Model of room and pillar production planning in small scale underground mines with metal price and operating cost uncertainty Z Gligoric, M Gligoric, B Dimitrijevic, I Grozdanovic, A Milutinovic, A Ganic, ... Resources Policy 65, 101235, 2020 | 9 | 2020 |
Measuring methods for cross sections of underground mine chambers A Ganić, A Milutinović, R Tokalić, S Ognjanović Podzemni radovi, 101-108, 2011 | 8 | 2011 |
Application of polymer composites for stabilization of degraded rock mass in mining P Trifunović, R Tokalić, A Ganić Podzemni radovi, 23-31, 2013 | 6 | 2013 |
Neogene geodynamics in the light of 3-D visualization–an example along the Sava River (Belgrade) M Ganić, S KNEŽEVIĆ, LJ Rundić, A Milutinović, A Ganić Proceedings of the 17th Meeting of the Association of European Geological …, 2011 | 5 | 2011 |
Ground surface subsidence monitoring using Sentinel-1 in the “Kostolac” open pit coal mine Z Gojković, M Kilibarda, L Brajović, M Marjanović, A Milutinović, A Ganić Remote Sensing 15 (10), 2519, 2023 | 3 | 2023 |
Optimisation of underground mine decline development system using genetic algorithm Z Gligorić, A Ganić, R Tokalić, A Milutinović Podzemni radovi 22 (25), 33-40, 2014 | 3 | 2014 |
User defined function for transformation of ellipsoidal coordinates A Ganić, A Milutinović, M Ganić Podzemni radovi, 35-47, 2014 | 3 | 2014 |
Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2 SD adit of the'Blagodat'mine V Stoiljković, A Milutinović, A Ganić, R Mikanović Podzemni radovi, 33-44, 2013 | 3 | 2013 |
The new state reference system of the Republic of Serbia and division into map and layout series A Ganić, A Milutinović, P Trifunović Podzemni radovi, 177-191, 2012 | 2 | 2012 |
Gate Road Support Deformation Forecasting Based on Multivariate Singular Spectrum Analysis and Fuzzy Time Series L Crnogorac, R Tokalić, Z Gligorić, A Milutinović, S Lutovac, A Ganić Energies 14 (12), 3710, 2021 | 1 | 2021 |
Forecasting the building deformation using the non-equidistance Grey Model (1, 1) A Milutinović, Z Gligorić, Z Gojković, A Ganić Podzemni radovi, 49-59, 2020 | 1 | 2020 |
Application of JKSimBlast software in drifting operations L Crnogorac, R Tokalić, S Lutovac, M Gligorić, A Ganić Podzemni radovi, 37-48, 2019 | 1 | 2019 |
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of" Podbracan" A Milutinovic, A Ganic, TR Diyab, R Tokalic, M Ganic Rem: Revista Escola de Minas 68, 323-330, 2015 | 1 | 2015 |
Standard deviation of the geodetic quadrilateral point coordinates determined by the application of Hansen's method A Ganić, A Milutinović, Z Gojković, R Mikanović, N Vidanović Podzemni radovi, 55-64, 2015 | 1 | 2015 |
Accuracy assessment of geometrical elements for setting-out in horizontal plane of conveying chambers at the bauxite mine" Kosturi" Srebrenica A Milutinovic, A Ganic, R Tokalic Archives of Mining Sciences 59 (1), 2014 | 1 | 2014 |
Angular parameters of undermined ground movement process in unknown areas D Đorđević, N Vušović, A Ganić, I Svrkota Podzemni radovi, 125-136, 2011 | 1 | 2011 |
GIS supported bauxite deposit geological data as a tool for mining operations design A Milutinović, A GANIĆ, M GANIĆ, I Miljanović The Geology in Digital Age: Proceedings of the 17th Meeting of the …, 2011 | 1 | 2011 |
The use of Leica Geo Office in mine surveying G Bilban, M Vulic, A Ganic MATERIALS AND GEOENVIRONMENT 54 (4), 545, 2007 | 1 | 2007 |
Geometrical control of the inclined spiral shape underground room project A Ganić, D Đorđević Podzemni radovi 12 (14), 13-18, 2004 | 1 | 2004 |
Calculation method as the source of errors in connecting and orienting underground mining rooms A Ganić, A Milutinović, I Miljanović, Z Gojković Podzemni radovi, 47-59, 2018 | | 2018 |