追蹤
Chao-Tang Tseng
Chao-Tang Tseng
朝陽科大工管系
在 cyut.edu.tw 的電子郵件地址已通過驗證
標題
引用次數
引用次數
年份
A discrete version of particle swarm optimization for flowshop scheduling problems
CJ Liao, CT Tseng, P Luarn
Computers & Operations Research 34 (10), 3099-3111, 2007
5722007
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
CT Tseng, CJ Liao
European Journal of Operational Research 191 (2), 360-373, 2008
2132008
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
CT Tseng, CJ Liao
International journal of production research 46 (17), 4655-4670, 2008
1292008
A performance evaluation of permutation vs. non-permutation schedules in a flowshop
CJ Liao, LM Liao, CT Tseng
International Journal of Production Research 44 (20), 4297-4309, 2006
512006
A note on two-stage hybrid flowshop scheduling with missing operations
CT Tseng, CJ Liao, TX Liao
Computers & Industrial Engineering 54 (3), 695-704, 2008
452008
Minimizing total tardiness on a single machine with controllable processing times
CT Tseng, CJ Liao, KL Huang
Computers & Operations Research 36 (6), 1852-1858, 2009
412009
Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy
SW Chiu, CT Tseng, MF Wu, PC Sung
Journal of applied research and technology 12 (3), 615-622, 2014
252014
Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach
CT Tseng, MF Wu, HD Lin, YSP Chiu
Economic Modelling 36, 30-36, 2014
172014
A least flexibility first heuristic to coordinate setups in a two-or three-stage supply chain
CJ Liao, CC Shyu, CT Tseng
International Journal of Production Economics 117 (1), 127-135, 2009
172009
Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system
SW Chiu, CS Wu, CT Tseng
Operations Research Perspectives 6, 100115, 2019
142019
A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision
CT Tseng, CH Lee, YSP Chiu, WT Lu
International Journal of Production Research 55 (11), 3149-3163, 2017
112017
Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach
SW Chiu, PC Sung, CT Tseng, YSP Chiu
NISCAIR-CSIR, India, 2015
92015
An electromagnetism-like mechanism for the single machine total stepwise tardiness problem with release dates
CT Tseng, KH Chen
Engineering Optimization 45 (12), 1431-1448, 2013
92013
Determining cycle time for a multi-product FPR model with rework and an improved delivery policy by alternative approach
YSP Chiu, HD Lin, CT Tseng, SW Chiu
International Journal for Engineering Modelling 29 (1-4), 27-36, 2016
52016
An ambient intelligence system for water release scheduling in cascade hydropower systems
CT Tseng, YL Lee, CC Chou
Journal of Ambient Intelligence and Humanized Computing 6, 47-55, 2015
32015
A Variable Neighborhood Search for the single machine total stepwise tardiness problem
CT Tseng, YC Chou, WY Chen
Proceedings of the 2010 international conference on engineering, project and …, 2010
32010
A new electromagnetism-like mechanism for identical parallel machine scheduling with family setup times
CT Tseng, CH Lee
The International Journal of Advanced Manufacturing Technology 89, 1865-1874, 2017
22017
Heuristics for parallel machine scheduling with GoS eligibility constraints
CT Tseng, SF Zhang
International Journal of Applied Science and Engineering 20 (3), 1-12, 2023
12023
An application of variable neighbourhood search to hospital call scheduling of infant formula promotion
HY Lin, CJ Liao, CT Tseng
Journal of the Operational Research Society 62 (6), 949-959, 2011
12011
Particle Swarm Optimization for Solving Scheduling Problems
CT Tseng
2006
系統目前無法執行作業,請稍後再試。
文章 1–20