A discrete version of particle swarm optimization for flowshop scheduling problems CJ Liao, CT Tseng, P Luarn Computers & Operations Research 34 (10), 3099-3111, 2007 | 572 | 2007 |
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem CT Tseng, CJ Liao European Journal of Operational Research 191 (2), 360-373, 2008 | 213 | 2008 |
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks CT Tseng, CJ Liao International journal of production research 46 (17), 4655-4670, 2008 | 129 | 2008 |
A performance evaluation of permutation vs. non-permutation schedules in a flowshop CJ Liao, LM Liao, CT Tseng International Journal of Production Research 44 (20), 4297-4309, 2006 | 51 | 2006 |
A note on two-stage hybrid flowshop scheduling with missing operations CT Tseng, CJ Liao, TX Liao Computers & Industrial Engineering 54 (3), 695-704, 2008 | 45 | 2008 |
Minimizing total tardiness on a single machine with controllable processing times CT Tseng, CJ Liao, KL Huang Computers & Operations Research 36 (6), 1852-1858, 2009 | 41 | 2009 |
Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy SW Chiu, CT Tseng, MF Wu, PC Sung Journal of applied research and technology 12 (3), 615-622, 2014 | 25 | 2014 |
Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach CT Tseng, MF Wu, HD Lin, YSP Chiu Economic Modelling 36, 30-36, 2014 | 17 | 2014 |
A least flexibility first heuristic to coordinate setups in a two-or three-stage supply chain CJ Liao, CC Shyu, CT Tseng International Journal of Production Economics 117 (1), 127-135, 2009 | 17 | 2009 |
Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system SW Chiu, CS Wu, CT Tseng Operations Research Perspectives 6, 100115, 2019 | 14 | 2019 |
A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision CT Tseng, CH Lee, YSP Chiu, WT Lu International Journal of Production Research 55 (11), 3149-3163, 2017 | 11 | 2017 |
Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach SW Chiu, PC Sung, CT Tseng, YSP Chiu NISCAIR-CSIR, India, 2015 | 9 | 2015 |
An electromagnetism-like mechanism for the single machine total stepwise tardiness problem with release dates CT Tseng, KH Chen Engineering Optimization 45 (12), 1431-1448, 2013 | 9 | 2013 |
Determining cycle time for a multi-product FPR model with rework and an improved delivery policy by alternative approach YSP Chiu, HD Lin, CT Tseng, SW Chiu International Journal for Engineering Modelling 29 (1-4), 27-36, 2016 | 5 | 2016 |
An ambient intelligence system for water release scheduling in cascade hydropower systems CT Tseng, YL Lee, CC Chou Journal of Ambient Intelligence and Humanized Computing 6, 47-55, 2015 | 3 | 2015 |
A Variable Neighborhood Search for the single machine total stepwise tardiness problem CT Tseng, YC Chou, WY Chen Proceedings of the 2010 international conference on engineering, project and …, 2010 | 3 | 2010 |
A new electromagnetism-like mechanism for identical parallel machine scheduling with family setup times CT Tseng, CH Lee The International Journal of Advanced Manufacturing Technology 89, 1865-1874, 2017 | 2 | 2017 |
Heuristics for parallel machine scheduling with GoS eligibility constraints CT Tseng, SF Zhang International Journal of Applied Science and Engineering 20 (3), 1-12, 2023 | 1 | 2023 |
An application of variable neighbourhood search to hospital call scheduling of infant formula promotion HY Lin, CJ Liao, CT Tseng Journal of the Operational Research Society 62 (6), 949-959, 2011 | 1 | 2011 |
Particle Swarm Optimization for Solving Scheduling Problems CT Tseng | | 2006 |