The Best Estimate Plus Uncertainty (BEPU) approach in licensing of current nuclear reactors
F D’Auria, C Camargo, O Mazzantini
Nuclear Engineering and Design 248, 317-328, 2012
1162012
Parameterization of high solar share gas turbine systems
S Heide, C Felsmann, U Gampe, S Boje, B Gericke, M Freimark, ...
Turbo Expo: Power for Land, Sea, and Air 44724, 281-289, 2012
25*2012
Robust LBB analyses for atucha II nuclear plant
G Wilkowski, B Brust, T Zhang, G Hattery, S Kalyanam, DJ Shim, E Kurth, ...
Pressure Vessels and Piping Conference 44519, 107-120, 2011
232011
Station black-out analysis with melcor 1.8. 6 code for atucha 2 nuclear power plant
A Bonelli, O Mazzantini, M Sonnenkalb, M Caputo, JM García, P Zanocco, ...
Science and Technology of Nuclear Installations 2012, 2012
202012
DEGB LBLOCA (2 X 100 Break in CL) in Atucha-2 NPP
FS D'Auria, O Mazzantini, M Cherubini, W Giannotti, C Parisi, F Moretti, ...
University of Pisa DIMNP, 2008
172008
A coupled calculation suite for Atucha II operational transients analysis
O Mazzantini, M Schivo, J Di Césare, R Garbero, M Rivero, G Theler
Science and Technology of Nuclear Installations 2011, 2010
162010
The BEPU Evaluation Model with RELAP5-3D for the Licensing of the Atucha-II NPP
A Petruzzi, M Cherubini, M Lanfredini, F D’Auria, O Mazzantini
Nuclear Technology 193 (1), 113-160, 2016
152016
Application of MCNP for predicting power excursion during LOCA in Atucha-2 PHWR
M Pecchia, C Parisi, F D’Auria, O Mazzantini
Annals of Nuclear Energy 85, 271-278, 2015
132015
The best-estimate plus uncertainty (BEPU) challenge in the licensing of current generation of reactors
F D’Auria, O Mazzantini
IAEA Int. Conf. on Opportunities and Challenges for Water Cooled Reactors in …, 2009
132009
Reprint of “The role of nuclear thermal-hydraulics in the licensing of Atucha-II: The LBLOCA”
O Mazzantini, G Galassi, F D'Auria
Nuclear Engineering and Design 354, 110292, 2019
122019
The simulation of I & C in accident analyses of nuclear power plants
F D’Auria, C Camargo, N Muellner, M Lanfredini, O Mazzantini
Nuclear Engineering and Design 250, 656-663, 2012
112012
A procedure to address the fuel rod failures during LB-LOCA transient in Atucha-2 NPP
M Adorni, A Del Nevo, F D'Auria, O Mazzantini
Science and Technology of Nuclear Installations 2011, 2011
92011
The best estimate plus uncertainty challenge in the current licensing process of present reactors
F D'Auria, O Mazzantini
Science and Technology of Nuclear Installations 2011, 2011
92011
RELAP/SCDAPSIM/MOD3. 6–Development of Severe Accident Models for Heavy Water Reactors Including CANDU and ATUCHA-2
A Bonelli, O Mazzantini, D Dupleac, E Dinca, LJ Siefken, CM Allison, ...
Proc. ICAPP, 03-06, 2015
82015
Prediction of Margins in the TBS Seismic Considerations Analysis for Circumferential Surface-Cracked Piping Under Beyond Design Basis Seismic Loading
M Uddin, F Brust, G Wilkowski, T Zhang, AA Betervide, O Mazzantini, ...
Pressure Vessels and Piping Conference 46070, V008T08A025, 2014
82014
Welding residual stress in a large diameter nuclear reactor pressure vessel nozzle
T Zhang, FW Brust, G Wilkowski, H Xu, AA Betervide, O Mazzantini
Journal of Pressure Vessel Technology 135 (2), 021208, 2013
72013
Instrumenting full-scale Boron Injection Test Facility to support Atucha-2 NPP licensing
F Moretti, F Terzuoli, F D'Auria, O Mazzantini
Nuclear Engineering and Design 336, 154-162, 2018
62018
Beyond design basis seismic analysis for atucha II nuclear plant
T Zhang, FW Brust, G Wilkowski, H Xu, AA Betervide, O Mazzantini
International Conference on Nuclear Engineering 44991, 625-634, 2012
62012
LBB Under Beyond Design Basis Seismic Loading
T Zhang, FW Brust, G Wilkowski, H Xu, AA Betervide, O Mazzantini
Pressure Vessels and Piping Conference 55072, 55-64, 2012
62012
Development and application of MCNP5 and KENO-VI Monte Carlo models for the Atucha-2 PHWR analysis
M Pecchia, C Parisi, F D'Auria, O Mazzantini
Science and Technology of Nuclear Installations 2011, 2011