Follow
LAYTH KRAIDI
LAYTH KRAIDI
L Kraidi
Verified email at ljmu.ac.uk
Title
Cited by
Cited by
Year
Effect of initial pH value on the removal of reactive black dye from water by electrocoagulation (EC) method
KS Hashim, AH Hussein, SL Zubaidi, P Kot, L Kraidi, R Alkhaddar, ...
Journal of Physics: Conference Series 1294 (7), 072017, 2019
1182019
Decolourization of dye solutions by electrocoagulation: an investigation of the effect of operational parameters
KS Hashim, NH Al-Saati, SS Alquzweeni, SL Zubaidi, P Kot, L Kraidi, ...
IOP Conference Series: Materials Science and Engineering 584, 012024, 2019
1092019
Analyzing the critical risk factors associated with oil and gas pipeline projects in Iraq
L Kraidi, R Shah, W Matipa, F Borthwick
International Journal of Critical Infrastructure Protection 24, 14-22, 2019
682019
An investigation of mitigating the safety and security risks allied with oil and gas pipeline projects
L Kraidi, R Shah, W Matipa, F Borthwick
Journal of Pipeline Science and Engineering 1 (3), 349-359, 2021
372021
Using stakeholders’ judgement and fuzzy logic theory to analyze the risk influencing factors in oil and gas pipeline projects: Case study in Iraq, Stage II
L Kraidi, R Shah, W Matipa, F Borthwick
International Journal of Critical Infrastructure Protection 28, 100337, 2020
322020
2nd International Scientific Conference
KS Hashim, AH Hussein, SL Zubaidi, P Kot, L Kraidi, R Alkhaddar, ...
Al-Qadisiyah University, 2019
182019
Development of risk optimisation model for oil and gas transportation pipeline routes
L Kraidi, R Shah, W Matipa, F Borthwick, K Hashim
IOP Conference Series: Materials Science and Engineering 584 (1), 012025, 2019
92019
Analyzing the critical risk factors in oil and gas pipelines projects regarding the perceptions of the stakeholders
L Kraidi, RK Shah, WM Matipa, F Borthwick
CCC 2018-Proceedings, 2018
92018
Analyzing Stakeholders' Perceptions of the Critical Risk Factors in Oil and Gas Pipeline Projects
L Kraidi, R Shah, W Matipa, F Borthwick
Periodica Polytechnica Architecture 50 (2), 155-162, 2019
82019
An analysis of the critical risk factors in oil and gas pipeline projects using a comprehensive risk management framework
L Kraidi, RK Shah, WM Matipa, F Borthwick
ARCOM Conference Proceedings, 360-369, 2018
82018
Analysing the Critical Risk Factors of Oil and Gas Pipeline Projects in Iraq
L Kraidi, RK Shah, WM Matipa, F Borthwick
The 3rd BUiD Doctoral Research Conference 2017 Proceedings, 133-148, 2018
72018
Development of an Integrated Risk Management Framework for Oil and Gas Pipeline Projects
L Kraidi
PQDT-Global, 2020
52020
Application of Fuzzy Logic Theory on Risk Assessment in Oil and Gas Pipeline Projects.
L Kraidi, RK Shah, WM Matipa, F Borthwick
ASC 2019 International Conference, 2019
52019
The development of a questionnaire survey to investigate the critical risk factors in oil and gas pipelines projects
L Kraidi, RK Shah, WM Matipa, F Borthwick
CCC 2018-Proceedings, 2018
52018
Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects
R Shah, L Kraidi, W Matipa, F Borthwick
Global Congress on Manufacturing and Management, 313-326, 2021
22021
Analysing Delay Impact from Potential Risk Factors on Project Delivery of Oil and Gas Pipeline: A Case Study in Iraq
RK Shah, K Layth, WM Matipa, F Borthwick
Journal of Construction Research 2 (2), 42-55, 2021
12021
Analyzing the Safety Risk Factors and Adaptation Measures in Downstream Oil and Gas Industry
R Shah, M Tyyab, PG Student, L Kraidi
Proceedings of 59th Annual Associated Schools 4, 166-174, 2023
2023
A Model for Delay Analysis Impact at Planning Phase of Oil & Gas Pipeline Projects: A case of Iraq
RK Shah, L Kraidi, WM Matipa, F Borthwick
EPiC Series in Built Environment: ASC 2022, 58th Annual Associated Schools …, 2022
2022
Quantitative Analysis of the Delay Factors in Oil and Gas Pipeline Projects
L Kraidi, R Shah, W Matipa, F Borthwick
EPiC Series in Built Environment 1, 356-363, 2020
2020
Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects
L Kraidi, R Shah, W Matipa, F Borthwick
2020
The system can't perform the operation now. Try again later.
Articles 1–20