Follow
Mahmoud Abbas Mahmoud Al-Naimi
Mahmoud Abbas Mahmoud Al-Naimi
Other namesMahmoud Abbas Mahmoud, Mahmoud A. Mahmoud, Mahmoud Al-Naimi
Dijlah University College, Iraq
Verified email at hiuc.edu.iq
Title
Cited by
Cited by
Year
Classification of Production Systems
MA Mahmoud
University of Technology: Baghdad, Iraq, 2014
62014
Balancing mixed-model assembly line in electronic industries company
S Sabeeh Al-Zubaidy, M Abbas Mahmoud, I Dhiaa Khalaf
Engineering and Technology Journal 34 (2), 233-244, 2016
52016
Process Capability Evaluation for Non-normally Distributed One
MA Mahmoud, SA Aufy
Engineering and Technology Journal 31 (17), 2013
52013
Degradation of Anti-Inflammatory Drugs in Synthetic Wastewater by Solar Photocatalysis
M Al-Jemeli, MA Mahmoud, HS Majdi, MF Abid, HM Abdullah, ...
Catalysts 11 (2021), 2021
32021
Construction project planning using integration of crashing and concurrency techniques
HN Hady, LA AL-Kindi, MA Mahmoud
IOP Conference Series: Materials Science and Engineering 737, 2020
32020
Evolution of MRP-type systems
MA Mahmoud
University of Technology Baghdad–Iraq, 2015
32015
Scope of Operations Management
MA Mahmoud
University of Technology Baghdad–Iraq, 2015
22015
Determine The Optimal Sequence - dependent Setup Cost and / or Setup Time for Single Demand with Multiple Products Using Modified Assignment Method
WH Laith, SSA Ali, MA Mahmoud
Industrial Engineering Letters 5 (8), 2015
22015
Assessing New Product Sustainability Index (NPSI) by Integrating Sustainability Aspects into the Early New Product Design Stages
AB Wali, MA Mahmoud, JHA Katib
Engineering & Technology Journal 30 (10), 2012
22012
Applying Fuzzy Multi-Criteria Decision Making and Different Techniques to Solve Multi Objective Project Planning
MA Mahmoud, L Adnan, HN Hady
12018
Integrated Decision Making in Production Department inside Internal Supply Chain
WH Laith, SSA Ali, MA Mahmoud
American Journal of Industrial Engineering 4 (1), 2016
12016
Determine the Optimal Sequence-Dependent Completion Times for Multiple Demand with Multi-Products Using Genetic Algorithm
WH Laith, SSA Ali, MA Mahmoud
Journal of Information Engineering and Applications 5 (8), 2015
12015
Developing Multistage Heuristic Algorithm to Minimize Idle Time and Makespan in Job Shop Scheduling
MA Mahmoud
Engineering & Technology Journal 28 (14), 2010
12010
Characterization of Minerals and Health Impact of Metals in Dust Storm Fallen on Baghdad, Iraq
MI Mohammed, MF Abid, I Albassam, HM Abdullah, AA Abdul Razak, ...
Asian Journal of Water, Environment and Pollution 21 (1), 53-61, 2024
2024
Decision Tree Algorithm and Learning Algorithms for Blood Data Diagnosis
ZS Tawfik, AA Albla, MA Mahmoud
2022
Removal of Toxic Gases from Ambient Air Using Photocatalytic Asphalt Pavement
2022
Establishing Methodology for Integrating Decision Making in Internal Supply Chain
MAM W. H. Laith, S. S. Al-Zubaidy
2018
Determination Optimum Inventory Level for Material Using Genetic Algorithm
WH Laith, SS Al-Zubaidy, MA Mahmoud
Journal of Engineering 24 (1), 218-230, 2018
2018
Establishing Methodology for Integrating Decision Making in Internal Supply Chain
SS Al-Zubaidy, WH Laith, MA Mahmoud
University of Thi-Qar Journal for Engineering Sciences 9 (2), 53-62, 2018
2018
Decision Making to Select the Best Order Quantity (BOQ) from Supplier using Genetic Algorithm
WH Laith, SSA Ali, MA Mahmoud
IARJSET 3 (8), 2016
2016
The system can't perform the operation now. Try again later.
Articles 1–20