Follow
Andres Pastor Fernandez (ORCID: 0000-0002-5265-9013
Andres Pastor Fernandez (ORCID: 0000-0002-5265-9013
Verified email at gm.uca.es - Homepage
Title
Cited by
Cited by
Year
Integration of cost and work breakdown structures in the management of construction projects
A Cerezo-Narváez, A Pastor-Fernández, M Otero-Mateo, ...
Applied sciences 10 (4), 1386, 2020
802020
Sistemas integrados de gestión
AP Fernández
Sistemas integrados de gestión, 2013
622013
Project management competences by teaching and research staff for the sustained success of engineering education
A Cerezo-Narváez, I de los Ríos Carmenado, A Pastor-Fernández, ...
Education Sciences 9 (1), 44, 2019
362019
Standardizing innovation management: An opportunity for SMEs in the aerospace industry
A Cerezo-Narváez, D García-Jurado, MC González-Cruz, ...
Processes 7 (5), 282, 2019
322019
Performance comparison of activity sensitivity metrics in schedule risk analysis
P Ballesteros-Pérez, A Cerezo-Narvaez, M Otero-Mateo, ...
Automation in Construction 106, 102906, 2019
282019
Development of professional competences for industry 4.0 project management
A Cerezo-Narvaez, M Otero-Mateo, A Pastor-Fernandez
7th IESM Conference Proceedings. International Conference on Industrial …, 2017
282017
Impacto de la norma ISO 9001: 2015 en el ámbito de la ingeniería: integración en las PYMEs
A Pastor-Fernández, M Otero-Mateo
Dyna 2 (91), 118-121, 2016
282016
Trends of digital transformation in the shipbuilding sector
A Sánchez-Sotano, A Cerezo-Narváez, F Abad-Fraga, ...
New Trends in the Use of Artificial Intelligence for the Industry 4.0, 2020
262020
Energy, emissions and economic impact of the new nZEB regulatory framework on residential buildings renovation: Case study in southern Spain
A Cerezo-Narváez, JM Piñero-Vilela, EÁ Rodríguez-Jara, M Otero-Mateo, ...
Journal of Building Engineering 42, 103054, 2021
252021
Training Competences in Industrial Risk Prevention with Lego® Serious Play®: A Case Study
A Cerezo-Narváez, A Córdoba-Roldán, A Pastor-Fernández, ...
Safety 5 (4), 81, 2019
212019
The relationship between building agents in the context of integrated project management: A prospective analysis
A Cerezo-Narváez, A Pastor-Fernández, M Otero-Mateo, ...
Buildings 11 (5), 184, 2021
172021
Digital transformation of requirements in the industry 4.0: Case of naval platforms
A Cerezo-Narvaez, M Otero-Mateo, F Rodriguez-Pecci, ...
Dyna 93 (4), 2018
172018
Use of Low-Cost Devices for the Control and Monitoring of CO2 Concentration in Existing Buildings after the COVID Era
A Pastor-Fernandez, A Cerezo-Narvaez, P Montero-Gutierrez, ...
Applied Sciences 12 (8), 3927, 2022
142022
Forecasting the project duration average and standard deviation from deterministic schedule information
P Ballesteros-Pérez, A Cerezo-Narváez, M Otero-Mateo, ...
Applied Sciences 10 (2), 654, 2020
142020
Influence of scope management in construction industry projects
A Cerezo-Narváez, M Otero-Mateo, A Pastor-Fernández
DYNA Management, 4, 1-15., 2016
122016
La Certificación LEED, cómo cumplir con un conjunto de normas para la sostenibilidad en el proyecto de ingeniería
JM Portela, JL Viguera, A Pastor, MM Huerta, M Otero
XVIII Congreso Nacional de Ingeniería Mecánica. Departamento de Ingeniería …, 2010
122010
Knowledge as an organizational asset for managing complex projects: the case of naval platforms
A Cerezo-Narváez, A Pastor-Fernández, M Otero-Mateo, ...
Sustainability 13 (2), 885, 2021
112021
Forecasting accuracy of in-progress activity duration and cost estimates
P Ballesteros-Pérez, E Sanz-Ablanedo, A Cerezo-Narváez, G Lucko, ...
Journal of construction engineering and management 146 (9), 04020104, 2020
112020
Determination of the Insulation Solution that Leads to Lower CO2 Emissions during the Construction Phase of a Building
MJ Bastante-Ceca, A Cerezo-Narváez, JM Piñero-Vilela, ...
Energies 12 (12), 2400, 2019
112019
La Dirección de proyectos en el marco de la inteligencia artificial. Nuevos retos y tendencias para el desarrollo de competencias.
A Pastor Fernández, A Cerezo Narváez, M Otero Mateo, ...
72021
The system can't perform the operation now. Try again later.
Articles 1–20