Follow
Milad Hematian
Title
Cited by
Cited by
Year
Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
EB Tirkolaee, A Goli, M Hematian, AK Sangaiah, T Han
Computing 101, 547-570, 2019
1292019
A fuzzy multi-objective optimization model for sustainable closed-loop supply chain network design in food industries
M Alinezhad, I Mahdavi, M Hematian, EB Tirkolaee
Environment, Development and Sustainability, 1-28, 2022
652022
Development of a non-dominated sorting genetic algorithm for implementing circular economy strategies in the concrete industry
M NoParast, M Hematian, A Ashrafian, MJT Amiri, H AzariJafari
Sustainable Production and Consumption 27, 933-946, 2021
342021
Robust scheduling of parallel machines considering total flow time
S. Alimoradi, M. Hematian, G. Moslehi
Computers & Industrial Engineering 93, 152-161, 2016
292016
Green supply chain flow analysis with multi-attribute demand in a multi-period product development environment
S Porkar, I Mahdavi, B Maleki Vishkaei, M Hematian
Operational Research 20, 1405-1435, 2020
282020
A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty
M Hematian, MMS Esfahani, I Mahdavi, N Mahdavi‐Amiri, J Rezaeian
Computational Intelligence, 2019
202019
Optimization of time and costs in critical chain method using genetic algorithm
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi
Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017
92017
Optimal allocation of repairs and maintenance of bridges in Mazandaran province in conditions of budget constraint using genetic algorithm
MJ Taheri Amiri, F Haghighi, A Rahmani Firoozjaee, M Hematian, ...
Journal of Transportation Engineering 10 (2), 199-211, 2018
62018
Prioritizing delay causes in construction projects in mazandaran province (Iran) and presenting solutions for improving it
H Nazarpour, MJ Taheri Amiri, M Hemmatian
Applied Mathematics in Engineering, Management And Technology 2 (4), 242-253, 2014
62014
Choosing an appropriate factorial system through the modern and outmoded system by two approaches ANP & AHP-FUZZY
G Abdollahzadeh, MJT Amiri, EA Kaffash, M Hemmatian, S Keihanfard
Journal of Mathematics and Computer Science 6 (2), 110-117, 2013
62013
Optimization of time and cost in critical chain project scheduling problem using genetic algorithm
MJT Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi
Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017
52017
A multi-objective optimization model for multiple project scheduling and multi-skill human resource assignment problem based on learning and forgetting effect and activities …
M Hematian, M Seyyedesfahani, I Mahdavi, N Mahdavi Amiri, J Rezaeian
Journal of Industrial Engineering and Management Studies 7 (2), 98-118, 2020
42020
Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hemmatian, ...
Journal of Structural and Construction Engineering 7 (Special Issue 3), 87-108, 2020
32020
Site layout optimization and its impact on the cost of construction projects
MJ Taheri Amiri, M Hematian, F Haghighi, M Javaheri Barforooshi
Amirkabir Journal of Civil Engineering 53 (2), 495-514, 2021
22021
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem
M Hemmatian, MJ Taheri Amiri, O Ghenaat
Journal of Structural and Construction Engineering 6 (3), 41-56, 2019
22019
Prioritize and Optimal Selection of Projects with Best to Worth method, VIKOR and Mathematical Programming
MJ Taheri Amiri, M Hemmatian, A Asghari
Journal of Structural and Construction Engineering 8 (Special Issue 2), 171-193, 2021
12021
Mazandaran Bridge Maintenance Optimization under Budget Constraint by Genetic Algorithm
MJ Taheri Amiri, F Haghighi, A Rahmani Firoozjaee, M Hematian, ...
Quarterly Journal of Transportation Engineering 10 (2), 199-211, 2018
12018
A robust optimization model for dynamic virtual hub location problem under uncertainty using an M/M/C/K queuing model: two metaheuristic algorithms
S Shiripour, M Hematian, N Mahdavi-Amiri
Operational Research 23 (3), 40, 2023
2023
Optimizing the life cycle cost of bridges by considering the reliability of bridges (Case study of bridges from Sari to Mahmudabad)
MJ Taheri Amiri, M Hematian, S Roshanghalb
Amirkabir Journal of Civil Engineering 54 (10), 3723-3742, 2022
2022
Selection the Optimal Methods for Pavement Maintenance Northern According to the Type of Damage and Remedial Action for their
MJ Taheri Amiri, M Hematian, F Haghighi, M Rezaeyan
Journal of Transportation Research 19 (4), 147-162, 2022
2022
The system can't perform the operation now. Try again later.
Articles 1–20