Follow
Kareem Mostafa
Title
Cited by
Cited by
Year
Review of image-based analysis and applications in construction
K Mostafa, T Hegazy
Automation in Construction 122, 103516, 2021
762021
Risk assessment for construction of urban rail transit projects
H Yan, C Gao, H Elzarka, K Mostafa, W Tang
Safety science 118, 583-594, 2019
652019
Wearable devices: Cross benefits from healthcare to construction
Z Abuwarda, K Mostafa, A Oetomo, T Hegazy, P Morita
Automation in Construction 142, 104501, 2022
272022
Enhanced Repetitive-Scheduling Computation and Visualization
T Hegazy, DA Saad, K Mostafa
Journal of Construction Engineering and Management 146 (10), 04020118, 2020
242020
Tetris-inspired approach for generating tightly-packed repetitive schedules
T Hegazy, K Mostafa, S Ojulari
Automation in Construction 124, 103601, 2021
192021
Evolution of BIM adoption and implementation by the construction industry over the past decade: a replication study
K Mostafa, F Leite
Construction Research Congress 2018, 180-189, 2018
142018
Data mining of school inspection reports to identify the assets with top renewal priority
K Mostafa, A Attalla, T Hegazy
Journal of Building Engineering 41, 102404, 2021
102021
Hands-On Class Exercise for Efficient Planning and Execution of Modular Construction
T Hegazy, K Mostafa, ME Esfahani
Journal of Civil Engineering Education 146 (3), 05020002, 2020
92020
Enhanced repetitive scheduling formulation for meeting deadlines and resource constraints in linear and scattered projects
K Mostafa, S Ojulari, T Hegazy
Canadian Journal of Civil Engineering 50 (3), 172-183, 2022
62022
Utilizing different artificial intelligence techniques for efficient condition assessment of building components
H Ahmed, K Mostafa, T Hegazy
Canadian Journal of Civil Engineering, 2023
22023
Potential of Bayesian networks for forecasting the ripple effect of progress events
K Mostafa, T Hegazy
2019 Canadian Society for Civil Engineering Annual Conference, CSCE 2019, 2019
2*2019
Environmental Impact and Cost Assessment for Reusing Waste during End-of-Life Activities on Building Projects
F Saeed, K Mostafa, C Rausch, T Hegazy
Journal of Construction Engineering and Management 149 (10), 04023099, 2023
12023
Enhanced CPM/LOB Repetitive Scheduling Formulation to Meet Deadlines
T Hegazy, K Mostafa
Canadian Society of Civil Engineering Annual Conference, 337-346, 2021
12021
Project Controls and Management Systems: Current Practice and How It Has Changed over the Past Decade
K Mostafa, W O’Brien
ICCREM 2019: Innovative Construction Project Management and Construction …, 2019
12019
Long-Term Failure Behaviors of Pipes Equipped with Cathodic Protection
TC Dodanwala, K Mostafa, R Ruparathna
Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, 2024
2024
Agent-Based Simulation of Multi-Crew Allocation to Scattered Repetitive Projects
F Saeed, K Mostafa, M Soliman, T Hegazy
Construction Research Congress 2024, 1220-1228, 2024
2024
Using image analysis to quantify defects and prioritize repairs in built-up roofs
K Mostafa, T Hegazy, RD Hunsperger, S Elias
Facilities 41 (7/8), 498-509, 2023
2023
Flexible Data Mining for Prioritizing Critical Building Components
K Mostafa, H Ahmed, T Hegazy
Transforming Construction with Reality Capture Technologies, 2022
2022
Tightly-Packed Repetitive Schedules: A Tetris Challenge
T Hegazy, K Mostafa
IOP Conference Series: Materials Science and Engineering 1218 (1), 012010, 2022
2022
Machine-Learning Framework for Efficient Multi-Asset Rehabilitation Planning
KT Mostafa
University of Waterloo, 2021
2021
The system can't perform the operation now. Try again later.
Articles 1–20