Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives Y Kara, U Ozcan, A Peker Applied Mathematics and Computation 184 (2), 566-588, 2007 | 85 | 2007 |
An approach for balancing and sequencing mixed-model JIT U-lines Y Kara, U Ozcan, A Peker The International Journal of Advanced Manufacturing Technology 32, 1218-1231, 2007 | 72 | 2007 |
Parameter setting of the Fuzzy ART neural network to part–machine cell formation problem A Peker, Y Kara International Journal of Production Research 42 (6), 1257-1278, 2004 | 29 | 2004 |
Montaj hatlarında çalışma duruşlarının reba yöntemi ile analizi ve ergonomik risk değerlendirmesi, 7 Y Kara, Y Atasagun, A Peker Uluslararası İş Sağlığı Ve Güvenliği Konferansı, İstanbul-Türkiye 5 (7), 2014 | 20 | 2014 |
1993 Yılları arasında Karaman yöresinde meydana gelen traktör ve tarım iş makineleri kazalarının değerlendirilmesi A Peker, A Özkan Tarımsal mekanizasyon 15, 20-22, 1973 | 19 | 1973 |
Karışık modelli U-tipi montaj hatlarında hat dengeleme ve model sıralama problemleri için yeni bir sezgisel yaklaşım U Özcan, A Peker | 10 | 2007 |
Bir Hazır Giyim Üretim Hattında Yalın Üretim Uygulamasının Hat Performansı Üzerindeki Etkilerinin Araştırılması MC Kara, A Peker Yöneylem Araştırması/Endüstri Mühendisliği-XXIV Ulusal Kongresi, Gaziantep-Adana, 2004 | 6 | 2004 |
A simulated annealing approach for balancing and sequencing of mixed model U lines Y Kara, U Özcan, A Peker | 3 | 2004 |
An Ergonomic Study on Dentists Working Posture in Faculty of Dentistry in Konya N KARABACAK, A PEKER Journal of Selcuk University Natural and Applied Science 5 (2), 1-14, 2016 | 2 | 2016 |
Balancing and sequencing of mixed model U lines with multiple objectives Y Kara, U Özcan, A Peker | 2 | 2004 |
Evaluation of the frequency and affecting factors of smoking among university students. R Kutlu, A Peker, S Çİvİ Türkiye Klinikleri Cardiovascular Sciences 21 (3), 335-342, 2009 | 1 | 2009 |
KARIŞIK MODELLİ U-TİPİ MONTAJ HATLARINDA HAT DENGELEME VE MODEL SIRALAMA PROBLEMLERİ İÇİN YENİ BİR SEZGİSEL YAKLAŞIM U Özcan, A Peker Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi 22 (2), 2007 | | 2007 |
Parameter setting of the fuzzy ART neural network to the part-machine cell formation problem (vol 42, pg 1257, 2003) Y Kara, A Peker INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 42 (9), 1895-1895, 2004 | | 2004 |
FLOW SHOP SCHEDULING PROBLEMS SOLVING WITH SIMULATED ANNEALING FOR INCREASING THE PERFORMANCE A PARAMETERS OPTIMIZATION A Peker, O Engin | | |
PARAMETER OPTIMIZATION IN ANT-SYSTEM TO IMPROVE ITS SOLUTION PERFORMANCE IN FLOW-SHOP SCHEDULING PROBLEMS A Peker, O Engin, K Alaykıran | | |
BİR HAZIR GİYİM ÜRETİM HATTINDA YALIN ÜRETİM UYGULAMASININ HAT PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN ARAŞTIRILMASI MC Kara, A Peker | | |