media 139, 109-129, 2021
142021
A new approach for determination of tunnel supporting system using analytical hierarchy process (AHP)
K Oraee, N Hosseini, M Gholinejad
9th Underground Coal Operators' Conference (Coal 2009: Coal Operators …, 2009
142009
Estimation of coal pillar strength by finite difference model
K Oraee, N Hosseini, M Gholinejad
122009
Investigating the slope stability based on uncertainty by using fuzzy possibility theory
N Hosseini, M Gholinejad
Archives of Mining Sciences 59 (1), 179-188, 2014
112014
Coal pillar strength based on the ground reaction curve–a new approach
K Oraee, N Hosseini, M Gholinejad
28th International Conference on Ground Control in Mining (ICGCM), 2009
112009
Fuzzy evaluation method for the identification of subsidence susceptibility in an underground mine (case study in Tabas coal mine of Iran)
N Hosseini Alaee, A Mozafari, M Mirzaee, A Faghihi, K Tolouei
Natural Hazards 99, 797-806, 2019
102019
Modelling of pillars in longwall method using advanced numerical techniques
N Hosseini
M. Sc. Thesis, Islamic Azad University, South of Tehran branch, 2007
92007
3D strain softening modelling of coal pillars in a deep longwall mine
K Oraee, N Hosseini, M Gholinejad
Seventeenth international symposium on mine planning and equipment section …, 2008
72008
A field investigation of application of digital terrestrial photogrammetry to characterize geometric properties of discontinuities in open-pit slopes
MM Samieinejad, N Hosseini, K Ahangari
Journal of Mining and Environment 8 (3), 455-465, 2017
62017
Selection of tunnel support system by using multi criteria decision-making tools
N Hosseini, K Oraee, M Gholinejad
29th International Conference on Ground Control in Mining, 1-9, 2010
62010
An approach based on Fuzzy Best-Worst method for sustainable evaluation of mining industries
M PEzESHkAN, N Hosseini
gospodarka surowcami mineralnymi 36 (2), 41-70, 2020
32020
Logical design of yield pillar base in longwall mining
K Oraee, N Hosseini, M Gholinejad
Seventeenth international symposium on mine planning and equipment selection …, 2008
22008
سیستم در حال حاضر قادر به انجام عملکرد نیست. بعداً دوباره امتحان کنید.
مقاله‌ها 1–20