Follow
Joachim Arts
Title
Cited by
Cited by
Year
Maintenance spare parts planning and control: a framework for control and agenda for future research
M Driessen, J Arts, GJ Van Houtum, JW Rustenburg, B Huisman
Production Planning & Control 26 (5), 407-426, 2015
176*2015
Design of multi-component periodic maintenance programs with single-component models
J Arts, R Basten
IISE transactions 50 (7), 606-615, 2018
452018
Efficient optimization of the dual-index policy using Markov chains
J Arts, M van Vuuren, G Kiesmüller
IIE Transactions 43 (8), 604-620, 2011
442011
Maintenance modeling and optimization
JJ Arts
Technische Universiteit Eindhoven, 2017
39*2017
Repairable stocking and expediting in a fluctuating demand environment: Optimal policy and heuristics
J Arts, R Basten, GJ Van Houtum
Operations Research 64 (6), 1285-1301, 2016
352016
Spare parts planning and control for maintenance operations
JJ Arts
332013
A multi-item approach to repairable stocking and expediting in a fluctuating demand environment
J Arts
European Journal of Operational Research 256 (1), 102-115, 2017
322017
Analysis of a two-echelon inventory system with two supply modes
J Arts, GP Kiesmüller
European Journal of Operational Research 225 (2), 263-272, 2013
312013
Maintenance location routing for rolling stock under line and fleet planning uncertainty
DD Tönissen, JJ Arts, ZJ Shen
Transportation Science 53 (5), 1252-1270, 2019
292019
Aggregate overhaul and supply chain planning for rotables
J Arts, SD Flapper
Annals of Operations Research 224 (1), 77-100, 2015
252015
Maintenance service logistics
J Arts, R Basten, GJ van Houtum
Operations, logistics and supply chain management, 493-517, 2019
232019
The stochastic maintenance location routing allocation problem for rolling stock
DD Tönissen, JJ Arts
International Journal of Production Economics 230, 107826, 2020
202020
Expediting in two-echelon spare parts inventory systems
M Drent, J Arts
Manufacturing & Service Operations Management 23 (6), 1431-1448, 2021
162021
Economies of scale in recoverable robust maintenance location routing for rolling stock
DD Tönissen, JJ Arts
Transportation Research Part B: Methodological 117, 360-377, 2018
162018
Real-time integrated learning and decision making for cumulative shock degradation
C Drent, M Drent, J Arts, S Kapodistria
Manufacturing & Service Operations Management 25 (1), 235-253, 2023
14*2023
Additive manufacturing in the spare parts supply chain
B Wullms, JJ Arts, EE Topan, H van der Schoot, J Schindler-Chaloub
Eindhoven Univ. Tech 11, 85, 2014
92014
Projected Inventory-Level Policies for Lost Sales Inventory Systems: Asymptotic Optimality in Two Regimes
W van Jaarsveld, J Arts
Operations Research, 2024
82024
Base-stock policies for lost-sales models: Aggregation and asymptotics
J Arts, R Levi, GJ van Houtum, B Zwart
Technische Universiteit Eindhoven, 2015
82015
A column-and-constraint generation algorithm for two-stage stochastic programming problems
DD Tönissen, JJ Arts, ZJM Shen
Top 29 (3), 781-798, 2021
72021
An aggregate planning for preventive maintenance of bogies by NedTrain
K Vernooij
Master’s thesis, Eindhoven University of Technology, School of Industrial …, 2011
62011
The system can't perform the operation now. Try again later.
Articles 1–20