The Best Estimate Plus Uncertainty (BEPU) approach in licensing of current nuclear reactors F D’Auria, C Camargo, O Mazzantini Nuclear Engineering and Design 248, 317-328, 2012 | 116 | 2012 |
Parameterization of high solar share gas turbine systems S Heide, C Felsmann, U Gampe, S Boje, B Gericke, M Freimark, ... Turbo Expo: Power for Land, Sea, and Air 44724, 281-289, 2012 | 25* | 2012 |
Robust LBB analyses for atucha II nuclear plant G Wilkowski, B Brust, T Zhang, G Hattery, S Kalyanam, DJ Shim, E Kurth, ... Pressure Vessels and Piping Conference 44519, 107-120, 2011 | 23 | 2011 |
Station black-out analysis with melcor 1.8. 6 code for atucha 2 nuclear power plant A Bonelli, O Mazzantini, M Sonnenkalb, M Caputo, JM García, P Zanocco, ... Science and Technology of Nuclear Installations 2012, 2012 | 20 | 2012 |
DEGB LBLOCA (2 X 100 Break in CL) in Atucha-2 NPP FS D'Auria, O Mazzantini, M Cherubini, W Giannotti, C Parisi, F Moretti, ... University of Pisa DIMNP, 2008 | 17 | 2008 |
A coupled calculation suite for Atucha II operational transients analysis O Mazzantini, M Schivo, J Di Césare, R Garbero, M Rivero, G Theler Science and Technology of Nuclear Installations 2011, 2010 | 16 | 2010 |
The BEPU Evaluation Model with RELAP5-3D for the Licensing of the Atucha-II NPP A Petruzzi, M Cherubini, M Lanfredini, F D’Auria, O Mazzantini Nuclear Technology 193 (1), 113-160, 2016 | 15 | 2016 |
Application of MCNP for predicting power excursion during LOCA in Atucha-2 PHWR M Pecchia, C Parisi, F D’Auria, O Mazzantini Annals of Nuclear Energy 85, 271-278, 2015 | 13 | 2015 |
The best-estimate plus uncertainty (BEPU) challenge in the licensing of current generation of reactors F D’Auria, O Mazzantini IAEA Int. Conf. on Opportunities and Challenges for Water Cooled Reactors in …, 2009 | 13 | 2009 |
Reprint of “The role of nuclear thermal-hydraulics in the licensing of Atucha-II: The LBLOCA” O Mazzantini, G Galassi, F D'Auria Nuclear Engineering and Design 354, 110292, 2019 | 12 | 2019 |
The simulation of I & C in accident analyses of nuclear power plants F D’Auria, C Camargo, N Muellner, M Lanfredini, O Mazzantini Nuclear Engineering and Design 250, 656-663, 2012 | 11 | 2012 |
A procedure to address the fuel rod failures during LB-LOCA transient in Atucha-2 NPP M Adorni, A Del Nevo, F D'Auria, O Mazzantini Science and Technology of Nuclear Installations 2011, 2011 | 9 | 2011 |
The best estimate plus uncertainty challenge in the current licensing process of present reactors F D'Auria, O Mazzantini Science and Technology of Nuclear Installations 2011, 2011 | 9 | 2011 |
RELAP/SCDAPSIM/MOD3. 6–Development of Severe Accident Models for Heavy Water Reactors Including CANDU and ATUCHA-2 A Bonelli, O Mazzantini, D Dupleac, E Dinca, LJ Siefken, CM Allison, ... Proc. ICAPP, 03-06, 2015 | 8 | 2015 |
Prediction of Margins in the TBS Seismic Considerations Analysis for Circumferential Surface-Cracked Piping Under Beyond Design Basis Seismic Loading M Uddin, F Brust, G Wilkowski, T Zhang, AA Betervide, O Mazzantini, ... Pressure Vessels and Piping Conference 46070, V008T08A025, 2014 | 8 | 2014 |
Welding residual stress in a large diameter nuclear reactor pressure vessel nozzle T Zhang, FW Brust, G Wilkowski, H Xu, AA Betervide, O Mazzantini Journal of Pressure Vessel Technology 135 (2), 021208, 2013 | 7 | 2013 |
Instrumenting full-scale Boron Injection Test Facility to support Atucha-2 NPP licensing F Moretti, F Terzuoli, F D'Auria, O Mazzantini Nuclear Engineering and Design 336, 154-162, 2018 | 6 | 2018 |
Beyond design basis seismic analysis for atucha II nuclear plant T Zhang, FW Brust, G Wilkowski, H Xu, AA Betervide, O Mazzantini International Conference on Nuclear Engineering 44991, 625-634, 2012 | 6 | 2012 |
LBB Under Beyond Design Basis Seismic Loading T Zhang, FW Brust, G Wilkowski, H Xu, AA Betervide, O Mazzantini Pressure Vessels and Piping Conference 55072, 55-64, 2012 | 6 | 2012 |
Development and application of MCNP5 and KENO-VI Monte Carlo models for the Atucha-2 PHWR analysis M Pecchia, C Parisi, F D'Auria, O Mazzantini Science and Technology of Nuclear Installations 2011, 2011 | 6 | 2011 |