A hybrid particle swarm optimization algorithm for a no-wait flow shop scheduling problem with the total flow time M Akhshabi, R Tavakkoli-Moghaddam, F Rahnamay-Roodposhti The International Journal of Advanced Manufacturing Technology 70, 1181-1188, 2014 | 53 | 2014 |
Solving flow shop scheduling problem using a parallel genetic algorithm M Akhshabi, J Haddadnia, M Akhshabi Procedia Technology 1, 351-355, 2012 | 37 | 2012 |
A new fuzzy multi criteria model for maintenance policy M Akhshabi Middle-East Journal of Scientific Research 10 (1), 33-38, 2011 | 30 | 2011 |
An experiment on conducting mobile learning activities on the virtual university M Akhshabi, J Khalatbari, M Akhshabi Procedia-Social and Behavioral Sciences 28, 384-389, 2011 | 28 | 2011 |
Solving flexible job-shop scheduling problem using clonal selection algorithm M Akhshabi, M Akhshabi, J Khalatbari Indian Journal of Science and Technology, 1248-1251, 2011 | 16 | 2011 |
Parallel genetic algorithm to solving job shop scheduling problem M Akhshabi, M Akhshabi, J Khalatbari Journal of Applied Sciences Research 1 (10), 1484-1489, 2011 | 9 | 2011 |
Role of the Information Technology in Supply Chain, Employment and Implementation M Akhshabi J. Basic. Appl. Sci. Res 2 (2), 1124-1129, 2012 | 8 | 2012 |
Educational standard content design system for virtual university M Akhshabi, J Khalatbari, A Derakhshan, M Akhshabi Procedia-Social and Behavioral Sciences 28, 855-861, 2011 | 8 | 2011 |
The effectiveness of the behavioral-cognitive therapy on the reduction of the rate of the depression and anxiety of the infertile women of the Rasht city J Khalatbari, S Ghorbanshirodi, M Akhshabi, T Hamzehpour, ... Indian Journal of Science and Technology, 1578-1582, 2011 | 6 | 2011 |
Relation between job satisfaction and depression of Tonekabon Township hygienic and re medical center of personnel S Ghorbanshirodi, J Khalatbari, M Akhshabi Life Sci J 9 (4), 3179-82, 2012 | 5 | 2012 |
Research on relationship between emotional intelligence and job satisfaction a survey study on Kermankhdro company’s staff S Ghorbanshirodi, J Khalatbari, M Akhshabi Advances in Environmental Biology 5 (13), 3875-3878, 2011 | 5 | 2011 |
A particle swarm optimization algorithm for solving flexible job-shop scheduling problem M Akhshabi, M Akhshabi, J Khalatbari Journal of Basic and Applied Scientific Research 1 (12), 3240-3244, 2011 | 4 | 2011 |
Bi-criteria flow shop scheduling with fuzzy simulated annealing algorithm M Akhshabi, M Akhshabi, J Khalatbari African Journal of Business Management 6 (25), 7478, 2012 | 3 | 2012 |
Relationships between perceived child rearing practices, perceived stress and D personality type with tendency for substance abuse J Khalathari, SH Ghorbanshirodi, M Akhshabi, Z Sedaghati, H Karimi European Journal of Scientific Research 65 (3), 386-394, 2011 | 3 | 2011 |
Proposing a clonal selection algorithm for hybrid flow shop M Akhshabi, M Akhshabi, J Khalatbari African Journal of Business Management 6 (17), 5744, 2012 | 2 | 2012 |
Hybrid flow shop scheduling problem with set up depend sequence with respect to PM M Akhshabi, SM Taghavifard, M Akhshabi Indian Journal of Fundamental and Applied Life Sciences 2 (2), 244-250, 2012 | 2 | 2012 |
A Genetic Algorithm for Solving a New Mathematical Model of Single Machine Scheduling with Three Criteria M Akhshabi Australian Journal of Basic and Applied Sciences 4 (11), 5564-5570, 2010 | 2 | 2010 |
Hybrid genetic algorithm for minimizing the maximum lateness on uniform parallel machines M Akhshabi, M Akhshabi, FR Roodposhti Journal of Basic and Applied Scientific Research 1 (10), 1411-1414, 2011 | 1 | 2011 |
Using a parallel genetic algorithm for minimizing the maximum lateness on uniform parallel machines M Akhshabi Indian Journal of Fundamental and Applied Life Sciences 1 (4), 386-391, 2011 | 1 | 2011 |
Adjustment comparison of level of organizational citizenship behavior (OCB) of staff in Higher Education (Studied at universities of Ilam). M Akhshabi, H Givryan Caspian Journal of Applied Sciences Research 3 (3), 2014 | | 2014 |